DC
/

US data center market

Capacity online and in the pipeline, who owns and uses it, and which grids it depends on.

Datacenter Source tracks 1,935 data centers in the United States, including 82 AI campuses. Facilities that disclose power add up to 19.21 GW online and 30.88 GW in the pipeline. These are floors, not market size: 12% of facilities have a power figure. Largest operators by tracked MW: Meta, Oracle and Google. 57.65 GW has been announced; 20.84 GW is documented as operational.

By state:Download CSVJSONAPI docsAll facilities:Download CSVJSONAPI docs
Floors, not market size. MW totals only add up facilities that disclose a figure (12% of 1,935 here); most sites don't, so the real totals are higher. “—” means not disclosed or not yet collected, never zero. CoverageData as of Oct 12, 2026
Facilities
1,935
108 campuses
Power online (floor)
19.21 GW
130 sites reporting
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.1%EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.99%
Under construction (floor)
30.88 GW
planned MW at active sites
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.13%AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.16%EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.70%
Planned
—
74 planned sites (MW not disclosed)
AI campuses
82
15.09 GW online · 29.84 GW pipeline
AI compute
12.62M
H100-equivalents (est.)
Capital (reported + est.)
$498B
$34.16B assessed

Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Percentages under each total show how much of it is backed by each evidence level.

ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assigned

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW12.5 GW25 GW37.5 GW50 GW20222023202420252026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2026
2027
2028
2029
2030

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

How to read this

Each bar sums one kind of evidence across facilities. Announced is the largest MW a company, utility, government or press source reported. Interconnection requests are MW in active large-load queue requests. Of the grid operators we ingest, only NYISO publishes these project by project. Contracted / approved means an executed interconnection agreement or a reported utility or power contract. Under construction and Operational come from construction records, imagery or operator reports.

The gap between announced and documented MW is capacity that has been claimed but not yet backed by a grid, construction or operating record. It is not proof a project won't happen. On-site generation is listed separately and never added to grid capacity. Method

Time to power puts each site's pending MW (announced minus operational) into a bucket by the midpoint of its evidence-based window. The window starts at the furthest documented stage and adds editorial ranges for what remains (e.g. announced: 2–5 yrs; land acquired: 2–4.5 yrs; planning / zoning: 1.75–4 yrs). Insufficient evidence means no dated stage evidence, not a delay. Windows are ranges, not forecasts. All ranges and rules

  • Announced57.65 GW
  • Interconnection requests—
  • Contracted / approved3.67 GW
  • Under construction27 GW
  • Operational20.84 GW

Plus 366 MW of documented on-site / dedicated generation.

13.79 GW announced at 22 sites has no grid, construction or operating record yet.

Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented
Verified operating: 459Grid-backed: 9Under construction: 74Documented development: 84Announced only: 60Unverified: 1249

Interconnection queues

Active requests to connect to the grid (CAISO, ERCOT, MISO, PJM, SPP). Requests are applications, not commitments.

How to read this

A queue request asks a grid operator (ISO/RTO) to connect a new generator or large load to the transmission system. It then moves through studies (feasibility, system impact, facilities) before an interconnection agreement, construction and service. Filing is an application, not a commitment to build. Generation totals here are active requests only.

Why most aren't built: in the queue files we ingest, PJM: 52% of 8,147 requests withdrawn, 14% in service; MISO: 55% of 3,848 requests withdrawn, 2% in service. These are shares of each published file, not completion rates. SPP, ERCOT, CAISO are left out because their files don't include withdrawn requests. Queue sources

Data-center load requests are shown only where an ISO publishes them project by project (NYISO). Elsewhere, large loads go through utilities, and the ISO figures above (e.g. ERCOT's large-load tracking) are quoted from the operator's own documents.

Generation seeking interconnection1,399.08 GW · 6,954 requests
Solar 459.27 GWStorage 360.44 GWGas 172.58 GWWind 136.76 GWSolar + storage 99.36 GWUnknown 81.59 GWOffshore wind 38.71 GWHybrid 29.05 GW
ERCOT · Large loads seeking interconnection
410 GW
~87% data centers · as of 2026-03-26

“ERCOT is tracking approximately 410 GW of Large Loads seeking interconnection of which ~87% are data centers.”

ERCOT, 2026-04-09

Coverage

How much of this scope our sources describe. Low coverage means data isn't disclosed or not yet collected, not that there's nothing there.

Data as of Oct 12, 2026
Facilities with a power figure12% (241 of 1,935)
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.12%AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.20%EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.68%
Facilities with confirmed evidence30% (590 of 1,935)
Only estimated evidence (mapping or models)67% (1,300 of 1,935)

Confirmed evidence = at least one fact about the facility itself from a filing, deed, permit, interconnection record, or government or utility record. Regional context (state prices, nearby plants, utility territory maps) doesn't count. Most facilities come from OpenStreetMap, which records that a building exists but rarely its power, owner or status.

Coverage by States
StateFacilitiesWith powerConfirmed
Virginia48221%87%
Texas19512%8%
Oregon1364%(low)0%
California1185%2%
Ohio9911%67%
Washington721%(low)0%
Arizona676%97%
Iowa646%0%
New Jersey626%2%
Georgia587%0%
Illinois5613%2%
Pennsylvania5012%4%
Nevada415%2%
New York395%0%
Tennessee307%0%
Nebraska2914%0%
North Carolina274%(low)0%
Colorado270%(low)0%
Utah2429%0%
Wyoming248%13%
Missouri225%0%
New Mexico1911%0%
Minnesota1613%6%
South Carolina1631%0%
Florida160%(low)0%
Maryland147%7%
Indiana1346%15%
Michigan138%8%
Alabama1323%0%
Oklahoma1315%0%
Wisconsin1225%8%
Mississippi1040%20%
Louisiana771%43%
Kansas70%(low)0%
Kentucky617%17%
North Dakota540%40%
Connecticut50%(low)0%
Montana425%25%
Idaho333%0%
Arkansas333%33%
Maine30%(low)0%
Massachusetts30%(low)0%
New Hampshire30%(low)0%
South Dakota333%33%
West Virginia20%(low)0%
Puerto Rico20%(low)0%
District of Columbia10%(low)0%
Vermont10%(low)0%

States

Click through to drill down

Data as of Oct 12, 2026
Online Under construction + planned
NameFacilitiesOnlinePipeline
Texas1951.82 GW8.14 GW
Virginia4825.43 GW628 MW
Louisiana7—5 GW
Wisconsin12442 MW3.57 GW
Mississippi101.89 GW2 GW
Ohio991.8 GW1.84 GW
New Mexico19114 MW2.61 GW
Iowa64512 MW1.9 GW
Indiana131.33 GW1.04 GW
Michigan13—1.4 GW
Nebraska29843 MW359 MW
Georgia58923 MW—
Arizona67577 MW190 MW
Alabama13397 MW266 MW
Oklahoma13442 MW181 MW
Utah24179 MW411 MW
Tennessee30539 MW—
North Dakota588 MW442 MW
New York39107 MW392 MW
Oregon136428 MW—
Nevada41214 MW175 MW
Pennsylvania50139 MW197 MW
Wyoming24182 MW67 MW
Minnesota16241 MW—
Idaho3198 MW—
South Carolina1690 MW78 MW
Missouri22126 MW—
North Carolina2791 MW—
New Jersey6270 MW—
California118——
Washington72——
Illinois56——
Colorado27——
Florida16——
Maryland14——
Kansas7——
Kentucky6——
Connecticut5——
Montana4——
Arkansas3——
Maine3——
Massachusetts3——
New Hampshire3——
South Dakota3——
West Virginia2——
Puerto Rico2——
District of Columbia1——
Vermont1——

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • MISO2.05 GW + 13.09 GW · 153 sites
  • PJM8.53 GW + 3.7 GW · 763 sites
  • None (non-RTO region)3.82 GW + 4.64 GW · 598 sites
  • ERCOT1.82 GW + 5.85 GW · 176 sites
  • SPP1.37 GW + 2.28 GW · 66 sites
  • NYISO107 MW + 392 MW · 40 sites
  • CAISO— · 105 sites
  • ISO-NE— · 15 sites

Largest facilities

By online + pipeline MW; badge = evidence behind each figure

Data as of Oct 12, 2026
FacilityStatusOnlinePipeline
Meta Hyperion · LAOperating + expandingAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.—5 GW AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.
Microsoft Fairwater Wisconsin · WIOperating + expandingAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.442 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.2.27 GW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
OpenAI Stargate New Mexico · NMUnder constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.—2.45 GW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Colossus 2 · MSOperating + expandingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.1.28 GW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.789 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
OpenAI Stargate Shackelford · TXUnder constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.—1.96 GW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
QTS Cedar Rapids · IAUnder constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.—1.59 GW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
OpenAI Stargate Michigan · MIUnder constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.—1.4 GW ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
Meta Prometheus · OHOperating + expandingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.612 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.716 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
OpenAI Stargate Wisconsin · WIUnder constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.—1.3 GW ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
Goodnight · TXUnder constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.—1.29 GW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
OpenAI Stargate Milam · TXUnder constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.—1.2 GW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
OpenAI Stargate Abilene · TXOperating + expandingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.590 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.590 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Anthropic-Amazon New Carlisle · INOperatingAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.1.09 GW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.—
Google Fort Wayne · INUnder constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.—1.04 GW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Amazon Ridgeland · MSOperating + expandingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.273 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.735 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.

Facilities by status

  • Operating1710
  • Operating + expanding27
  • Under construction94
  • Planned74
  • Unknown30