DC
/

Indiana Michigan Power (AEP)

What changed

Utility / energy · also matched as Indiana Michigan Power, I&M

Indiana Michigan Power (AEP) is linked to 3 tracked US data centers in 1 state as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 1.09 GW online and 1.04 GW in the pipeline (floors: 2 of 3 report power). Every relationship cites its source.

View on map →
Follow

Get changes to Indiana Michigan Power (AEP)

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Indiana Michigan Power (AEP): US data center footprint.” /companies/indiana-michigan-power. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_indiana_michigan_power_2026,
  title = {{Indiana Michigan Power (AEP): US data center footprint}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/companies/indiana-michigan-power}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Linked facilities
3
States
1
Reported power online (floor)
1.09 GW
EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.100%
Reported planned capacity (floor)
3.24 GW
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.68%EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.32%
This company's facilities:Download CSVJSONAPI docs

Floors, not totals: power sums only facilities with a reported or estimated figure (2 of 3), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.

Loading map…

US footprint by state

Relationship graph

Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.

Supplies power to

  • Amazon Web Services2 sites · Likely
    Anthropic-Amazon New Carlisle, Amazon AWS Data Center
  • Google1 site · Unverified
    Google Fort Wayne
FacilityRoleLocationStatusPower
Anthropic-Amazon New CarlisleUtility LikelyNew Carlisle, INOperating1.09 GW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Google Fort WayneUtility UnverifiedFort Wayne, INUnder construction1.04 GW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Amazon AWS Data CenterUtility LikelyINOperating—