Microsoft
What changedHyperscaler · datacenters.microsoft.com · also matched as Microsoft Azure, Microsoft Corporation
Microsoft is linked to 84 tracked US data centers in 13 states as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 2.03 GW online and 3.21 GW in the pipeline (floors: 10 of 84 report power). Every relationship cites its source.
Follow
Get changes to Microsoft
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Microsoft: US data center footprint.” /companies/microsoft. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_microsoft_2026,
title = {{Microsoft: US data center footprint}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/companies/microsoft}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
Floors, not totals: power sums only facilities with a reported or estimated figure (10 of 84), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.
US footprint by state
- Iowa22 sites · 228 MW
- Texas17 sites · 172 MW
- Virginia12 sites
- Washington11 sites
- Arizona6 sites · 263 MW
- Georgia5 sites · 859 MW
- Wyoming3 sites
- California2 sites
- Illinois2 sites
- Indiana1 sites
- Wisconsin1 sites · 442 MW
- New Jersey1 sites · 70 MW
- Puerto Rico1 sites
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
Powered by
- MidAmerican Energy22 sites · LikelyMicrosoft Project Osmium, Microsoft, Microsoft
- Grant County PUD8 sites · LikelyMicrosoft, Microsoft, Microsoft
- Dominion Energy7 sites · LikelyMicrosoft Leesburg Building 1, Microsoft, Microsoft Leesburg Building 2
- Salt River Project6 sites · UnverifiedMicrosoft Goodyear, PHX-10, PHX-11
- Medina Electric Coop, INC6 sites · UnverifiedMicrosoft SAT40, Microsoft TRP3 (SAT46), Microsoft
- Georgia Power5 sites · ConfirmedMicrosoft Fairwater Atlanta, Douglasville, Douglasville
- CPS Energy (City of San Antonio)5 sites · UnverifiedMicrosoft SAT14, Microsoft, Microsoft San Antonio
- Pedernales Electric Coop, INC5 sites · UnverifiedMicrosoft Texas Research Park Campus, Microsoft TRP2, Microsoft TRP1
Occupies property owned by
- Amazon Web Services1 site · LikelyMicrosoft
- Gcdc Purchaser Phase 2 LLC1 site · LikelyMicrosoft Data Center 2
- Gcdc Purchaser Phase 1 LLC1 site · LikelyMicrosoft Data Center 1
Serves workloads of
- OpenAI3 sites · LikelyMicrosoft Fairwater Atlanta, Microsoft Fairwater Wisconsin, Microsoft Goodyear
Workloads served by
- Nebius1 site · LikelyMicrosoft-Nebius New Jersey
Backed by
- NVIDIA1 site · ConfirmedCrusoe Abilene Expansion
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| Crusoe Abilene Expansion | Owner, End user | Abilene, TX | Under construction | 941 MW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Microsoft Fairwater Atlanta | Owner, End user | Fayetteville, GA | Operating | 859 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Microsoft LaPorte | Operator | LaPorte, IN | Unknown | 538 MW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| Microsoft Fairwater Wisconsin | Owner, End user | Mount Pleasant, WI | Operating + expanding | 442 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Microsoft Goodyear | Owner, End user, Property owner of record | Goodyear, AZ | Operating | 263 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Microsoft Project Osmium | Owner | Cumming, IA | Operating | 228 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Microsoft SAT40 | Owner | San Antonio, TX | Operating | 106 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Microsoft San Jose | Operator | San Jose, CA | Unknown | 77 MW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| Microsoft-Nebius New Jersey | End user Likely | NJ | Operating | 70 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Microsoft SAT14 | Owner | San Antonio, TX | Operating | 66 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Arcola Tech Park | Property owner of record | VA | Operating | — |
| CYS41 Datacenter | Operator Likely | WY | Operating | — |
| CYS42 Datacenter | Operator Likely | WY | Operating | — |
| Douglasville | Operator Likely | Lithia Springs, GA | Operating | — |
| Douglasville | Operator Likely | Lithia Springs, GA | Operating | — |
| Microsoft | Operator Likely | Guaynabo, PR | Operating | — |
| Microsoft | Operator Likely | Santa Clara, CA | Operating | — |
| Microsoft | Operator Likely | San Antonio, TX | Operating | — |
| Microsoft | Operator Likely | San Antonio, TX | Operating | — |
| Microsoft | Operator Likely | WA | Operating | — |
| Microsoft | Operator Likely | WA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | WA | Operating | — |
| Microsoft | Operator Likely | WA | Operating | — |
| Microsoft | Operator Likely | WA | Operating | — |
| Microsoft | Operator Likely | WA | Operating | — |
| Microsoft | Operator Likely | WA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | Aldie, VA | Under construction | — |
| Microsoft | Operator Likely | TX | Operating | — |
| Microsoft | Operator Likely | TX | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | IA | Operating | — |
| Microsoft | Operator Likely | WA | Operating | — |
| Microsoft | Operator Likely | TX | Operating | — |
| Microsoft | Operator Likely | TX | Operating | — |
| Microsoft | Operator Likely | Atlanta, GA | Operating | — |
| Microsoft | Operator Likely | GA | Operating | — |
| Microsoft - Azure Datacenter | Operator Likely | Northlake, IL | Operating | — |
| Microsoft Cheyenne (expansion) | Operator | Cheyenne, WY | Unknown | — |
| Microsoft CHI11 | Operator Likely | Elk Grove Village, IL | Operating | — |
| Microsoft Data Center 1 | Operator Likely | Gainesville, VA | Operating | — |
| Microsoft Data Center 2 | Operator Likely | Gainesville, VA | Operating | — |
| Microsoft EAT02 | Operator Likely | WA | Operating | — |
| Microsoft EAT03 | Operator Likely | East Wenatchee, WA | Operating | — |
| Microsoft EAT04 | Operator Likely | WA | Under construction | — |
| Microsoft IAD11 | Operator, Property owner of record Likely | Aldie, VA | Operating | — |
| Microsoft IAD11 | Operator, Property owner of record Likely | Aldie, VA | Operating | — |
| Microsoft IAD11 | Operator, Property owner of record Likely | Aldie, VA | Operating | — |
| Microsoft Leesburg Building 1 | Operator, Property owner of record Likely | Leesburg, VA | Under construction | — |
| Microsoft Leesburg Building 2 | Operator, Property owner of record Likely | Leesburg, VA | Under construction | — |
| Microsoft Leesburg Building 3 | Property owner of record | Leesburg, VA | Under construction | — |
| Microsoft Leesburg Building 4 | Property owner of record | Leesburg, VA | Under construction | — |
| Microsoft Leesburg Building 5 | Property owner of record | Leesburg, VA | Under construction | — |
| Microsoft San Antonio | Operator Likely | San Antonio, TX | Operating | — |
| Microsoft SAT 80 | Operator Likely | San Antonio, TX | Operating | — |
| Microsoft SAT 81 | Operator Likely | San Antonio, TX | Operating | — |
| Microsoft SAT 82 | Operator Likely | San Antonio, TX | Operating | — |
| Microsoft Texas Research Park Campus | Operator Likely | TX | Operating | — |
| Microsoft TRP1 | Operator Likely | TX | Operating | — |
| Microsoft TRP2 | Operator Likely | TX | Operating | — |
| Microsoft TRP3 (SAT46) | Operator Likely | TX | Operating | — |
| PHX-10 | Operator, Property owner of record Likely | Goodyear, AZ | Operating | — |
| PHX-11 | Operator, Property owner of record Likely | Goodyear, AZ | Operating | — |
| PHX-12 | Operator, Property owner of record Likely | Goodyear, AZ | Operating | — |
| PHX-13 | Operator, Property owner of record Likely | Goodyear, AZ | Operating | — |
| PHX-14 | Operator, Property owner of record Likely | Goodyear, AZ | Operating | — |