DC
/

DTE Electric

What changed

Utility / energy · also matched as DTE Electric Company, DTE Energy, Dte Electric Company, DTE Electric Co.

DTE Electric is linked to 7 tracked US data centers in 1 state as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 0 MW online and 1.4 GW in the pipeline (floors: 1 of 7 report power). Every relationship cites its source.

View on map →
Follow

Get changes to DTE Electric

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “DTE Electric: US data center footprint.” /companies/dte. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_dte_2026,
  title = {{DTE Electric: US data center footprint}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/companies/dte}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Linked facilities
7
States
1
Reported power online (floor)
—
Reported planned capacity (floor)
1.4 GW
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.100%
This company's facilities:Download CSVJSONAPI docs

Floors, not totals: power sums only facilities with a reported or estimated figure (1 of 7), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.

Loading map…

US footprint by state

Relationship graph

Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.

Supplies power to

  • Oracle1 site · Confirmed
    OpenAI Stargate Michigan
  • Dennis Sampier1 site · Likely
    Chick-fil-A Hiring Center
  • Verizon1 site · Unverified
    Verizon DTRT.PP2
  • EdgeConneX1 site · Likely
    EdgeConneX Detroit DET01
  • US Signal1 site · Unverified
    US Signal data center
  • Comcast1 site · Unverified
    Comcast
  • Quicken Loans1 site · Unverified
    Quicken Loans data center — 1401 Rosa Parks Boulevard
FacilityRoleLocationStatusPower
OpenAI Stargate MichiganUtility MIUnder construction1.4 GW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
Chick-fil-A Hiring CenterUtility LikelyMIOperating—
ComcastUtility UnverifiedSouthgate, MIOperating—
EdgeConneX Detroit DET01Utility LikelySouthfield, MIOperating—
Quicken Loans data center — 1401 Rosa Parks BoulevardUtility UnverifiedDetroit, MIOperating—
US Signal data centerUtility UnverifiedMIOperating—
Verizon DTRT.PP2Utility UnverifiedDetroit, MIOperating—