Utility / energy · also matched as WE Energies, Wisconsin Electric Power Co

We Energies is linked to 7 tracked US data centers in 1 state as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 442 MW online and 3.57 GW in the pipeline (floors: 3 of 7 report power). Every relationship cites its source.

View on map →
Follow

Get changes to We Energies

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “We Energies: US data center footprint.” /companies/we-energies. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_we_energies_2026,
  title = {{We Energies: US data center footprint}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/companies/we-energies}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Linked facilities
7
States
1
Reported power online (floor)
442 MW
EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.100%
Reported planned capacity (floor)
4.02 GW
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.32%AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.0%EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.68%
This company's facilities:Download CSVJSONAPI docs

Floors, not totals: power sums only facilities with a reported or estimated figure (3 of 7), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.

Loading map…

US footprint by state

Relationship graph

Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.

Supplies power to

FacilityRoleLocationStatusPower
OpenAI Stargate WisconsinUtility WIUnder construction1.3 GW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
Microsoft Fairwater WisconsinUtility Mount Pleasant, WIOperating + expanding442 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Expedient MilwaukeeUtility LikelyFranklin, WIOperating2 MW planned AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.
Data Holdings Data CenterUtility LikelyMilwaukee, WIOperating—
Involta data centerUtility UnverifiedWIOperating—
Pewaukee Data CenterOperator, Utility LikelyWaukesha, WIOperating—
TierPoint MilwaukeeUtility LikelyMilwaukee, WIOperating—