SoftBank
What changedInvestor · also matched as Softbank, SoftBank Group
SoftBank is linked to 3 tracked US data centers in 2 states as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 590 MW online and 2.09 GW in the pipeline (floors: 3 of 3 report power). Every relationship cites its source.
Follow
Get changes to SoftBank
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “SoftBank: US data center footprint.” /companies/softbank. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_softbank_2026,
title = {{SoftBank: US data center footprint}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/companies/softbank}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
Floors, not totals: power sums only facilities with a reported or estimated figure (3 of 3), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
Invests in
Powered by
- Ohio Edison1 site · LikelyOpenAI Stargate Lordstown
- Bluebonnet Electric Coop, INC1 site · UnverifiedOpenAI Stargate Milam
Serves workloads of
- OpenAI2 sites · ConfirmedOpenAI Stargate Lordstown, OpenAI Stargate Milam
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| OpenAI Stargate Milam | Owner | TX | Under construction | 1.2 GW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| OpenAI Stargate Abilene | Investor | Abilene, TX | Operating + expanding | 590 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| OpenAI Stargate Lordstown | Owner | Warren, OH | Under construction | 300 MW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |