Taylor Electric Coop INC - (Tx)
What changedUtility / energy
Taylor Electric Coop INC - (Tx) is linked to 3 tracked US data centers in 1 state as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 0 MW online and 3.2 GW in the pipeline (floors: 3 of 3 report power). Every relationship cites its source.
This company record was created automatically from a source’s name string and hasn’t been reviewed or de-duplicated yet.
Follow
Get changes to Taylor Electric Coop INC - (Tx)
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Taylor Electric Coop INC - (Tx): US data center footprint.” /companies/taylor-electric-coop-inc-tx. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_taylor_electric_coop_inc_tx_2026,
title = {{Taylor Electric Coop INC - (Tx): US data center footprint}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/companies/taylor-electric-coop-inc-tx}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
Floors, not totals: power sums only facilities with a reported or estimated figure (3 of 3), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.
US footprint by state
- Texas3 sites
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
Supplies power to
- Cipher Mining1 site · UnverifiedAnthropic Barber Lake
- Microsoft1 site · UnverifiedCrusoe Abilene Expansion
- Oracle1 site · UnverifiedOpenAI Stargate Shackelford
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| OpenAI Stargate Shackelford | Utility Unverified | Abilene, TX | Under construction | 1.96 GW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Crusoe Abilene Expansion | Utility Unverified | Abilene, TX | Under construction | 941 MW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Anthropic Barber Lake | Utility Unverified | TX | Under construction | 300 MW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |