DC
/

Oracle

What changed

Hyperscaler · oracle.com/cloud · also matched as Oracle Cloud Infrastructure, OCI

Oracle is linked to 5 tracked US data centers in 4 states as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 590 MW online and 7.7 GW in the pipeline (floors: 5 of 5 report power). Every relationship cites its source.

View on map →
Follow

Get changes to Oracle

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Oracle: US data center footprint.” /companies/oracle. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_oracle_2026,
  title = {{Oracle: US data center footprint}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/companies/oracle}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Linked facilities
5
States
4
Reported power online (floor)
590 MW
EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.100%
Reported planned capacity (floor)
8.29 GW
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.33%EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.67%
This company's facilities:Download CSVJSONAPI docs

Floors, not totals: power sums only facilities with a reported or estimated figure (5 of 5), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.

Loading map…

US footprint by state

Relationship graph

Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.

Powered by

Developed by

Backed by

  • OpenAI3 sites · Confirmed
    OpenAI Stargate Abilene, OpenAI Stargate Shackelford, OpenAI Stargate Wisconsin
  • SoftBank1 site · Confirmed
    OpenAI Stargate Abilene

Invests in

Serves workloads of

  • OpenAI5 sites · Confirmed
    OpenAI Stargate Abilene, OpenAI Stargate Michigan, OpenAI Stargate New Mexico

Built by

  • Mortenson1 site · Confirmed
    OpenAI Stargate Abilene
FacilityRoleLocationStatusPower
OpenAI Stargate New MexicoOwner NMUnder construction2.45 GW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
OpenAI Stargate ShackelfordOwner, Investor Abilene, TXUnder construction1.96 GW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
OpenAI Stargate MichiganOwner MIUnder construction1.4 GW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
OpenAI Stargate WisconsinOwner WIUnder construction1.3 GW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
OpenAI Stargate AbileneOwner, Investor, Tenant Abilene, TXOperating + expanding590 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.