Meta Prometheus
Also known as Prometheus
Meta Prometheus is an operating + expanding ai campus in New Albany, Ohio. Operated or owned by Meta; used by Meta. Current power: 612 MW (estimated). Planned capacity: 1.33 GW (estimated). Verification: verified operating. 13 cited sources.
Follow
Get changes to Meta Prometheus
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Meta Prometheus.” /facilities/meta-prometheus-new-albany-oh. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_meta_prometheus_new_albany_oh_2026,
title = {{Meta Prometheus}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/meta-prometheus-new-albany-oh}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
- ⚠ No public interconnection record for this load — PJM does not publish large-load requests.
- ⚠ No permit record linked to this site yet.
How the time-to-power window was estimated
- From “Under construction”, large loads have typically taken 0.5–2 more years to first power (editorial range; see Methodology).
- The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Project verification
- Announcedimplied by a later stage
- Land acquiredDec 29, 2022
Government record
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- EnergizationOct 14, 2025
Satellite imagery
- Oct 14, 2025 · Building 1 is operational, based on there being minimal construction work and cars in the main carpark. Building 2 still has some construction work around the building. Building 18[1]
- Jan 18, 2026 · Buildings 2-6 are operational, based on all equipment being in place, the paved ground, and minimal construction equipment by the buildings. Buildings 7-11 all have some kind of po[1]
- Aug 31, 2026 · Buildings 7-10 (tents) are operational, based on infrared drone video from RAAD (raad.com) captured on this date. The video suggests that 138.8 MW of nameplate turbine capacity is [1]
- OperationalOct 14, 2025
Satellite imagery · Government record
- Oct 14, 2025 · Building 1 is operational, based on there being minimal construction work and cars in the main carpark. Building 2 still has some construction work around the building. Building 18[1]
- Jan 18, 2026 · Buildings 2-6 are operational, based on all equipment being in place, the paved ground, and minimal construction equipment by the buildings. Buildings 7-11 all have some kind of po[1]
- Aug 31, 2026 · Buildings 7-10 (tents) are operational, based on infrared drone video from RAAD (raad.com) captured on this date. The video suggests that 138.8 MW of nameplate turbine capacity is [1]
- Oct 12, 2026 · County land use: 350: Industrial Warehouses[3]
- Oct 12, 2026 · County land use: 399: Other Industrial Structures[3]
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Model estimate, Satellite imagery.
Grid path
- →facilityMeta Prometheus
- →substationOn-site substation[1]Satellite imageryLikely6 substation outlines traced inside the campus on satellite imagery
- →transmissionJug Street - Kirk 345kV transmission line[7]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.52 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
- Nuclear (contracted)[2]“agreements with three nuclear power providers”NuclearPPA / contractAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.Confirmed
- 3 on-site power generator outlines traced on satellite imagery[1]Epoch AI satellite annotations (fuel type and capacity not identified)Unknown typeBehind-the-meterEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likely
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits2
- Nuclear (contracted)[2]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.Nuclear · PPA / contract
- 3 on-site power generator outlines traced on satellite imagery[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Unknown type · Behind-the-meter
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates1
- AEP Ohio data center tariff[14]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 9, 2025.Jul 9, 2025American Electric Power · Public Utilities Commission of Ohio · Docket 24-508-EL-ATA · Order issued; moratorium on new data center connections to be lifted
“AEP Ohio is ordered to file updated tariffs and lift its moratorium on connecting new data centers as soon as possible.”
Applies in AEP Ohio's territory (AEP operating company in Ohio).
Location & imagery
Mapped outline- Coordinates
- 40.08384, -82.74401
- Address
- 1 Community Cir, New Albany, OH 43054[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 31, 2026.Likely
- County
- Licking County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Property owner of record
- Utility
- Energy partner
“The arrangements with Vistra, TerraPower and Oklo ... are for Meta's Prometheus supercluster”
“The arrangements with Vistra, TerraPower and Oklo ... are for Meta's Prometheus supercluster”
“The arrangements with Vistra, TerraPower and Oklo ... are for Meta's Prometheus supercluster”
Power (all fields)
- Current facility power
- 612 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 31, 2026.Likelyestimated
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
- 471 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 31, 2026.Likelyestimated
Estimated IT load currently online, based on buildings observed operational.
- Planned capacity
- 1.33 GW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 31, 2026.Likelyestimated
Projected facility power at the last tracked milestone (2028-07-01); not necessarily full build-out.
- Estimated annual consumption
- 3,753 GWh/yr[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated
612 MW × 8,760 h × 70% utilization.
- Power sources
- Nuclear (contracted)[2]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Jan 9, 2026.Confirmed
“agreements with three nuclear power providers”
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- PJM[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- PJM[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Babbitt Substation (138 kV)[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 1 km[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 345 kV[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 10.95¢/kWh[9]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Ohio statewide average, July 2026.
- State avg. commercial price
- 14.06¢/kWh[9]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Ohio statewide average, July 2026.
- Generation within 50 km
- 21 MW[10]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
8 EIA-reported plants within 50 km.
- Generation queued in county
- 2.52 GW[8]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
14 active generation interconnection requests in Licking County: Solar 1,773 MW, Storage 750 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Jug Street - Kirk 345kV transmission line · American Electric Power | Transmission line | 0.52 km | 345 kV | [7] |
| 138 kV line | Transmission line | 0.6 km | 138 kV | [7] |
| 345 kV line · American Electric Power | Transmission line | 1.38 km | 345 kV | [7] |
| Jug Street - Corridor 345kV transmission line · American Electric Power | Transmission line | 1.44 km | 345 kV | [7] |
| Conesville - Corridor 345kV transmission line · American Electric Power | Transmission line | 1.89 km | 345 kV | [7] |
| Denison Solar Array · AEP Onsite Partners, LLC | Power plant (Solar) | 19.3 km | 2 MW | [10] |
| Dodge Park Engine No 1 · City of Columbus - (OH) | Power plant (Petroleum) | 27.3 km | 2 MW | [10] |
| St-1/1a Engine No 1 · City of Columbus - (OH) | Power plant (Petroleum) | 27.5 km | 1 MW | [10] |
| 3100 Valleyview Drive · Madison Energy Investments LLC | Power plant (Solar) | 28.1 km | 1 MW | [10] |
| Renick Run Pumping Station 03-04 · City of Columbus - (OH) | Power plant (Petroleum) | 28.6 km | 2 MW | [10] |
| Ps St-8 Engine No 1 · City of Columbus - (OH) | Power plant (Petroleum) | 29.3 km | 2 MW | [10] |
| O'Shaughnessy Hydro · City of Columbus - (OH) | Power plant (Hydroelectric) | 33.4 km | 5 MW | [10] |
| Suburban Landfill Gas Recovery · WM Renewable Energy LLC | Power plant (Biomass) | 46.6 km | 6 MW | [10] |
| Babbitt Substation · American Electric Power | Substation | 1.04 km | 138 kV | [7] |
| Babbitt Substation · American Electric Power | Substation | 1.12 km | 345 kV | [7] |
| Jug Street Substation · AEP Ohio | Substation | 1.36 km | 345 kV | [7] |
| Smith's Mill Substation · Energy Cooperative | Substation | 1.42 km | 138 kV | [7] |
| Unnamed substation | Substation | 1.81 km | 138 kV | [7] |
| Badger Substation · American Electric Power | Substation | 1.84 km | 138 kV | [7] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Centerburg 138 kVPJM AI2-088 | Solar | In study · proposed 2025-12 | 413 MW | [8] |
| Centerburg 138 kVPJM AG1-034 | Solar | In study · proposed 2023-10 | 363 MW | [8] |
| Centerburg 138 kVPJM AH1-036 | Storage | In study · proposed 2024-07 | 278 MW | [8] |
| Centerburg 138 kVPJM AG1-024 | Solar | In study · proposed 2023-10 | 235 MW | [8] |
| Flint GridPJM AF1-062 | Storage | IA signed · proposed 2026-11 | 200 MW | [8] |
| Jug Street 138 kVPJM AI2-226 | Storage | In study · proposed 2022-08 | 200 MW | [8] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquiredDec 29, 2022[3]
- Permitting—
- Construction startApr 14, 2022[1]
- First operationalOct 14, 2025[1]
- Expected completionJul 1, 2028[1]Projected
- Planned capacity
- 1.33 GW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 31, 2026.Likelyestimated
Projected facility power at the last tracked milestone (2028-07-01); not necessarily full build-out.
- Buildings (planned)
- 27[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 31, 2026.Likelyderived
Count of building outlines traced on satellite imagery.
- Buildings operational
- 10[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 31, 2026.Likelyestimated
| Phase | Status | Added MW | Completed / expected | Source |
|---|---|---|---|---|
| Building 1 | operational | 99 MW | Oct 14, 2025 | [1] |
| Buildings 2–6 | operational | 379 MW | Jan 18, 2026 | [1] |
| Buildings 7–10 | operational | 134 MW | Aug 31, 2026 | [1] |
| Buildings 11–18 | under construction | 266 MW | Nov 30, 2026 (projected) | [1] |
| Building 19 | under construction | 84 MW | Jan 15, 2027 (projected) | [1] |
| Building 20 | under construction | 83 MW | Apr 15, 2027 (projected) | [1] |
| Building 21 | under construction | 83 MW | Jul 14, 2027 (projected) | [1] |
| Buildings 22–27 | under construction | 200 MW | Jul 1, 2028 (projected) | [1] |
Real estate
- $38.9M[3]Market value · tax year current (2026) · parcel 093-107268-00.000
- $17.6M[3]Market value — land · tax year current (2026) · parcel 093-107268-00.000
- $21.3M[3]Market value — improvements · tax year current (2026) · parcel 093-107268-00.000
- $30.1M[3]Market value · tax year current (2026) · parcel 095-112218-00.000
- $29.5M[3]Market value — land · tax year current (2026) · parcel 095-112218-00.000
- $593,100[3]Market value — improvements · tax year current (2026) · parcel 095-112218-00.000
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 093-107268-00.000 Licking County, OH | DISTRIBUTION LAND CORP 3 LIMITED PKWY , COLUMBUS, OH | 142.43 | 350: Industrial Warehouses | — | [3] |
| 095-112218-00.000 Licking County, OH | SIDECAT LLC 1 META WAY , MENLO PARK, CA | 414.01 | 399: Other Industrial Structures | — | [3] |
- Site area
- 556.4 acres[3]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Sum of county land area across parcels.
- Land use
- 350: Industrial Warehouses[3]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Capital cost / investment
- $17.8B[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 31, 2026.Likelyestimated
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
- Amazon Web Services CMH50 · 1.4 km · parcel 095-111744-00.000$12.8M · Jul 23, 2015 [3]
- NAO 1/NAO 2 · 1.8 km · parcel 094-107100-00.001$36.4M · Aug 10, 2017 [3]
- LCO 1 · 2.4 km · parcel 094-106782-00.000$34.3M · May 23, 2019 [3]
Size
- Building footprint
- 95,300 sq ft[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Sum of 1 building outlines mapped in OpenStreetMap within this campus.
- Parcel / land records
- 093-107268-00.000 (Licking County),095-112218-00.000 (Licking County)[3]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Floor area
- Not yet sourced
Compute
- Project
- Prometheus[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 31, 2026.Confirmed
- Chip types
- B300[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 31, 2026.Confirmed
- Compute (H100-equivalents)
- 536,300[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 31, 2026.Likelyestimated
What changed (last 3 years)
Follow this facility (RSS)- Current IT capacity76 MWOct 14, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→368 MWJan 18, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→496 MWMay 18, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→368 MWMay 18, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→496 MWAug 31, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→471 MWAug 31, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Current facility power99 MWOct 14, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→478 MWJan 18, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→645 MWMay 18, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→478 MWMay 18, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→645 MWAug 31, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→612 MWAug 31, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Compute (H100-equivalents)599,800Aug 31, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→536,300Aug 31, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Capital cost / investment$18.8BAug 31, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→$17.8BAug 31, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Buildings operational0Apr 14, 2022[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→1Oct 14, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→6Jan 18, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→11May 18, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→6May 18, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→11Aug 31, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→10Aug 31, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- StatusUnder constructionApr 14, 2022[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→Operating + expandingOct 14, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Timeline
- Apr 14, 2022[1]
Land clearing begins for Building 1-2
- Jun 1, 2025[1]
Roof complete on Building 5 (QTS-owned). In the northernmost area, land clearing begins on a new Meta site for Buildings 16-20. Building 1 still has construction work around the building and cooling equipment, so it's unlikely to be operational.
- Sep 20, 2025[1]
Building 4 operational. Based on our default estimate of roof-to-operational time.
Building 1 is operational, based on there being minimal construction work and cars in the main carpark. Building 2 still has some construction work around the building. Building 18 roof is complete. The on-site power at Socrates South and Socrates North has some outlines of gas turbines, to be installed later.
Buildings 2-6 are operational, based on all equipment being in place, the paved ground, and minimal construction equipment by the buildings. Buildings 7-11 all have some kind of power or cooling equipment lining their right side which are not fully installed. Building 14 has chillers installed. Buildings 16-20 roofs are complete. The Socrates South power plant to the right of Buildings 7-11 has 7 gas turbines in place, judging by the exhaust stacks.
The Socrates South power plant to the right of Buildings 7-12 now has 10 natural gas turbines in place, judging by the number of exhaust stacks. Battery backup has been installed nearby. To the north, a new section of tent buildings has begun east of Buildings 16-20.
Building 7-11 (Meta tents) look structurally complete but not operational, given there is still construction activity, including at the adjacent Socrates South power plant. Northern tents (Buildings 16-27) are all roofed except for 21 and 27.
Buildings 7-10 (tents) are operational, based on infrared drone video from RAAD (raad.com) captured on this date. The video suggests that 138.8 MW of nameplate turbine capacity is operating at the Socrates South power plant (about 69% of the 200 MW nameplate capacity), and Buildings 7-10 roof vents are bright on infrared while Buildings 11-12 vents are not. That's 4/6 buildings operating, implying about 67% of capacity, which is consistent with 69% of the power plant operating. In the north, Buildings 16-27 (tents) look to be in a completed state. Each northern set of 6 tents still awaits to be connected to one of the corresponding power plants to become operational. Drone video from August 19th shows no turbines operating at Socrates North, though there are 3 small diesel generators operating. Building 13 (Vantage) is still under construction, we estimate another 3 months before operability.
Socrates South and Socrates North gas power plants are fully operational, enabling the operability of Buildings 11-12 and 16-21. This completes the 2 sets of 6 tents associated with Socrates South and Socrates North. This is based on documents stating "late Third or early Fourth Quarter of 2026", "late 2026", "November 2026", "third quarter of 2026". The timeline also lines up with RAAD drone imagery from 09/08/26 seeing operating turbines at Socrates South and a full set of turbines installed but not yet operating at Socrates North.
Building 13 (Vantage) is operational, based on the pace of construction seen in earlier images.
Building 14 (Vantage) is operational, based on it starting construction about 3 months after Building 13.
Building 15 (Vantage) operational, based on it starting construction about 3 months after Building 14.
Buildings 22-27 (3rd set of 6 Meta tents) are operational. This is a conservative estimate to align with the operability of the Socrates the Younger power plant. The power plant is operational by Q3 of 2028 based on the project schedule. It is announced to produce a maximum of 250MW.
- Dec 29, 2022[3]
Deed/transfer recorded for parcel 093-107268-00.000 (no sale price disclosed).
- May 28, 2026[3]
Deed/transfer recorded for parcel 095-112218-00.000 (no sale price disclosed).
Buildings on this campus
5- NAO 1/NAO 2Operating · 664,000 sq ft footprint
- NAO 3Operating · 366,300 sq ft footprint
- NAO 5/NAO 6Operating · 609,500 sq ft footprint
- LCO 1Operating · 366,000 sq ft footprint
- LCO 2Operating · 304,500 sq ft footprint
All claims (provenance audit)
67| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Meta Prometheus | [1] | Likely | 2026-08-31 | Shown |
| Also known as | Prometheus | [2] | Confirmed | 2026-01-09 | Shown |
| Status | Under construction | [1] derived | Likely | 2022-04-14 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2025-06-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2025-09-20 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2025-10-14 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2026-01-18 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2026-03-12 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2026-05-18 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2026-08-31 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-08-31 | Shown |
| Project | Prometheus | [1] | Confirmed | 2026-08-31 | Shown |
| Address | 1 Community Cir, New Albany, OH 43054 | [1] | Likely | 2026-08-31 | Shown |
| Property owner of record | Distribution Land CorpParcel 093-107268-00.000: DISTRIBUTION LAND CORP | [3] | Confirmed | 2026-10-12 | Shown |
| Property owner of record | Sidecat LLCParcel 095-112218-00.000: SIDECAT LLC | [3] | Confirmed | 2026-10-12 | Shown |
| Owner | MetaOwner: Meta | [1] | Confirmed | 2026-08-31 | Shown |
| End users | MetaUsers: Meta | [1] | Confirmed | 2026-08-31 | Shown |
| Utility | American Electric PowerEnergy companies: American Electric Power | [1] | Confirmed | 2026-08-31 | Shown |
| Energy partners | WilliamsEnergy companies: Williams | [1] | Confirmed | 2026-08-31 | Shown |
| Energy partners | Vistra | [2] | Confirmed | 2026-01-09 | Shown |
| Energy partners | TerraPower | [2] | Confirmed | 2026-01-09 | Shown |
| Energy partners | Oklo | [2] | Confirmed | 2026-01-09 | Shown |
| Current facility power | 612 MW | [1] estimated | Likely | 2026-08-31 | Shown |
| Current facility power | 99 MW | [1] estimated | Likely | 2025-10-14 | Superseded / alternative |
| Current facility power | 478 MW | [1] estimated | Likely | 2026-01-18 | Superseded / alternative |
| Current facility power | 478 MW | [1] estimated | Likely | 2026-03-12 | Superseded / alternative |
| Current facility power | 478 MW | [1] estimated | Likely | 2026-05-18 | Superseded / alternative |
| Current IT capacity | 471 MW | [1] estimated | Likely | 2026-08-31 | Shown |
| Current IT capacity | 76 MW | [1] estimated | Likely | 2025-10-14 | Superseded / alternative |
| Current IT capacity | 368 MW | [1] estimated | Likely | 2026-01-18 | Superseded / alternative |
| Current IT capacity | 368 MW | [1] estimated | Likely | 2026-03-12 | Superseded / alternative |
| Current IT capacity | 368 MW | [1] estimated | Likely | 2026-05-18 | Superseded / alternative |
| Planned capacity | 1.33 GW | [1] estimated | Likely | 2026-08-31 | Shown |
| Power sources | Nuclear (contracted) | [2] | Confirmed | 2026-01-09 | Shown |
| Estimated annual consumption | 3,753 GWh/yr | [4] estimated | Speculative | 2026-10-12 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [5] derived | Likely | — | Shown |
| Balancing authority | PJM | [6] derived | Likely | — | Shown |
| Nearest mapped substation | Babbitt Substation (138 kV)way/708899014 | [7] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1 km | [7] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [7] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 2.52 GW | [8] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 10.95¢/kWh | [9] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 14.06¢/kWh | [9] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 21 MW | [10] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 27 | [1] derived | Likely | 2026-08-31 | Shown |
| Buildings operational | 10 | [1] estimated | Likely | 2026-08-31 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2022-04-14 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2025-06-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2025-09-20 | Superseded / alternative |
| Buildings operational | 1 | [1] estimated | Likely | 2025-10-14 | Superseded / alternative |
| Buildings operational | 6 | [1] estimated | Likely | 2026-01-18 | Superseded / alternative |
| Buildings operational | 6 | [1] estimated | Likely | 2026-03-12 | Superseded / alternative |
| Buildings operational | 6 | [1] estimated | Likely | 2026-05-18 | Superseded / alternative |
| Building footprint | 95,300 sq ftway/1375443893 | [7] derived | Likely | 2026-10-12 | Shown |
| Site area | 556.4 acres | [3] | Confirmed | 2026-10-12 | Shown |
| Capital cost / investment | $17.8B | [1] estimated | Likely | 2026-08-31 | Shown |
| Parcel / land records | 093-107268-00.000 (Licking County) | [3] | Confirmed | 2026-10-12 | Shown |
| Parcel / land records | 095-112218-00.000 (Licking County) | [3] | Confirmed | 2026-10-12 | Shown |
| Assessed value (official) | $69M | [3] | Confirmed | 2026 | Shown |
| Land use | 350: Industrial Warehouses | [3] | Confirmed | 2026-10-12 | Shown |
| Land use | 399: Other Industrial Structures | [3] | Confirmed | 2026-10-12 | Superseded / alternative |
| Compute (H100-equivalents) | 536,300 | [1] estimated | Likely | 2026-08-31 | Shown |
| Chip types | B300 | [1] | Confirmed | 2026-08-31 | Shown |
| Land acquired | Dec 29, 2022 | [3] derived | Confirmed | 2026-10-12 | Shown |
| Construction start | Apr 14, 2022 | [1] derived | Likely | 2026-08-31 | Shown |
| First operational | Oct 14, 2025 | [1] derived | Likely | 2026-08-31 | Shown |
| Expected completion | Jul 1, 2028 | [1] estimated | Speculative | 2026-08-31 | Shown |