Meta
What changedHyperscaler · datacenters.atmeta.com · also matched as Facebook, Meta Platforms
Meta is linked to 77 tracked US data centers in 20 states as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 2.95 GW online and 8.27 GW in the pipeline (floors: 18 of 77 report power). Every relationship cites its source.
Follow
Get changes to Meta
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Meta: US data center footprint.” /companies/meta. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_meta_2026,
title = {{Meta: US data center footprint}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/companies/meta}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
Floors, not totals: power sums only facilities with a reported or estimated figure (18 of 77), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.
US footprint by state
- Oregon8 sites · 243 MW
- Ohio7 sites · 612 MW
- Utah7 sites · 179 MW
- Iowa7 sites
- New Mexico6 sites · 114 MW
- Nebraska6 sites · 105 MW
- Texas5 sites · 231 MW
- Alabama5 sites · 397 MW
- Tennessee5 sites · 114 MW
- North Carolina4 sites
- Georgia4 sites
- Illinois3 sites
- Virginia3 sites
- Louisiana1 sites
- Indiana1 sites · 241 MW
- Minnesota1 sites · 241 MW
- Idaho1 sites · 198 MW
- Wyoming1 sites · 182 MW
- South Carolina1 sites · 90 MW
- Missouri1 sites
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
Powered by
- Bonneville Power Administration7 sites · LikelyMeta, Meta, Meta
- MidAmerican Energy7 sites · LikelyFacebook Altoona Data Center 1, Facebook Altoona Data Center 2, Facebook Altoona Data Center 3
- American Electric Power6 sites · ConfirmedMeta Prometheus, NAO 1/NAO 2, NAO 3
- PacifiCorp6 sites · LikelyMeta Eagle Mountain, Meta, Meta
- Omaha Public Power District6 sites · LikelyMeta Sarpy, Meta Sarpy Data center, Meta Sarpy Data center
- Duke Energy5 sites · UnverifiedMeta Jeffersonville, Meta, Meta
- Cumberland Elec Member Corp5 sites · LikelyMeta Gallatin, Gallatin Data Center, Meta Gallatin Data Center
- Continental Divide El Coop INC5 sites · LikelyMeta, Meta, Meta
Built by
- Mortenson2 sites · ConfirmedMeta Eagle Mountain, Meta Hyperion
- JE Dunn1 site · ConfirmedMeta Temple
- Hensel Phelps1 site · ConfirmedMeta Montgomery
- DPR Construction1 site · LikelyMeta Hyperion
- Turner Construction Company1 site · LikelyMeta Hyperion
- Mortenson Construction1 site · LikelyMeta Hyperion
Occupies property owned by
- Sidecat LLC6 sites · ConfirmedMeta Prometheus, NAO 1/NAO 2, NAO 3
- Distribution Land Corp1 site · ConfirmedMeta Prometheus
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| Meta Hyperion | Owner, End user, Operator | LA | Operating + expanding | 5 GW planned AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. |
| Meta El Paso Data Center | Developer, Operator Likely | El Paso, TX | Under construction | 1 GW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| Meta Prometheus | Owner, End user | New Albany, OH | Operating + expanding | 612 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta Bowling Green | Owner, End user | Bowling Green, OH | Under construction | 570 MW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| QTS Eagle Mountain | Owner, End user Speculative | Eagle Mountain, UT | Under construction | 411 MW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta-QTS Hillsboro 2 | Owner, End user Likely | Hillsboro, OR | Operating | 243 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta Jeffersonville | Owner, End user | Jeffersonville, IN | Operating | 241 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta Rosemount | Owner, End user | Rosemount, MN | Operating | 241 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta Temple | Owner, End user | Temple, TX | Operating | 231 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta Montgomery | Owner, End user | Montgomery, AL | Operating + expanding | 199 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta Huntsville | Owner, End user | AL | Operating | 198 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta Kuna | Owner, End user | ID | Operating | 198 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta Cheyenne | Owner, End user | WY | Operating + expanding | 182 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta Eagle Mountain | Owner, End user | Eagle Mountain, UT | Operating | 179 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta Gallatin | Owner, End user | Gallatin, TN | Operating | 114 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta Los Lunas | Owner, End user | Los Lunas, NM | Operating + expanding | 114 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta Sarpy | Owner, End user | Springfield, NE | Operating | 105 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta Aiken | Owner, End user | Trenton, SC | Operating + expanding | 90 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Facebook Altoona Data Center 1 | Operator Likely | IA | Operating | — |
| Facebook Altoona Data Center 2 | Operator Likely | IA | Operating | — |
| Facebook Altoona Data Center 3 | Operator Likely | IA | Operating | — |
| Facebook Altoona Data Center 4 | Operator Likely | IA | Operating | — |
| Facebook Altoona Data Center 5 | Operator Likely | IA | Operating | — |
| Facebook Fort Worth Datacenter | Operator Likely | TX | Operating | — |
| Facebook Fort Worth Datacenter | Operator Likely | TX | Operating | — |
| Facebook Fort Worth Datacenter | Operator Likely | TX | Operating | — |
| Gallatin Data Center | Operator Likely | TN | Operating | — |
| LCO 1 | Operator Likely | OH | Operating | — |
| LCO 2 | Operator Likely | OH | Operating | — |
| Meta | Operator Likely | OR | Operating | — |
| Meta | Operator Likely | OR | Operating | — |
| Meta | Operator Likely | NC | Operating | — |
| Meta | Operator Likely | NC | Operating | — |
| Meta | Operator Likely | Los Lunas, NM | Operating | — |
| Meta | Operator Likely | OR | Operating | — |
| Meta | Operator Likely | Los Lunas, NM | Operating | — |
| Meta | Operator Likely | OR | Operating | — |
| Meta | Operator Likely | OR | Operating | — |
| Meta | Operator Likely | Los Lunas, NM | Operating | — |
| Meta | Operator Likely | NC | Operating | — |
| Meta | Operator Likely | UT | Operating | — |
| Meta | Operator Likely | UT | Operating | — |
| Meta | Operator Likely | UT | Operating | — |
| Meta | Operator Likely | NC | Operating | — |
| Meta | Operator Likely | OR | Operating | — |
| Meta | Operator Likely | OR | Operating | — |
| Meta | Operator Likely | Los Lunas, NM | Operating | — |
| Meta | Operator Likely | IA | Operating | — |
| Meta | Operator Likely | IA | Operating | — |
| Meta | Operator Likely | UT | Operating | — |
| Meta | Operator Likely | UT | Operating | — |
| Meta | Operator Likely | Los Lunas, NM | Operating | — |
| Meta data center | Operator Likely | GA | Operating | — |
| Meta data center | Operator Likely | GA | Operating | — |
| Meta data center | Operator Likely | GA | Operating | — |
| Meta data center | Operator Likely | IL | Operating | — |
| Meta data center | Operator Likely | IL | Operating | — |
| Meta data center | Operator Likely | IL | Operating | — |
| Meta Data Center | Operator Likely | MO | Operating | — |
| Meta Gallatin Data Center | Operator Likely | TN | Operating | — |
| Meta Gallatin Data Center | Operator Likely | TN | Operating | — |
| Meta Gallatin Data Center | Operator Likely | TN | Operating | — |
| Meta Henrico Data Center | Operator Likely | VA | Operating | — |
| Meta Henrico Data Center | Operator Likely | VA | Operating | — |
| Meta Henrico Data Center | Operator Likely | VA | Operating | — |
| Meta Huntsville Data center | Operator Likely | AL | Operating | — |
| Meta Huntsville Data center | Operator Likely | AL | Operating | — |
| Meta Huntsville Data center | Operator Likely | AL | Operating | — |
| Meta Sarpy Data center | Operator Likely | NE | Operating | — |
| Meta Sarpy Data center | Operator Likely | NE | Operating | — |
| Meta Sarpy Data center | Operator Likely | NE | Operating | — |
| Meta Sarpy Data center | Operator Likely | NE | Operating | — |
| Meta Sarpy Data center | Operator Likely | NE | Operating | — |
| Meta Stanton Springs Data Center | Operator Likely | Social Circle, GA | Operating | — |
| NAO 1/NAO 2 | Operator Likely | OH | Operating | — |
| NAO 3 | Operator Likely | OH | Operating | — |
| NAO 5/NAO 6 | Operator Likely | OH | Operating | — |