Michigan
Datacenter Source tracks 13 data centers in Michigan, including 1 AI campuses. Facilities that disclose power add up to 0 MW online and 1.4 GW in the pipeline. These are floors, not market size: 8% of facilities have a power figure. Largest operators by tracked MW: Oracle, Related Digital and Dennis Sampier. 1.4 GW has been announced; 0 MW is documented as operational.
Follow
Get changes to Michigan
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Michigan data centers.” /states/MI. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_state_MI_2026,
title = {{Michigan data centers}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/states/MI}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Percentages under each total show how much of it is backed by each evidence level. Average industrial electricity price: 9.81¢/kWh (EIA).
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedAI data center capacity over time
Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly
Construction pipeline by expected completion
MW from phases with a projected completion date
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
How to read this
Each bar sums one kind of evidence across facilities. Announced is the largest MW a company, utility, government or press source reported. Interconnection requests are MW in active large-load queue requests. Of the grid operators we ingest, only NYISO publishes these project by project. Contracted / approved means an executed interconnection agreement or a reported utility or power contract. Under construction and Operational come from construction records, imagery or operator reports.
The gap between announced and documented MW is capacity that has been claimed but not yet backed by a grid, construction or operating record. It is not proof a project won't happen. On-site generation is listed separately and never added to grid capacity. Method
Time to power puts each site's pending MW (announced minus operational) into a bucket by the midpoint of its evidence-based window. The window starts at the furthest documented stage and adds editorial ranges for what remains (e.g. announced: 2–5 yrs; land acquired: 2–4.5 yrs; planning / zoning: 1.75–4 yrs). Insufficient evidence means no dated stage evidence, not a delay. Windows are ranges, not forecasts. All ranges and rules
- Announced1.4 GW
- Interconnection requests—
- Contracted / approved1.38 GW
- Under construction1.38 GW
- Operational—
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Interconnection queues
Active requests to connect to the grid (MISO, PJM). Requests are applications, not commitments.
How to read this
A queue request asks a grid operator (ISO/RTO) to connect a new generator or large load to the transmission system. It then moves through studies (feasibility, system impact, facilities) before an interconnection agreement, construction and service. Filing is an application, not a commitment to build. Generation totals here are active requests only.
Why most aren't built: in the queue files we ingest, PJM: 18% of 50 requests withdrawn, 22% in service; MISO: 46% of 530 requests withdrawn, 3% in service. These are shares of each published file, not completion rates. Queue sources
Data-center load requests are shown only where an ISO publishes them project by project (NYISO). Elsewhere, large loads go through utilities, and the ISO figures above (e.g. ERCOT's large-load tracking) are quoted from the operator's own documents.
Coverage
How much of this scope our sources describe. Low coverage means data isn't disclosed or not yet collected, not that there's nothing there.
Confirmed evidence = at least one fact about the facility itself from a filing, deed, permit, interconnection record, or government or utility record. Regional context (state prices, nearby plants, utility territory maps) doesn't count. Most facilities come from OpenStreetMap, which records that a building exists but rarely its power, owner or status.
| Markets | Facilities | With power | Confirmed |
|---|---|---|---|
| Northern Indiana (New Carlisle) | 1 | 0%(low) | 0% |
Markets
Click through to drill down
| Name | Facilities | Online | Pipeline | |
|---|---|---|---|---|
| Northern Indiana (New Carlisle) | 1 | — | — |
Largest operators & owners
Online + pipeline MW at linked facilities
- Oracle0 MW + 1.4 GW · 1 sites
- Related Digital0 MW + 1.4 GW · 1 sites
- Dennis Sampier— · 1 sites
- Verizon— · 1 sites
- EdgeConneX— · 1 sites
- US Signal— · 1 sites
- Comcast— · 1 sites
- Quicken Loans— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
- OpenAI0 MW + 1.4 GW · 1 sites
Utility exposure
Most likely retail utility by location (approximate)
- DTE Electric0 MW + 1.4 GW · 7 sites
- Consumers Energy CO— · 4 sites
- Midwest Energy Cooperative— · 1 sites
Grid operators (ISO / RTO)
By facility location
- MISO0 MW + 1.4 GW · 12 sites
- PJM— · 1 sites
Largest facilities
By online + pipeline MW; badge = evidence behind each figure
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| OpenAI Stargate Michigan | Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — | 1.4 GW ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
Facilities by status
- Operating12
- Under construction1
Counties
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
Not yet collected
1 sites with documented on-site generation (MW not reported)
Not yet collected
Not yet collected for this state's utilities.
1 dated permit, rezoning or commission records
OpenAI Stargate Michigan: MPSC approves DTE Electric energy contracts for data center with conditions to strengthen protections for other customers (U-21990)