Related Digital
What changedDeveloper
Related Digital is linked to 2 tracked US data centers in 2 states as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 0 MW online and 1.4 GW in the pipeline (floors: 2 of 2 report power). Every relationship cites its source.
Follow
Get changes to Related Digital
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Related Digital: US data center footprint.” /companies/related-digital. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_related_digital_2026,
title = {{Related Digital: US data center footprint}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/companies/related-digital}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
Floors, not totals: power sums only facilities with a reported or estimated figure (2 of 2), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
Develops for
- Oracle1 site · LikelyOpenAI Stargate Michigan
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| OpenAI Stargate Michigan | Developer Likely | MI | Under construction | 1.4 GW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| Related Digital / CoreWeave Cheyenne | Developer | Cheyenne, WY | Unknown | 302 MW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |