Google Fort Wayne
Google Fort Wayne is an under construction ai campus in Fort Wayne, Indiana. Operated or owned by Google. Planned capacity: 1.04 GW (estimated). Verification: under construction. 10 cited sources.
Follow
Get changes to Google Fort Wayne
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Google Fort Wayne.” /facilities/google-fort-wayne-fort-wayne-in. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_google_fort_wayne_fort_wayne_in_2026,
title = {{Google Fort Wayne}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/google-fort-wayne-fort-wayne-in}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
- ⚠ No public interconnection record for this load — PJM does not publish large-load requests.
- ⚠ No permit record linked to this site yet.
How the time-to-power window was estimated
- From “Under construction”, large loads have typically taken 0.5–2 more years to first power (editorial range; see Methodology).
- Construction to first power typically takes 1.25–2.5 years.
- The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityGoogle Fort Wayne
- →substationOn-site substation[1]Satellite imageryLikely3 substation outlines traced inside the campus on satellite imagery
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityIndiana Michigan Power (AEP)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling1
- Evaporative (cooling towers)[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 19, 2026.Aug 19, 2026cooling
“Building 2 has all cooling towers installed and is likely undergoing fit-out and commissioning.”
Named in Epoch AI's satellite-imagery notes for this date.
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates1
- Large load tariff settlement[11]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Feb 19, 2025.Feb 19, 2025Indiana Michigan Power (AEP) · Indiana Utility Regulatory Commission · Order approving settlement (with one modification)
“The IURC order approved the terms of the joint settlement, with one modification, and requires new large load customers, including data centers, to make long-term financial commitments proportional to their size.”
Location & imagery
Mapped outline- Coordinates
- 41.03182, -85.04732
- Address
- 6015 Adams Center Road, Fort Wayne, IN 46806[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 19, 2026.Likely
- County
- Allen County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- End user
- Utility
Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Heartland Remc, Paulding-Putman Elec Coop, INC, Noble County R E M C.
Power (all fields)
- Planned capacity
- 1.04 GW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 19, 2026.Likelyestimated
Projected facility power at the last tracked milestone (2028-06-23); not necessarily full build-out.
- Current facility power
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- PJM[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- State avg. industrial price
- 9.16¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Indiana statewide average, July 2026.
- State avg. commercial price
- 13.30¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Indiana statewide average, July 2026.
- Generation within 50 km
- 1.26 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
14 EIA-reported plants within 50 km.
- Generation queued in county
- 1.36 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
14 active generation interconnection requests in Allen County: Solar 1,060 MW, Storage 300 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Paulding Wind Farm II · Paulding Wind Farm II LLC | Power plant (Wind) | 22.5 km | 99 MW | [6] |
| Timber Road IV · Paulding Wind Farm IV LLC | Power plant (Wind) | 26.7 km | 125 MW | [6] |
| Paulding Wind Farm III · Paulding Wind Farm III LLC | Power plant (Wind) | 26.7 km | 101 MW | [6] |
| Timber Road Solar Park · Timber Road Solar Park | Power plant (Solar) | 27.8 km | 50 MW | [6] |
| Robert P Mone Plant · Buckeye Power, Inc | Power plant (Natural Gas) | 28.2 km | 441 MW | [6] |
| Auburn Renewables LLC · Auburn Renewables, LLC | Power plant (Solar) | 34.8 km | 11 MW | [6] |
| Northwest Ohio Wind · Northwest Ohio Wind, LLC | Power plant (Wind) | 38.1 km | 105 MW | [6] |
| Blue Creek Wind Project · Avangrid Power LLC | Power plant (Wind) | 42.3 km | 302 MW | [6] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Allen - RP Mone 345 kVPJM AH1-549 | Solar | In study · proposed 2025-12 | 180 MW | [4] |
| Allen - RP Mone 345 kVPJM AI2-426 | Solar | In study · proposed 2027-12 | 180 MW | [4] |
| Flatrock Creek Solar IPJM AF2-224 | Solar | In study · proposed 2022-09 | 100 MW | [4] |
| Flatrock Creek Solar IIPJM AG1-365 | Solar | In study · proposed 2024-10 | 100 MW | [4] |
| Tillman 138 kVPJM AG1-368 | Solar | In study · proposed 2024-10 | 100 MW | [4] |
| Allen 345 kVPJM AG2-400 | Solar | In study · proposed 2025-10 | 100 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction startApr 1, 2024[1]
- First operationalDec 1, 2026[1]Projected
- Expected completionJun 23, 2028[1]Projected
- Planned capacity
- 1.04 GW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 19, 2026.Likelyestimated
Projected facility power at the last tracked milestone (2028-06-23); not necessarily full build-out.
- Buildings (planned)
- 3[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 19, 2026.Likelyderived
Count of building outlines traced on satellite imagery.
- Buildings operational
- 0[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 19, 2026.Likelyestimated
| Phase | Status | Added MW | Completed / expected | Source |
|---|---|---|---|---|
| Building 1 | under construction | 207 MW | Dec 1, 2026 (projected) | [1] |
| Building 2 | under construction | 207 MW | Mar 31, 2027 (projected) | [1] |
| Building 3 | under construction | 207 MW | Aug 28, 2027 (projected) | [1] |
| Building 4 | under construction | 207 MW | Jan 25, 2028 (projected) | [1] |
| Building 5 | under construction | 207 MW | Jun 23, 2028 (projected) | [1] |
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
- Apr 1, 2024[1]
First signs of development/land clearing
- Sep 13, 2024[1]
Roof complete on Building 1 (the 'H'), although we suspect this building is not for AI compute due to the construction speed, irregular design, and lack of external cooling.
- Jun 10, 2025[1]
After a long quiet period they've laid foundations for Building 2 and the substation.
- Oct 1, 2025[1]
Building 2 looks externally complete
- Mar 1, 2026[1]
The cooling towers for Buildings 2 and 3 are both a little less than half done and the buildings still look like active construction sites.
- Aug 19, 2026[1]
Building 2 has all cooling towers installed and is likely undergoing fit-out and commissioning. So we give it about 3 more months until it's operational. Building 3 appears to be slightly further than Building 2 was in March, so we estimate a 4-month lag.
Estimated operational date of Building 2.
Estimated operational date of Building 3. Based on Building 3 construction looking about 4 months behind Building 2.
Estimated operational date of Building 4. Based on Building 4 construction looking about 10 months behind Building 2.
Estimated operational date of Building 5. Based on previous buildings being separated by about 5 months.
Estimated operational date of Building 6. Based on previous buildings being separated by about 5 months.
All claims (provenance audit)
30| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Google Fort Wayne | [1] | Likely | 2026-08-19 | Shown |
| Status | Under construction | [1] derived | Likely | 2024-04-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2024-09-13 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2025-06-10 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2025-10-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2026-03-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2026-08-19 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-08-19 | Shown |
| Address | 6015 Adams Center Road, Fort Wayne, IN 46806 | [1] | Likely | 2026-08-19 | Shown |
| Owner | GoogleOwner: Google | [1] | Confirmed | 2026-08-19 | Shown |
| End users | Google DeepMindUsers: Google DeepMind | [1] | Speculative | 2026-08-19 | Shown |
| Utility | Indiana Michigan Power (AEP)territory 9324: INDIANA MICHIGAN POWER CO (INVESTOR OWNED, AMERICAN ELECTRIC POW | [2] derived | Unverified | 2022 | Shown |
| Investors | GoogleInvestors: Google | [1] | Confirmed | 2026-08-19 | Shown |
| Planned capacity | 1.04 GW | [1] estimated | Likely | 2026-08-19 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Generation queued in county | 1.36 GW | [4] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 9.16¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.30¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.26 GW | [6] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 3 | [1] derived | Likely | 2026-08-19 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2026-08-19 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2024-04-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2024-09-13 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2025-06-10 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2025-10-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2026-03-01 | Superseded / alternative |
| Construction start | Apr 1, 2024 | [1] derived | Likely | 2026-08-19 | Shown |
| First operational | Dec 1, 2026 | [1] estimated | Speculative | 2026-08-19 | Shown |
| Expected completion | Jun 23, 2028 | [1] estimated | Speculative | 2026-08-19 | Shown |