Crusoe
What changedGPU cloud · crusoe.ai · also matched as Crusoe Energy
Crusoe is linked to 2 tracked US data centers in 1 state as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 590 MW online and 1.88 GW in the pipeline (floors: 2 of 2 report power). Every relationship cites its source.
Follow
Get changes to Crusoe
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Crusoe: US data center footprint.” /companies/crusoe. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_crusoe_2026,
title = {{Crusoe: US data center footprint}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/companies/crusoe}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
Floors, not totals: power sums only facilities with a reported or estimated figure (2 of 2), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.
US footprint by state
- Texas2 sites · 590 MW
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| Goodnight | Contractor | Claude, TX | Under construction | 1.29 GW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| OpenAI Stargate Abilene | Developer | Abilene, TX | Operating + expanding | 590 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |