American Electric Power
What changedUtility / energy · also matched as AEP, AEP Ohio, Ohio Power Co, AEP Texas North Company
American Electric Power is linked to 71 tracked US data centers in 4 states as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 2.22 GW online and 1.56 GW in the pipeline (floors: 7 of 71 report power). Every relationship cites its source.
Follow
Get changes to American Electric Power
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “American Electric Power: US data center footprint.” /companies/aep. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_aep_2026,
title = {{American Electric Power: US data center footprint}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/companies/aep}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
Floors, not totals: power sums only facilities with a reported or estimated figure (7 of 71), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.
US footprint by state
- Ohio67 sites · 1.63 GW
- Texas2 sites · 590 MW
- West Virginia1 sites
- Virginia1 sites
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
Supplies power to
- Amazon Web Services32 sites · LikelyAWS New Albany, Amazon AWS: Hilliard Data Center, Amazon Web Services CMH50
- Google11 sites · LikelyGoogle Columbus, Google New Albany, Google NBY-1
- Meta6 sites · ConfirmedMeta Prometheus, NAO 1/NAO 2, NAO 3
- QTS Data Centers4 sites · UnverifiedQTS NAL 2 DC1, QTS NAL 2 DC2, QTS NAL1 DC2
- Vantage Data Centers3 sites · UnverifiedVantage Building 1, Vantage Building 2, Vantage Building 3
- Oracle1 site · ConfirmedOpenAI Stargate Abilene
- Alpha Innovations1 site · UnverifiedAlpha Federal
- DartPoints1 site · UnverifiedDartPoints Dublin
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| Hut 8 Beacon Point | Utility | Corpus Christi, TX | Unknown | 1 GW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| Meta Prometheus | Utility | New Albany, OH | Operating + expanding | 612 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| OpenAI Stargate Abilene | Utility | Abilene, TX | Operating + expanding | 590 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Google New Albany | Utility Unverified | New Albany, OH | Operating | 400 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Google Columbus | Utility Likely | Columbus, OH | Operating + expanding | 364 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| AWS New Albany | Utility Unverified | OH | Operating + expanding | 255 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| DartPoints Dublin | Utility Unverified | 43017, OH | Operating | 3 MW planned AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. |
| Alpha Federal | Utility Unverified | South Charleston, WV | Operating | — |
| Amazon AWS: Hilliard Data Center | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Likely | OH | Operating | — |
| Amazon Web Services | Utility Likely | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Likely | OH | Operating | — |
| Amazon Web Services | Utility Likely | OH | Operating | — |
| Amazon Web Services | Utility Likely | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services | Utility Unverified | OH | Operating | — |
| Amazon Web Services CMH50 | Utility Unverified | OH | Operating | — |
| Amazon Web Services CMH53 | Utility Unverified | OH | Operating | — |
| Amazon Web Services CMH59 | Utility Unverified | OH | Operating | — |
| Amazon Web Services CMH56 | Utility Unverified | OH | Operating | — |
| Amazon Web Services CMH62 | Utility Unverified | OH | Operating | — |
| Compugen New Albany | Utility Unverified | OH | Operating | — |
| Compugen New Albany | Utility Unverified | OH | Operating | — |
| Utility Likely | OH | Operating | — | |
| Google Lockbourne, OH | Utility Likely | OH | Operating | — |
| Google NBY-1 | Utility Unverified | OH | Operating | — |
| Google NBY-2 | Utility Unverified | OH | Operating | — |
| Google NBY-3 | Utility Unverified | OH | Operating | — |
| Google NBY-4 | Utility Unverified | OH | Operating | — |
| Google NBY-5 | Utility Unverified | OH | Operating | — |
| Google NBY-6 | Utility Unverified | OH | Operating | — |
| Google NBY-7 | Utility Unverified | OH | Operating | — |
| LCO 1 | Utility Unverified | OH | Operating | — |
| LCO 2 | Utility Unverified | OH | Operating | — |
| Lumos Networks | Utility Likely | VA | Operating | — |
| NAO 1/NAO 2 | Utility Unverified | OH | Operating | — |
| NAO 3 | Utility Unverified | OH | Operating | — |
| NAO 5/NAO 6 | Utility Unverified | OH | Operating | — |
| Oppidan data center | Utility Unverified | OH | Operating | — |
| QTS NAL 2 DC1 | Utility Unverified | New Albany, OH | Operating | — |
| QTS NAL 2 DC2 | Utility Unverified | New Albany, OH | Operating | — |
| QTS NAL1 DC1 | Utility Unverified | New Albany, OH | Operating | — |
| QTS NAL1 DC2 | Utility Unverified | New Albany, OH | Operating | — |
| STACK New Albany | Utility Unverified | OH | Operating | — |
| TJX Corporate Techno | Utility Unverified | OH | Operating | — |
| Unnamed data center | Utility Unverified | OH | Operating | — |
| Unnamed data center | Utility Unverified | OH | Operating | — |
| Unnamed data center | Utility Unverified | OH | Operating | — |
| Unnamed data center | Utility Unverified | OH | Operating | — |
| Unnamed data center — 306 Greif Parkway | Utility Likely | Delaware, OH | Operating | — |
| Vantage Building 1 | Utility Unverified | New Albany, OH | Operating | — |
| Vantage Building 2 | Utility Unverified | New Albany, OH | Operating | — |
| Vantage Building 3 | Utility Unverified | New Albany, OH | Operating | — |