DC
/

Meta Gallatin Data Center

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.HyperscaleBuildingSumner County, Tennessee

Meta Gallatin Data Center is an operating hyperscale in Tennessee. Operated or owned by Meta. Power capacity has not been disclosed or collected yet. Verification: unverified. 5 cited sources.

Part of Meta Gallatin

20% profile completeness
14 claims from 5 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Meta Gallatin Data Center

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Meta Gallatin Data Center.” /facilities/meta-gallatin-data-center-sumner-county-tn. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_meta_gallatin_data_center_sumner_county__2026,
  title = {{Meta Gallatin Data Center}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/meta-gallatin-data-center-sumner-county-tn}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
627,800 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Cumberland Elec Member Corp · None (non-RTO region)
Substation: Unnamed substation (161 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Meta Gallatin Data Center
  2. substation
    Unnamed substation (161 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.37 km away. Proximity does not establish that it serves the site.
  3. transmission
    161 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.23 km away). Not confirmed as the supply path.
  4. utility
    Cumberland Elec Member Corp[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    None (non-RTO region)[3]
    Service territoryLikely
    Balancing authority: TVA
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Cumberland Elec Member Corp. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
36.41185, -86.36965
County
Sumner County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Meta[1]Likely
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Meta[1]Likely
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
None (non-RTO region)[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Outside all ISO/RTO footprints; balancing authority shown separately.

Balancing authority
TVA[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (161 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.4 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
161 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
7.13¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Tennessee statewide average, July 2026.

State avg. commercial price
13.43¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Tennessee statewide average, July 2026.

Generation within 50 km
1.84 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

9 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
161 kV line · Tennessee Valley AuthorityTransmission line0.23 km161 kV[1]
Gallatin (Tn) · Tennessee Valley AuthorityPower plant (Coal)11.1 km1.56 GW[5]
Old Hickory · USCE-Nashville DistrictPower plant (Hydroelectric)28.6 km116 MW[5]
J P Priest · USCE-Nashville DistrictPower plant (Hydroelectric)36.1 km30 MW[5]
Opryland Usa · Gaylord Entertainment CoPower plant (Natural Gas)36.7 km4 MW[5]
Sr Warren, LLC · SR Warren, LLCPower plant (Solar)37 km4 MW[5]
Sr Franklin, LLC · SR Franklin, LLCPower plant (Solar)37.1 km3 MW[5]
Cordell Hull · USCE-Nashville DistrictPower plant (Hydroelectric)40.5 km106 MW[5]
Vanderbilt University Power Plant · Vanderbilt UniversityPower plant (Natural Gas)48.9 km18 MW[5]
Unnamed substationSubstation0.37 km161 kV[1]
Meta Switching Station · Tennessee Valley AuthoritySubstation0.41 km161 kV[1]
Cumberland Electric Membership Corporation substation · Cumberland Electric Membership CorporationSubstation1.5 km161 kV[1]
Bledsoe Substation · Cumberland Electric Membership CorporationSubstation1.8 km161 kV[1]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
627,800 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

Other buildings on this campus

4

All claims (provenance audit)

14
FieldValueSourceConfidenceAs ofStatus
NameMeta Gallatin Data Centerway/1294595615 name=Meta Gallatin Data Center[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Facility typeHyperscale[1] derivedUnverified2026-10-12Shown
OperatorMetaoperator=Meta[1] Likely2026-10-12Shown
UtilityCumberland Elec Member Corpterritory 4624: CUMBERLAND ELEC MEMBER CORP (COOPERATIVE, CUMBERLAND ELEC MEMBER[2] derivedLikely2022Shown
ISO / RTONone (non-RTO region)[3] derivedLikely—Shown
Balancing authorityTVA[2] derivedLikely—Shown
Nearest mapped substationUnnamed substation (161 kV)way/1213758204[1] derivedLikely2026-09-28Shown
Distance to substation0.4 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby161 kV[1] derivedLikely2026-09-28Shown
State avg. industrial price7.13¢/kWh[4] Confirmed2026-07Shown
State avg. commercial price13.43¢/kWh[4] Confirmed2026-07Shown
Generation within 50 km1.84 GW[5] derivedConfirmed202502Shown
Building footprint627,800 sq ft[1] derivedLikely2026-10-12Shown