DC
/

Meta Los Lunas

Operating + expandingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.AI campusCampusLos Lunas, Valencia County, New Mexico

Meta Los Lunas is an operating + expanding ai campus in Los Lunas, New Mexico. Operated or owned by Meta; used by Meta. Current power: 114 MW (estimated). Planned capacity: 273 MW (estimated). Verification: verified operating. 8 cited sources.

80% profile completeness
26 claims from 8 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Mar 1, 2026
Follow

Get changes to Meta Los Lunas

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Meta Los Lunas.” /facilities/meta-los-lunas-los-lunas-nm. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_meta_los_lunas_los_lunas_nm_2026,
  title = {{Meta Los Lunas}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/meta-los-lunas-los-lunas-nm}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
114 MW[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Likelyestimated
Planned capacity
273 MW[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Likelyestimated
Floor area
Not yet sourced
Buildings (planned)
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Likelyderived
Capital cost / investment
$3.3B[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Likelyestimated
First operational
Mar 1, 2026[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Likelyderived

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Remaining capacity: H1 2027 – H2 2028
Medium confidencewindow, not a prediction
Project verification
Verified operating
Operation documented by satellite imagery.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Not identified
Substation: On-site substation (likely Depot Substation)

Power reality

Announced
273 MW[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Research estimate of planned capacity (no company figure found)
Interconnection request
No record
Contracted / approved
No record
Under construction
159 MW[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Building 2, Building 3 under construction (satellite-tracked phases)
Operational
114 MW[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Estimated from buildings observed operational
  • ⚠ No public interconnection record for this load.
  • ⚠ No permit record linked to this site yet.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Operational (furthest stage with documented evidence)[1]
  • Stated date: Next projected milestone: 2026-10-26 (modeled/speculative)[1]
  • Required: 273 MW
Assumptions
  • From “Under construction”, large loads have typically taken 0.5–2 more years to first power (editorial range; see Methodology).
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H1 2027 – H2 2028

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionJul 24, 2024
    Model estimate · Satellite imagery
    • Jul 24, 2024 · Reported status: under construction[1]
    • Jul 24, 2024 · Construction start[1]
    • Jul 24, 2024 · Land clearing starts for new building.[1]
    • Mar 1, 2026 · Reported status: expanding[1]
  3. EnergizationMar 1, 2026
    Satellite imagery
    • Mar 1, 2026 · Building 1 is operational, based on no construction activity around the shell and cooling equipment, and about 5 months passing after structural completion.[1]
  4. OperationalMar 1, 2026
    Satellite imagery
    • Mar 1, 2026 · Building 1 is operational, based on no construction activity around the shell and cooling equipment, and about 5 months passing after structural completion.[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.

Grid path

  1. facility
    Meta Los Lunas
  2. substation
    On-site substation (likely Depot Substation)[1][3]
    Satellite imageryLikely
    1 substation outline traced inside the campus on satellite imagery; OSM maps Depot Substation 0.31 km away
  3. transmission
    115 kV line[3]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.08 km away). Not confirmed as the supply path.
  4. utility
    Not identified
    UnknownUnverified
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling1

  • 0 million gal/day[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jul 24, 2024.Jul 24, 2024modeled water use

    Epoch AI's modeled estimate at the latest observed milestone, in million gallons per day. Not a permit or metered figure.

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for the serving utility. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
34.82674, -106.78768
Address
4250 Messenger Lp, Los Lunas, NM 87031[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Likely
County
Valencia County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
Power supply
Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Owner
Meta[1]Confirmed
End user
Meta[1]Confirmed

Power (all fields)

Current facility power
114 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Likelyestimated

Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.

Current IT capacity
87 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Likelyestimated

Estimated IT load currently online, based on buildings observed operational.

Planned capacity
273 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Likelyestimated

Projected facility power at the last tracked milestone (2028-01-01); not necessarily full build-out.

Estimated annual consumption
699 GWh/yr[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated

114 MW × 8,760 h × 70% utilization.

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

Nearest mapped substation
Depot Substation (115 kV)[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.3 km[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
115 kV[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
4.16¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

New Mexico statewide average, July 2026.

State avg. commercial price
11.90¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

New Mexico statewide average, July 2026.

Generation within 50 km
1.45 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

27 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
115 kV lineTransmission line0.08 km115 kV[3]
West Mesa to Belen 115 kV transmission line · Public Service Company of New MexicoTransmission line1.51 km115 kV[3]
Sky Ranch Solar · Sky Ranch Solar and StoragePower plant (Solar)5.1 km240 MW[5]
La Luz Energy Center · Public Service Co of NMPower plant (Natural Gas)23.6 km40 MW[5]
Valencia Energy Facility · Valencia Power LLCPower plant (Natural Gas)24.5 km144 MW[5]
Rio Bravo · Public Service Co of NMPower plant (Natural Gas)25.7 km141 MW[5]
Ford Utilities Center · University of New MexicoPower plant (Natural Gas)32.2 km13 MW[5]
Atrisco Solar LLC · Atrisco Solar LLCPower plant (Solar)40.8 km300 MW[5]
Reeves · Public Service Co of NMPower plant (Natural Gas)41.9 km146 MW[5]
Atrisco Energy Storage · Atrisco Energy Storage LLCPower plant (Batteries)42.7 km300 MW[5]
Depot Substation · MetaSubstation0.31 km115 kV[3]
South Substation · MetaSubstation0.37 km115 kV[3]
Unnamed substationSubstation2.05 km115 kV[3]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    Jul 24, 2024[1]
  5. First operational
    Mar 1, 2026[1]
  6. Expected completion
    Jan 1, 2028[1]
    Projected
Planned capacity
273 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Likelyestimated

Projected facility power at the last tracked milestone (2028-01-01); not necessarily full build-out.

Buildings (planned)
3[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Likelyderived

Count of building outlines traced on satellite imagery.

Buildings operational
1[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Likelyestimated
PhaseStatusAdded MWCompleted / expectedSource
Building 1operational114 MWMar 1, 2026[1]
Building 2under construction33 MWOct 26, 2026 (projected)[1]
Building 3under construction126 MWJan 1, 2028 (projected)[1]

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Capital cost / investment
$3.3B[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Likelyestimated

Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

Compute

Chip types
B300[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Confirmed
Compute (H100-equivalents)
99,500[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 1, 2026.Likelyestimated

What changed (last 3 years)

Follow this facility (RSS)
  • Current facility power
    105 MWMar 1, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→114 MWMar 1, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
  • Buildings (planned)
    1Mar 1, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→3Mar 1, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
  • Buildings operational
    0Jul 24, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→1Mar 1, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
  • Status
    Under constructionJul 24, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→OperatingMar 1, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→Operating + expandingMar 1, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.

Timeline

Construction start: Jul 24, 2024[1]
First operational: Mar 1, 2026[1]
  1. Jul 24, 2024[1]

    Land clearing starts for new building.

  2. Mar 1, 2026114 MW facility power· 1 buildings operational[1]

    Building 1 is operational, based on no construction activity around the shell and cooling equipment, and about 5 months passing after structural completion.

  3. Oct 26, 2026Projected147 MW facility power· 2 buildings operational[1]

    Building 2 (a tent like building) is operational. Based on a default estimate of 3 months for fit-out after structural completion in July.

  4. Jan 1, 2028Projected273 MW facility power· 3 buildings operational[1]

    Building 3 is estimated to be operational. This is estimated from the timeline of similar buildings at other Meta sites.

Buildings on this campus

5
  • MetaOperating · 656,000 sq ft footprint
  • MetaOperating · 545,000 sq ft footprint
  • MetaOperating · 656,200 sq ft footprint
  • MetaOperating · 641,500 sq ft footprint
  • MetaOperating · 641,600 sq ft footprint

All claims (provenance audit)

26
FieldValueSourceConfidenceAs ofStatus
NameMeta Los Lunas[1] Likely2026-03-01Shown
StatusUnder construction[1] derivedLikely2024-07-24Superseded / alternative
StatusOperating + expanding[1] derivedLikely2026-03-01Shown
Facility typeAI campus[1] derivedLikely2026-03-01Shown
Address4250 Messenger Lp, Los Lunas, NM 87031[1] Likely2026-03-01Shown
OwnerMetaOwner: Meta[1] Confirmed2026-03-01Shown
End usersMetaUsers: Meta[1] Confirmed2026-03-01Shown
Current facility power114 MW[1] estimatedLikely2026-03-01Shown
Current IT capacity87 MW[1] estimatedLikely2026-03-01Shown
Planned capacity273 MW[1] estimatedLikely2026-03-01Shown
Estimated annual consumption699 GWh/yr[2] estimatedSpeculative2026-10-12Shown
Nearest mapped substationDepot Substation (115 kV)way/757092656[3] derivedLikely2026-09-28Shown
Distance to substation0.3 km[3] derivedLikely2026-09-28Shown
Highest-voltage line nearby115 kV[3] derivedLikely2026-09-28Shown
State avg. industrial price4.16¢/kWh[4] Confirmed2026-07Shown
State avg. commercial price11.90¢/kWh[4] Confirmed2026-07Shown
Generation within 50 km1.45 GW[5] derivedConfirmed202502Shown
Buildings (planned)3[1] derivedLikely2026-03-01Shown
Buildings operational1[1] estimatedLikely2026-03-01Shown
Buildings operational0[1] estimatedLikely2024-07-24Superseded / alternative
Capital cost / investment$3.3B[1] estimatedLikely2026-03-01Shown
Compute (H100-equivalents)99,500[1] estimatedLikely2026-03-01Shown
Chip typesB300[1] Confirmed2026-03-01Shown
Construction startJul 24, 2024[1] derivedLikely2026-03-01Shown
First operationalMar 1, 2026[1] derivedLikely2026-03-01Shown
Expected completionJan 1, 2028[1] estimatedSpeculative2026-03-01Shown