Meta Kuna
Meta Kuna is an operating ai campus in Idaho. Operated or owned by Meta; used by Meta. Current power: 198 MW (estimated). Verification: verified operating. 14 cited sources.
Follow
Get changes to Meta Kuna
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Meta Kuna.” /facilities/meta-kuna-ada-county-id. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_meta_kuna_ada_county_id_2026,
title = {{Meta Kuna}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/meta-kuna-ada-county-id}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- EnergizationJun 1, 2026
Satellite imagery
- Jun 1, 2026 · Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026. Idaho Public Utilities Comission's approval for this start date notes tha[1]
- OperationalJun 1, 2026
Satellite imagery
- Jun 1, 2026 · Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026. Idaho Public Utilities Comission's approval for this start date notes tha[1]
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityMeta Kuna
- →substationSatellite imageryLikely3 substation outlines traced inside the campus on satellite imagery; OSM maps Unnamed substation 0.31 km away
- →transmission230 kV line[5]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.19 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
- Orchard Ranch Solar (Solar, 20 MW) is 1.2 km away[7]EIA plant within 1.5 km; proximity does not establish that it supplies the facilitySolarCo-located20 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Unverified
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling1
- 0.07 million gal/day[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 1, 2026.Jun 1, 2026modeled water use
Epoch AI's modeled estimate at the latest observed milestone, in million gallons per day. Not a permit or metered figure.
On-site generation & air permits1
- Orchard Ranch Solar (Solar, 20 MW) is 1.2 km away20 MW[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Solar · Co-located
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events4
- Application for Power Purchase Agreement, Pleasant Valley Solar 1[9]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
puc.idaho.gov
- Application for Power Purchase Agreement, Pleasant Valley Solar 2[10]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
lf-puc.idaho.gov
- Approval to move start date of Solar 2 to May 31, 2026[11]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
puc.idaho.gov
- Notice of Application for 3rd PPA (Blacks Creek Energy Center)[12]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
puc.idaho.gov
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Idaho Power. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 43.47163, -116.27199
- Address
- 601 Kuna Mora Rd, Kuna ID 83634[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 1, 2026.Likely
- County
- Ada County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
Power (all fields)
- Current facility power
- 198 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 1, 2026.Likelyestimated
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
- 152 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 1, 2026.Likelyestimated
Estimated IT load currently online, based on buildings observed operational.
- Estimated annual consumption
- 1,214 GWh/yr[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated
198 MW × 8,760 h × 70% utilization.
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- None (non-RTO region)[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
- IPCO[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Unnamed substation (230 kV)[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.3 km[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 230 kV[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 9.02¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Idaho statewide average, July 2026.
- State avg. commercial price
- 10.16¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Idaho statewide average, July 2026.
- Generation within 50 km
- 254 MW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
14 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line | Transmission line | 0.19 km | 230 kV | [5] |
| Orchard Ranch Solar · Orchard Ranch Solar, LLC | Power plant (Solar) | 1.2 km | 20 MW | [7] |
| Id Solar · AES Distributed Energy | Power plant (Solar) | 5.8 km | 40 MW | [7] |
| Lucky Peak Power Plant Project · Boise-Kuna Irrigation District | Power plant (Hydroelectric) | 18.3 km | 83 MW | [7] |
| Swan Falls · Idaho Power Co | Power plant (Hydroelectric) | 26.8 km | 24 MW | [7] |
| Arrowrock Hydroelectric Project · Boise-Kuna Irrigation District | Power plant (Hydroelectric) | 31.3 km | 16 MW | [7] |
| Murphy Flat Solar · Murphy Flat Power, LLC | Power plant (Solar) | 31.8 km | 20 MW | [7] |
| Simcoe Solar · Simcoe Solar | Power plant (Solar) | 32.7 km | 20 MW | [7] |
| Horseshoe Bend Hydroelectric CO · Horseshoe Bend Hydroelectric Co | Power plant (Hydroelectric) | 48.1 km | 9 MW | [7] |
| Unnamed substation | Substation | 0.31 km | 230 kV | [5] |
| Unnamed substation | Substation | 0.64 km | — | [5] |
| Unnamed substation | Substation | 0.71 km | — | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction startJul 1, 2022[1]
- First operationalJun 1, 2026[1]
- Expected completion—
- Buildings (planned)
- 2[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 1, 2026.Likelyderived
Count of building outlines traced on satellite imagery.
- Buildings operational
- 2[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 1, 2026.Likelyestimated
| Phase | Status | Added MW | Completed / expected | Source |
|---|---|---|---|---|
| Buildings 1–2 | operational | 198 MW | Jun 1, 2026 | [1] |
Real estate
None sourced yet
None sourced yet
None sourced yet
- Capital cost / investment
- $5.8B[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 1, 2026.Likelyestimated
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 686,100 sq ft[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Sum of 2 building outlines mapped in OpenStreetMap within this campus.
- Floor area
- Not yet sourced
Compute
- Chip types
- B300[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 1, 2026.Confirmed
- Compute (H100-equivalents)
- 173,200[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 1, 2026.Likelyestimated
What changed (last 3 years)
Follow this facility (RSS)- Buildings operational
- StatusUnder constructionJul 1, 2022[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→OperatingJun 1, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Timeline
- Jul 1, 2022[1]
Land clearing begins.
- Mar 15, 2026[1]
Building 1 and 2 look complete from outside, with all electrical and cooling equipment installed. Construction has started on 2 smaller buildings to the north. Meta announced the arrival of the first server rack the following week.
Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026. Idaho Public Utilities Comission's approval for this start date notes that "[Meta]’s load is expected to increase so much that it will suffer a capacity deficit in June 2026 if served only by Pleasant Valley Solar 1.1,” A redacted table in the staff comments document suggests the data center's load will continue to increase through August, when it presumably reaches the maximum capacity of both buildings.
All claims (provenance audit)
30| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Meta Kuna | [1] | Likely | 2026-06-01 | Shown |
| Status | Under construction | [1] derived | Likely | 2022-07-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2026-03-15 | Superseded / alternative |
| Status | Operating | [1] derived | Likely | 2026-06-01 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-06-01 | Shown |
| Address | 601 Kuna Mora Rd, Kuna ID 83634 | [1] | Likely | 2026-06-01 | Shown |
| Owner | MetaOwner: Meta | [1] | Confirmed | 2026-06-01 | Shown |
| End users | MetaUsers: Meta | [1] | Confirmed | 2026-06-01 | Shown |
| Utility | Idaho PowerEnergy companies: Idaho Power Company | [1] | Confirmed | 2026-06-01 | Shown |
| Current facility power | 198 MW | [1] estimated | Likely | 2026-06-01 | Shown |
| Current IT capacity | 152 MW | [1] estimated | Likely | 2026-06-01 | Shown |
| Estimated annual consumption | 1,214 GWh/yr | [2] estimated | Speculative | 2026-10-12 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | IPCO | [4] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (230 kV)way/1340670700 | [5] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.3 km | [5] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [5] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 9.02¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 10.16¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 254 MW | [7] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 2 | [1] derived | Likely | 2026-06-01 | Shown |
| Buildings operational | 2 | [1] estimated | Likely | 2026-06-01 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2022-07-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2026-03-15 | Superseded / alternative |
| Building footprint | 686,100 sq ftway/1455915217 way/1455915218 | [5] derived | Likely | 2026-10-12 | Shown |
| Capital cost / investment | $5.8B | [1] estimated | Likely | 2026-06-01 | Shown |
| Compute (H100-equivalents) | 173,200 | [1] estimated | Likely | 2026-06-01 | Shown |
| Chip types | B300 | [1] | Confirmed | 2026-06-01 | Shown |
| Construction start | Jul 1, 2022 | [1] derived | Likely | 2026-06-01 | Shown |
| First operational | Jun 1, 2026 | [1] derived | Likely | 2026-06-01 | Shown |