Meta Cheyenne
Meta Cheyenne is an operating + expanding ai campus in Wyoming. Operated or owned by Meta; used by Meta. Current power: 182 MW (estimated). Planned capacity: 249 MW (estimated). Verification: verified operating. 12 cited sources.
Follow
Get changes to Meta Cheyenne
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Meta Cheyenne.” /facilities/meta-cheyenne-laramie-county-wy. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_meta_cheyenne_laramie_county_wy_2026,
title = {{Meta Cheyenne}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/meta-cheyenne-laramie-county-wy}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
- ⚠ No public interconnection record for this load — None (non-RTO region) does not publish large-load requests.
- ⚠ No permit record linked to this site yet.
How the time-to-power window was estimated
- From “Under construction”, large loads have typically taken 0.5–2 more years to first power (editorial range; see Methodology).
- The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityMeta Cheyenne
- →substationSatellite imageryLikely2 substation outlines traced inside the campus on satellite imagery; OSM maps Unnamed substation 0.07 km away
- →transmissionCheyenne to 230=Terry Ranch Road & 115=Rockford[6]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.9 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling1
- 0 million gal/day[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Mar 22, 2026.Mar 22, 2026modeled water use
Epoch AI's modeled estimate at the latest observed milestone, in million gallons per day. Not a permit or metered figure.
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Black Hills Energy. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 41.07935, -104.82283
- Address
- Cheyenne, WY 82007, USA[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jul 25, 2026.Likely
- County
- Laramie County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
Power (all fields)
- Current facility power
- 182 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jul 25, 2026.Likelyestimated
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
- 152 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jul 25, 2026.Likelyestimated
Estimated IT load currently online, based on buildings observed operational.
- Planned capacity
- 249 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jul 25, 2026.Likelyestimated
Projected facility power at the last tracked milestone (2027-02-15); not necessarily full build-out.
- Estimated annual consumption
- 1,116 GWh/yr[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated
182 MW × 8,760 h × 70% utilization.
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- None (non-RTO region)[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
- WACM[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Unnamed substation (115 kV)[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.1 km[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 230 kV[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 8.62¢/kWh[8]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Wyoming statewide average, July 2026.
- State avg. commercial price
- 10.26¢/kWh[8]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Wyoming statewide average, July 2026.
- Generation within 50 km
- 1.46 GW[9]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
10 EIA-reported plants within 50 km.
- Generation queued in county
- 980 MW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
3 active generation interconnection requests in Laramie County: Wind 650 MW, Hybrid 330 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 115 kV line | Transmission line | 0.08 km | 115 kV | [6] |
| Cheyenne to 230=Terry Ranch Road & 115=Rockford · Western Area Power Administration | Transmission line | 0.9 km | 230 kV | [6] |
| South Cheyenne Solar · Southern Power Co | Power plant (Solar) | 7 km | 150 MW | [9] |
| Cheyenne Prairie Generating Station · Black Hills Service Company LLC | Power plant (Natural Gas) | 9.9 km | 131 MW | [9] |
| Corriedale Wind Energy · Black Hills Service Company LLC | Power plant (Wind) | 14 km | 53 MW | [9] |
| Roundhouse Renewable Energy II · Roundhouse Renewable Energy II, LLC | Power plant (Wind) | 14.7 km | 106 MW | [9] |
| Silver Sage Windpower · Duke Energy Renewables Services | Power plant (Wind) | 17.8 km | 42 MW | [9] |
| Roundhouse Wind Energy Project · Roundhouse Renewable Energy, LLC | Power plant (Wind) | 23.9 km | 226 MW | [9] |
| Bison Solar LLC · Bison Solar LLC | Power plant (Solar) | 28.7 km | 30 MW | [9] |
| Rawhide · Platte River Power Authority | Power plant (Natural Gas) | 29.5 km | 668 MW | [9] |
| Unnamed substation | Substation | 0.07 km | 115 kV | [6] |
| Unnamed substation | Substation | 0.55 km | 115 kV | [6] |
| Unnamed substation | Substation | 1.96 km | 115 kV | [6] |
| Unnamed substation | Substation | 2.89 km | — | [6] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| GI-TC-2024-16 at Ault-Laramie River Station 345 LineSPP GI-TC-2024-16 | Wind | IA signed · proposed 2029-06 | 400 MW | [7] |
| GI-CS-2025-04 at Ault LRS 345 LineSPP GI-CS-2025-04 | Hybrid | In study · proposed 2029-11 | 330 MW | [7] |
| GI-TC-2024-15 at Big Bear 345 Switching StationSPP GI-TC-2024-15 | Wind | IA signed · proposed 2029-09 | 250 MW | [7] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction startApr 1, 2024[1]
- First operationalJul 25, 2026[1]
- Expected completionFeb 15, 2027[1]Projected
- Planned capacity
- 249 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jul 25, 2026.Likelyestimated
Projected facility power at the last tracked milestone (2027-02-15); not necessarily full build-out.
- Buildings (planned)
- 4[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jul 25, 2026.Likelyderived
Count of building outlines traced on satellite imagery.
- Buildings operational
- 2[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jul 25, 2026.Likelyestimated
Real estate
None sourced yet
None sourced yet
None sourced yet
- Capital cost / investment
- $5.8B[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jul 25, 2026.Likelyestimated
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 635,300 sq ft[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Sum of 2 building outlines mapped in OpenStreetMap within this campus.
- Floor area
- Not yet sourced
Compute
- Chip types
- B300[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jul 25, 2026.Confirmed
- Compute (H100-equivalents)
- 172,800[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jul 25, 2026.Likelyestimated
What changed (last 3 years)
Follow this facility (RSS)- Buildings operational
- StatusUnder constructionApr 1, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→Operating + expandingJul 25, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Timeline
- Apr 1, 2024[1]
Land clearing begins.
- Jan 30, 2025[1]
Structure for Building 1 and 2 under construction.
- Mar 22, 2026[1]
Building 1 shell and cooling looks complete, Building 2 roof almost complete.
Both buildings estimated to be operational.
Buildings 3 and 4 are similar in style and size to the ones seen at the Prometheus site, we estimate their operability based on that timeline.
All claims (provenance audit)
35| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Meta Cheyenne | [1] | Likely | 2026-07-25 | Shown |
| Status | Under construction | [1] derived | Likely | 2024-04-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2025-01-30 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2026-03-22 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2026-07-25 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-07-25 | Shown |
| Address | Cheyenne, WY 82007, USA | [1] | Likely | 2026-07-25 | Shown |
| Owner | MetaOwner: Meta | [1] | Confirmed | 2026-07-25 | Shown |
| End users | MetaUsers: Meta | [1] | Confirmed | 2026-07-25 | Shown |
| Utility | Black Hills Energy | [2] | Confirmed | 2026-09-11 | Shown |
| Current facility power | 182 MW | [1] estimated | Likely | 2026-07-25 | Shown |
| Current IT capacity | 152 MW | [1] estimated | Likely | 2026-07-25 | Shown |
| Planned capacity | 249 MW | [1] estimated | Likely | 2026-07-25 | Shown |
| Estimated annual consumption | 1,116 GWh/yr | [3] estimated | Speculative | 2026-10-12 | Shown |
| ISO / RTO | None (non-RTO region) | [4] derived | Likely | — | Shown |
| Balancing authority | WACM | [5] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (115 kV)way/1493658682 | [6] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.1 km | [6] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [6] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 980 MW | [7] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 8.62¢/kWh | [8] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 10.26¢/kWh | [8] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.46 GW | [9] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 4 | [1] derived | Likely | 2026-07-25 | Shown |
| Buildings operational | 2 | [1] estimated | Likely | 2026-07-25 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2024-04-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2025-01-30 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2026-03-22 | Superseded / alternative |
| Building footprint | 635,300 sq ftway/1485867768 way/1485867769 | [6] derived | Likely | 2026-10-12 | Shown |
| Capital cost / investment | $5.8B | [1] estimated | Likely | 2026-07-25 | Shown |
| Compute (H100-equivalents) | 172,800 | [1] estimated | Likely | 2026-07-25 | Shown |
| Chip types | B300 | [1] | Confirmed | 2026-07-25 | Shown |
| Construction start | Apr 1, 2024 | [1] derived | Likely | 2026-07-25 | Shown |
| First operational | Jul 25, 2026 | [1] derived | Likely | 2026-07-25 | Shown |
| Expected completion | Feb 15, 2027 | [1] estimated | Speculative | 2026-07-25 | Shown |