Meta Sarpy

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 2, 2026.AI campusCampusSpringfield, Sarpy County, Nebraska

Meta Sarpy is an operating ai campus in Springfield, Nebraska. Operated or owned by Meta; used by Meta. Current power: 105 MW (estimated). Verification: verified operating. 9 cited sources.

70% profile completeness
30 claims from 9 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Aug 2, 2026
Follow

Get changes to Meta Sarpy

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Meta Sarpy.” /facilities/meta-sarpy-springfield-ne. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_meta_sarpy_springfield_ne_2026,
  title = {{Meta Sarpy}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/meta-sarpy-springfield-ne}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
105 MW[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 2, 2026.Likelyestimated
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 2, 2026.Likelyderived
Capital cost / investment
$3B[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 2, 2026.Likelyestimated
First operational
Aug 2, 2026[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 2, 2026.Likelyderived

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
High confidence
Project verification
Verified operating
Operation documented by satellite imagery.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Omaha Public Power District · SPP
Substation: On-site substation

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
105 MW[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Estimated from buildings observed operational
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionAug 1, 2024
    Model estimate · Satellite imagery
    • Aug 1, 2024 · Reported status: under construction[1]
    • Aug 1, 2024 · Construction start[1]
    • Aug 1, 2024 · Building 1 grading underway.[1]
  3. EnergizationAug 2, 2026
    Satellite imagery
    • Aug 2, 2026 · Building 1 is operational (estimate).[1]
  4. OperationalAug 2, 2026
    Satellite imagery
    • Aug 2, 2026 · Building 1 is operational (estimate).[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.

Grid path

  1. facility
    Meta Sarpy
  2. substation
    On-site substation[1]
    Satellite imageryLikely
    1 substation outline traced inside the campus on satellite imagery
  3. transmission
    161 kV line[5]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.27 km away). Not confirmed as the supply path.
  4. utility
    Omaha Public Power District[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    SPP[4]
    Service territoryLikely
    Balancing authority: SWPP
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling1

  • 0 million gal/day[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 4, 2026.May 4, 2026modeled water use

    Epoch AI's modeled estimate at the latest observed milestone, in million gallons per day. Not a permit or metered figure.

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Omaha Public Power District. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
41.10625, -96.14434
Address
14436-14998 Fairview Rd, Springfield, NE 68059, USA[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 2, 2026.Likely
County
Sarpy County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Owner
Meta[1]Confirmed
End user
Meta[1]Confirmed
Utility

Location falls inside this utility's retail service territory.

Power (all fields)

Current facility power
105 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 2, 2026.Likelyestimated

Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.

Current IT capacity
80 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 2, 2026.Likelyestimated

Estimated IT load currently online, based on buildings observed operational.

Estimated annual consumption
644 GWh/yr[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated

105 MW × 8,760 h × 70% utilization.

Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
SPP[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
SWPP[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
150th St & Capehart Rd Substation (161 kV)[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
1.2 km[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
161 kV[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.00¢/kWh[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Nebraska statewide average, July 2026.

State avg. commercial price
9.39¢/kWh[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Nebraska statewide average, July 2026.

Generation within 50 km
3.29 GW[8]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

16 EIA-reported plants within 50 km.

Generation queued in county
258 MW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

1 active generation interconnection requests in Sarpy County: Other 258 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
161 kV lineTransmission line0.27 km161 kV[5]
69 kV lineTransmission line0.49 km69 kV[5]
Sarpy County · Omaha Public Power DistrictPower plant (Natural Gas)16.2 km316 MW[8]
Platteview Solar LLC · AES Distributed EnergyPower plant (Solar)21.8 km81 MW[8]
Cass County · Omaha Public Power DistrictPower plant (Natural Gas)23.2 km324 MW[8]
Jones Street · Omaha Public Power DistrictPower plant (Petroleum)24.6 km124 MW[8]
Walter Scott Jr Energy Center · MidAmerican Energy CoPower plant (Coal)26.7 km1.51 GW[8]
North Omaha · Omaha Public Power DistrictPower plant (Coal)29.9 km564 MW[8]
Lon Wright · City of Fremont - (NE)Power plant (Coal)44.6 km159 MW[8]
Terry Bundy Generating Station · Lincoln Electric SystemPower plant (Natural Gas)45 km171 MW[8]
150th St & Capehart Rd Substation · Omaha Public Power DistrictSubstation1.19 km161 kV[5]
Hwy 50 Substation · Omaha Public Power DistrictSubstation2.16 km161 kV[5]
Unnamed substationSubstation2.25 km161 kV[5]
Unnamed substationSubstation2.33 km161 kV[5]
Largest queued generation in this countyFuelQueue statusMWSource
GEN-2020-031 at Substation 1363; 161kV SubstationSPP GEN-2020-031OtherIA signed · proposed 2028-02258 MW[6]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    Aug 1, 2024[1]
  5. First operational
    Aug 2, 2026[1]
  6. Expected completion
    —
Buildings (planned)
1[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 2, 2026.Likelyderived

Count of building outlines traced on satellite imagery.

Buildings operational
1[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 2, 2026.Likelyestimated
PhaseStatusAdded MWCompleted / expectedSource
Building 1operational105 MWAug 2, 2026[1]

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Capital cost / investment
$3B[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 2, 2026.Likelyestimated

Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

Compute

Chip types
B300[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 2, 2026.Confirmed
Compute (H100-equivalents)
92,000[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Aug 2, 2026.Likelyestimated

What changed (last 3 years)

Follow this facility (RSS)
  • Buildings operational
    0Aug 1, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→1Aug 2, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
  • Status
    Under constructionAug 1, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→OperatingAug 2, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.

Timeline

Construction start: Aug 1, 2024[1]
First operational: Aug 2, 2026[1]
  1. Aug 1, 2024[1]

    Building 1 grading underway.

  2. May 4, 2026[1]

    Building 1 shell, electrical and cooling equipment looks complete, with minimal construction work, so we expect it to be operational within 3 months.

  3. Aug 2, 2026105 MW facility power· 1 buildings operational[1]

    Building 1 is operational (estimate).

Buildings on this campus

2

All claims (provenance audit)

30
FieldValueSourceConfidenceAs ofStatus
NameMeta Sarpy[1] Likely2026-08-02Shown
StatusUnder construction[1] derivedLikely2024-08-01Superseded / alternative
StatusUnder construction[1] derivedLikely2026-05-04Superseded / alternative
StatusOperating[1] derivedLikely2026-08-02Shown
Facility typeAI campus[1] derivedLikely2026-08-02Shown
Address14436-14998 Fairview Rd, Springfield, NE 68059, USA[1] Likely2026-08-02Shown
OwnerMetaOwner: Meta[1] Confirmed2026-08-02Shown
End usersMetaUsers: Meta[1] Confirmed2026-08-02Shown
UtilityOmaha Public Power Districtterritory 14127: OMAHA PUBLIC POWER DISTRICT (POLITICAL SUBDIVISION, OMAHA PUBLI[2] derivedLikely2022Shown
Current facility power105 MW[1] estimatedLikely2026-08-02Shown
Current IT capacity80 MW[1] estimatedLikely2026-08-02Shown
Estimated annual consumption644 GWh/yr[3] estimatedSpeculative2026-10-12Shown
ISO / RTOSPPSOUTHWEST POWER POOL[4] derivedLikely—Shown
Balancing authoritySWPP[2] derivedLikely—Shown
Nearest mapped substation150th St & Capehart Rd Substation (161 kV)way/1204409596[5] derivedLikely2026-09-28Shown
Distance to substation1.2 km[5] derivedLikely2026-09-28Shown
Highest-voltage line nearby161 kV[5] derivedLikely2026-09-28Shown
Generation queued in county258 MW[6] derivedConfirmed2026-10-12Shown
State avg. industrial price10.00¢/kWh[7] Confirmed2026-07Shown
State avg. commercial price9.39¢/kWh[7] Confirmed2026-07Shown
Generation within 50 km3.29 GW[8] derivedConfirmed202502Shown
Buildings (planned)1[1] derivedLikely2026-08-02Shown
Buildings operational1[1] estimatedLikely2026-08-02Shown
Buildings operational0[1] estimatedLikely2024-08-01Superseded / alternative
Buildings operational0[1] estimatedLikely2026-05-04Superseded / alternative
Capital cost / investment$3B[1] estimatedLikely2026-08-02Shown
Compute (H100-equivalents)92,000[1] estimatedLikely2026-08-02Shown
Chip typesB300[1] Confirmed2026-08-02Shown
Construction startAug 1, 2024[1] derivedLikely2026-08-02Shown
First operationalAug 2, 2026[1] derivedLikely2026-08-02Shown