Mortenson is linked to 3 tracked US data centers in 3 states as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 769 MW online and 5.59 GW in the pipeline (floors: 3 of 3 report power). Every relationship cites its source.

Includes 1 related entity matched by name (e.g. property-holding LLCs), not verified
View on map →
Follow

Get changes to Mortenson

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Mortenson: US data center footprint.” /companies/mortenson. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_mortenson_2026,
  title = {{Mortenson: US data center footprint}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/companies/mortenson}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Linked facilities
3
States
3
Reported power online (floor)
769 MW
EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.100%
Reported planned capacity (floor)
6.18 GW
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.81%EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.19%
This company's facilities:Download CSVJSONAPI docs

Floors, not totals: power sums only facilities with a reported or estimated figure (3 of 3), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.

Loading map…

US footprint by state

Relationship graph

Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.

Builds for

  • Meta2 sites · Confirmed
    Meta Eagle Mountain, Meta Hyperion
  • Oracle1 site · Confirmed
    OpenAI Stargate Abilene
  • Crusoe1 site · Confirmed
    OpenAI Stargate Abilene
FacilityRoleLocationStatusPower
Meta HyperionContractor via Mortenson ConstructionLAOperating + expanding5 GW planned AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.
OpenAI Stargate AbileneContractor Abilene, TXOperating + expanding590 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Meta Eagle MountainContractor Eagle Mountain, UTOperating179 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.