Meta-QTS Hillsboro 2
Meta-QTS Hillsboro 2 is an operating ai campus in Hillsboro, Oregon. Operated or owned by Meta; used by Meta. Current power: 243 MW (estimated). Verification: verified operating. 9 cited sources.
Follow
Get changes to Meta-QTS Hillsboro 2
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Meta-QTS Hillsboro 2.” /facilities/meta-qts-hillsboro-2-hillsboro-or. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_meta_qts_hillsboro_2_hillsboro_or_2026,
title = {{Meta-QTS Hillsboro 2}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/meta-qts-hillsboro-2-hillsboro-or}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- EnergizationAug 2, 2023
Satellite imagery
- Aug 2, 2023 · Satellite imagery shows Building 2 and 3 cooling nearing completion and Building 4 cooling install continues. We believe Building 1 is operational now due to the lack of constructi[1]
- Nov 8, 2024 · We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle pres[1]
- OperationalAug 2, 2023
Satellite imagery
- Aug 2, 2023 · Satellite imagery shows Building 2 and 3 cooling nearing completion and Building 4 cooling install continues. We believe Building 1 is operational now due to the lack of constructi[1]
- Nov 8, 2024 · We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle pres[1]
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityMeta-QTS Hillsboro 2
- →substationSatellite imageryLikely2 substation outlines traced inside the campus on satellite imagery; OSM maps Shute Substation 0.45 km away
- →transmissionKeeler-Allston No 1 (500 kV)[5]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.33 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
- Constable Bess (Batteries, 75 MW) is 0.9 km away[7]EIA plant within 1.5 km; proximity does not establish that it supplies the facilityBattery storageCo-located75 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Unverified
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits1
- Constable Bess (Batteries, 75 MW) is 0.9 km away75 MW[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Battery storage · Co-located
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Portland General Electric. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 45.55894, -122.93255
- Address
- 4755 NE Huffman St, Hillsboro, OR 97124[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 17, 2026.Likely
- County
- Washington County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
Power (all fields)
- Current facility power
- 243 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 17, 2026.Likelyestimated
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
- 180 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 17, 2026.Likelyestimated
Estimated IT load currently online, based on buildings observed operational.
- Estimated annual consumption
- 1,490 GWh/yr[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated
243 MW × 8,760 h × 70% utilization.
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- None (non-RTO region)[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
- PGE[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Shute Substation (115 kV)[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.5 km[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 500 kV[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 8.92¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Oregon statewide average, July 2026.
- State avg. commercial price
- 10.60¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Oregon statewide average, July 2026.
- Generation within 50 km
- 598 MW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
30 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line | Transmission line | 0.14 km | 230 kV | [5] |
| Keeler-Forest Grove No 1 · Bonneville Power Administration | Transmission line | 0.18 km | 115 kV | [5] |
| Keeler-Forest Grove No 2 · Bonneville Power Administration | Transmission line | 0.2 km | 115 kV | [5] |
| 115 kV line | Transmission line | 0.25 km | 115 kV | [5] |
| Keeler - Sunset | Transmission line | 1.29 km | 230 kV | [5] |
| Keeler-Allston No 1 · Bonneville Power Administration | Transmission line | 1.33 km | 500 kV | [5] |
| Constable Bess · Portland General Electric Co | Power plant (Batteries) | 0.9 km | 75 MW | [7] |
| Milfordsolar Or · Adapture Renewables, Inc. | Power plant (Solar) | 9.2 km | 3 MW | [7] |
| River Road Gen Plant · PUD No 1 of Clark County - (WA) | Power plant (Natural Gas) | 19 km | 230 MW | [7] |
| Coffee Creek Bess · Portland General Electric Co | Power plant (Batteries) | 26.9 km | 17 MW | [7] |
| Sullivan · Portland General Electric Co | Power plant (Hydroelectric) | 33.4 km | 18 MW | [7] |
| Sundial (Troutdale) Bess · Troutdale Grid, LLC | Power plant (Batteries) | 39.9 km | 200 MW | [7] |
| Sulussolar17 · Adapture Renewables, Inc. | Power plant (Solar) | 45.4 km | 3 MW | [7] |
| Ssd Clackamas 1, LLC · Thor Solar 1 CEI, LLC | Power plant (Solar) | 49.2 km | 4 MW | [7] |
| Shute Substation · Portland General Electric | Substation | 0.45 km | 115 kV | [5] |
| Evergreen Substation West · Portland General Electric | Substation | 0.94 km | 230 kV | [5] |
| Sunset Substation · Portland General Electric | Substation | 1.38 km | 230 kV | [5] |
| Unnamed substation | Substation | 1.45 km | — | [5] |
| West Union Substation · Portland General Electric | Substation | 2.96 km | — | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction startApr 1, 2021[1]
- First operationalAug 2, 2023[1]
- Expected completion—
- Buildings (planned)
- 4[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 17, 2026.Likelyderived
Count of building outlines traced on satellite imagery.
- Buildings operational
- 4[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 17, 2026.Likelyestimated
Real estate
None sourced yet
None sourced yet
None sourced yet
- Capital cost / investment
- $6.8B[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 17, 2026.Likelyestimated
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
Compute
- Chip types
- H100[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 17, 2026.Confirmed
- Compute (H100-equivalents)
- 123,800[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Apr 17, 2026.Likelyestimated
What changed (last 3 years)
Follow this facility (RSS)- Current IT capacity45 MWAug 2, 2023[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→180 MWNov 8, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Current facility power61 MWAug 2, 2023[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→243 MWNov 8, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Buildings operational
- StatusOperating + expandingAug 2, 2023[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→OperatingApr 17, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Timeline
- Apr 1, 2021[1]
First signs of site land clearing appear on satellite imagery.
- Apr 29, 2023[1]
Satellite imagery shows Building 3 and 4 cooling start to go on.
Satellite imagery shows Building 2 and 3 cooling nearing completion and Building 4 cooling install continues. We believe Building 1 is operational now due to the lack of construction equipment on or immediately around the building.
We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle presence in the parking lot similar to the level seen during normal operation at other data center campuses. Finally, it is more than 12 months after cooling has been installed or in the final stages of install for the remaining three buildings.
All four buildings are operational
All four buildings are operational.
Buildings on this campus
4- QTS Data Center - Hillsboro 2Operating · 172,700 sq ft footprint
- QTS Data Center - Hillsboro 2Operating · 171,600 sq ft footprint
- QTS Data Center - Hillsboro 2Operating · 168,900 sq ft footprint
- QTS Data Center - Hillsboro 2Operating · 174,000 sq ft footprint
All claims (provenance audit)
42| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Meta-QTS Hillsboro 2 | [1] | Likely | 2026-04-17 | Shown |
| Status | Under construction | [1] derived | Likely | 2021-04-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2023-04-29 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2023-08-02 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2024-11-08 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2025-04-14 | Superseded / alternative |
| Status | Operating | [1] derived | Likely | 2026-04-17 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-04-17 | Shown |
| Address | 4755 NE Huffman St, Hillsboro, OR 97124 | [1] | Likely | 2026-04-17 | Shown |
| Owner | MetaOwner: Meta | [1] | Likely | 2026-04-17 | Shown |
| End users | MetaUsers: Meta | [1] | Likely | 2026-04-17 | Shown |
| Utility | Portland General ElectricEnergy companies: Portland General Electric | [1] | Confirmed | 2026-04-17 | Shown |
| Energy partners | AvangridEnergy companies: Avangrid | [1] | Confirmed | 2026-04-17 | Shown |
| Current facility power | 243 MW | [1] estimated | Likely | 2026-04-17 | Shown |
| Current facility power | 61 MW | [1] estimated | Likely | 2023-08-02 | Superseded / alternative |
| Current facility power | 243 MW | [1] estimated | Likely | 2024-11-08 | Superseded / alternative |
| Current facility power | 243 MW | [1] estimated | Likely | 2025-04-14 | Superseded / alternative |
| Current IT capacity | 180 MW | [1] estimated | Likely | 2026-04-17 | Shown |
| Current IT capacity | 45 MW | [1] estimated | Likely | 2023-08-02 | Superseded / alternative |
| Current IT capacity | 180 MW | [1] estimated | Likely | 2024-11-08 | Superseded / alternative |
| Current IT capacity | 180 MW | [1] estimated | Likely | 2025-04-14 | Superseded / alternative |
| Estimated annual consumption | 1,490 GWh/yr | [2] estimated | Speculative | 2026-10-12 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | PGE | [4] derived | Likely | — | Shown |
| Nearest mapped substation | Shute Substation (115 kV)way/735145719 | [5] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.5 km | [5] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 500 kV | [5] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 8.92¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 10.60¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 598 MW | [7] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 4 | [1] derived | Likely | 2026-04-17 | Shown |
| Buildings operational | 4 | [1] estimated | Likely | 2026-04-17 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2021-04-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2023-04-29 | Superseded / alternative |
| Buildings operational | 1 | [1] estimated | Likely | 2023-08-02 | Superseded / alternative |
| Buildings operational | 4 | [1] estimated | Likely | 2024-11-08 | Superseded / alternative |
| Buildings operational | 4 | [1] estimated | Likely | 2025-04-14 | Superseded / alternative |
| Capital cost / investment | $6.8B | [1] estimated | Likely | 2026-04-17 | Shown |
| Compute (H100-equivalents) | 123,800 | [1] estimated | Likely | 2026-04-17 | Shown |
| Chip types | H100 | [1] | Confirmed | 2026-04-17 | Shown |
| Construction start | Apr 1, 2021 | [1] derived | Likely | 2026-04-17 | Shown |
| First operational | Aug 2, 2023 | [1] derived | Likely | 2026-04-17 | Shown |