Google New Albany
Google New Albany is an operating ai campus in New Albany, Ohio. Operated or owned by Google. Current power: 400 MW (estimated). Verification: verified operating. 11 cited sources.
Follow
Get changes to Google New Albany
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Google New Albany.” /facilities/google-new-albany-new-albany-oh. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_google_new_albany_new_albany_oh_2026,
title = {{Google New Albany}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/google-new-albany-new-albany-oh}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionApr 20, 2024
- EnergizationSep 13, 2024
Satellite imagery
- Sep 13, 2024 · Building 2 is operational. Google Earth imagery shows 6 cooling towers installed as of 2024-04-20, and a final 7th unit appeared as of 2024-09-13, with minimal construction around [1]
- Jun 1, 2025 · Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 4 still has some work around the cooling towers. [1]
- Oct 14, 2025 · Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 5 roof is half complete. About half of the backup[1]
- OperationalSep 13, 2024
Satellite imagery · Government record
- Sep 13, 2024 · Building 2 is operational. Google Earth imagery shows 6 cooling towers installed as of 2024-04-20, and a final 7th unit appeared as of 2024-09-13, with minimal construction around [1]
- Jun 1, 2025 · Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 4 still has some work around the cooling towers. [1]
- Oct 14, 2025 · Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 5 roof is half complete. About half of the backup[1]
- Oct 12, 2026 · County land use: 305: Research/Chemical Labs[2]
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Model estimate, Satellite imagery.
Grid path
- →facilityGoogle New Albany
- →substationSatellite imageryLikely5 substation outlines traced inside the campus on satellite imagery; OSM maps Unnamed substation 0.05 km away
- →transmission138 kV line[6]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.02 km away). Not confirmed as the supply path.
- →utilityAmerican Electric Power[3]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling2
- 0.966 million gal/day[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 13, 2024.Sep 13, 2024modeled water use
Epoch AI's modeled estimate at the latest observed milestone, in million gallons per day. Not a permit or metered figure.
- Evaporative (cooling towers)[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 18, 2026.May 18, 2026cooling
“Building 5 has all cooling towers installed, and all other components look complete, but there is still light work around the building.”
Named in Epoch AI's satellite-imagery notes for this date.
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates1
- AEP Ohio data center tariff[12]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 9, 2025.Jul 9, 2025American Electric Power · Public Utilities Commission of Ohio · Docket 24-508-EL-ATA · Order issued; moratorium on new data center connections to be lifted
“AEP Ohio is ordered to file updated tariffs and lift its moratorium on connecting new data centers as soon as possible.”
Applies in AEP Ohio's territory (AEP operating company in Ohio).
Location & imagery
Mapped outline- Coordinates
- 40.05645, -82.76825
- Address
- 1101 Beech Rd SW, New Albany, OH 43054[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 18, 2026.Likely
- County
- Licking County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Property owner of record
- End user
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Licking Rural Electric INC.
Power (all fields)
- Current facility power
- 400 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 18, 2026.Likelyestimated
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
- 333 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 18, 2026.Likelyestimated
Estimated IT load currently online, based on buildings observed operational.
- Estimated annual consumption
- 2,453 GWh/yr[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated
400 MW × 8,760 h × 70% utilization.
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- PJM[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Unnamed substation (138 kV)[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.1 km[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 138 kV[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 10.95¢/kWh[8]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Ohio statewide average, July 2026.
- State avg. commercial price
- 14.06¢/kWh[8]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Ohio statewide average, July 2026.
- Generation within 50 km
- 25 MW[9]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
9 EIA-reported plants within 50 km.
- Generation queued in county
- 2.52 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
14 active generation interconnection requests in Licking County: Solar 1,773 MW, Storage 750 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 138 kV line | Transmission line | 0.02 km | 138 kV | [6] |
| Denison Solar Array · AEP Onsite Partners, LLC | Power plant (Solar) | 21.4 km | 2 MW | [9] |
| Dodge Park Engine No 1 · City of Columbus - (OH) | Power plant (Petroleum) | 23.9 km | 2 MW | [9] |
| St-1/1a Engine No 1 · City of Columbus - (OH) | Power plant (Petroleum) | 24.2 km | 1 MW | [9] |
| Renick Run Pumping Station 03-04 · City of Columbus - (OH) | Power plant (Petroleum) | 25.1 km | 2 MW | [9] |
| Ps St-8 Engine No 1 · City of Columbus - (OH) | Power plant (Petroleum) | 26.1 km | 2 MW | [9] |
| O'Shaughnessy Hydro · City of Columbus - (OH) | Power plant (Hydroelectric) | 32.3 km | 5 MW | [9] |
| Suburban Landfill Gas Recovery · WM Renewable Energy LLC | Power plant (Biomass) | 47.4 km | 6 MW | [9] |
| Igs Cmh4, LLC · Greenbacker Renewable Energy Corporation | Power plant (Solar) | 48.5 km | 4 MW | [9] |
| Unnamed substation | Substation | 0.05 km | 138 kV | [6] |
| Unnamed substation | Substation | 0.13 km | 138 kV | [6] |
| Unnamed substation | Substation | 0.14 km | 138 kV | [6] |
| Google substation · Google | Substation | 0.37 km | 138 kV | [6] |
| Unnamed substation | Substation | 0.51 km | 138 kV | [6] |
| QTS NAL-2 Substation · Quality Technology Services | Substation | 0.95 km | 138 kV | [6] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Centerburg 138 kVPJM AI2-088 | Solar | In study · proposed 2025-12 | 413 MW | [7] |
| Centerburg 138 kVPJM AG1-034 | Solar | In study · proposed 2023-10 | 363 MW | [7] |
| Centerburg 138 kVPJM AH1-036 | Storage | In study · proposed 2024-07 | 278 MW | [7] |
| Centerburg 138 kVPJM AG1-024 | Solar | In study · proposed 2023-10 | 235 MW | [7] |
| Flint GridPJM AF1-062 | Storage | IA signed · proposed 2026-11 | 200 MW | [7] |
| Jug Street 138 kVPJM AI2-226 | Storage | In study · proposed 2022-08 | 200 MW | [7] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquiredJan 2, 2019[2]
- Permitting—
- Construction startApr 20, 2024[1]
- First operationalApr 20, 2024[1]
- Expected completion—
- Buildings (planned)
- 5[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 18, 2026.Likelyderived
Count of building outlines traced on satellite imagery.
- Buildings operational
- 4[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 18, 2026.Likelyestimated
Real estate
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 094-106896-00.000 Licking County, OH | MONTAUK INNOVATIONS LLC 1600 AMPHITHEATRE PKWY , MOUNTAIN VIEW, CA | 219.25 | 305: Research/Chemical Labs | — | [2] |
- Site area
- 219.3 acres[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Sum of county land area across parcels.
- Land use
- 305: Research/Chemical Labs[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Capital cost / investment
- $12.6B[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 18, 2026.Likelyestimated
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
- NAO 1/NAO 2 · 2.0 km · parcel 094-107100-00.001$36.4M · Aug 10, 2017 [2]
- LCO 1 · 2.4 km · parcel 094-106782-00.000$34.3M · May 23, 2019 [2]
- Amazon Web Services CMH50 · 4.5 km · parcel 095-111744-00.000$12.8M · Jul 23, 2015 [2]
Size
- Building footprint
- 95,300 sq ft[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Sum of 1 building outlines mapped in OpenStreetMap within this campus.
- Parcel / land records
- 094-106896-00.000 (Licking County)[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Floor area
- Not yet sourced
Compute
- Chip types
- TPU v5e, TPU v5p, TPU v6e[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 18, 2026.Confirmed
- Compute (H100-equivalents)
- 323,900[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of May 18, 2026.Likelyestimated
What changed (last 3 years)
Follow this facility (RSS)- Current IT capacity67 MWApr 20, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→144 MWSep 13, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→222 MWJun 1, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→333 MWOct 14, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Current facility power80 MWApr 20, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→173 MWSep 13, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→267 MWJun 1, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→400 MWOct 14, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Buildings operational1Apr 20, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→2Sep 13, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→3Jun 1, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→4Oct 14, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- StatusOperating + expandingApr 20, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→OperatingMay 18, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Timeline
Building 1 is operational. Based on ~7 months since roof being completed, and cooling towers being installed sometime within that period. Building 2 roof is complete.
Building 2 is operational. Google Earth imagery shows 6 cooling towers installed as of 2024-04-20, and a final 7th unit appeared as of 2024-09-13, with minimal construction around the building. Building 3 roof is also complete.
Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 4 still has some work around the cooling towers. Work is underway on Building 5 - some walls and a few backup generators are in place.
Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 5 roof is half complete. About half of the backup generators are in place. One cooling tower is partly built.
Water vapor from cooling towers is present across Building 1-4, confirming their operation. Building 5 roof is still incomplete, but most backup generators and 5 cooling towers have been installed.
Building 5 has more cooling towers installed but not complete, and the roof is almost complete.
Building 5 has all cooling towers installed, and all other components look complete, but there is still light work around the building. Based on that, we estimate 3 more months until operational.
- Jan 2, 2019[2]
Deed/transfer recorded for parcel 094-106896-00.000 (no sale price disclosed).
Buildings on this campus
7- Google NBY-1Operating · 141,500 sq ft footprint
- Google NBY-2Operating · 142,400 sq ft footprint
- Google NBY-3Operating · 288,700 sq ft footprint
- Google NBY-4Operating · 287,100 sq ft footprint
- Google NBY-5Operating · 287,300 sq ft footprint
- Google NBY-6Operating · 287,900 sq ft footprint
- Google NBY-7Operating · 270,700 sq ft footprint
All claims (provenance audit)
59| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Google New Albany | [1] | Likely | 2026-05-18 | Shown |
| Status | Operating + expanding | [1] derived | Likely | 2024-04-20 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2024-09-13 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2025-06-01 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2025-10-14 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2026-01-18 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2026-03-12 | Superseded / alternative |
| Status | Operating | [1] derived | Likely | 2026-05-18 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-05-18 | Shown |
| Address | 1101 Beech Rd SW, New Albany, OH 43054 | [1] | Likely | 2026-05-18 | Shown |
| Property owner of record | Montauk Innovations LLCParcel 094-106896-00.000: MONTAUK INNOVATIONS LLC | [2] | Confirmed | 2026-10-12 | Shown |
| Owner | GoogleOwner: Google | [1] | Confirmed | 2026-05-18 | Shown |
| End users | Google DeepMindUsers: Google DeepMind | [1] | Speculative | 2026-05-18 | Shown |
| Utility | American Electric Powerterritory 14006: OHIO POWER CO (INVESTOR OWNED, AMERICAN ELECTRIC POWER CO) | [3] derived | Unverified | 2022 | Shown |
| Current facility power | 400 MW | [1] estimated | Likely | 2026-05-18 | Shown |
| Current facility power | 80 MW | [1] estimated | Likely | 2024-04-20 | Superseded / alternative |
| Current facility power | 173 MW | [1] estimated | Likely | 2024-09-13 | Superseded / alternative |
| Current facility power | 267 MW | [1] estimated | Likely | 2025-06-01 | Superseded / alternative |
| Current facility power | 400 MW | [1] estimated | Likely | 2025-10-14 | Superseded / alternative |
| Current facility power | 400 MW | [1] estimated | Likely | 2026-01-18 | Superseded / alternative |
| Current facility power | 400 MW | [1] estimated | Likely | 2026-03-12 | Superseded / alternative |
| Current IT capacity | 333 MW | [1] estimated | Likely | 2026-05-18 | Shown |
| Current IT capacity | 67 MW | [1] estimated | Likely | 2024-04-20 | Superseded / alternative |
| Current IT capacity | 144 MW | [1] estimated | Likely | 2024-09-13 | Superseded / alternative |
| Current IT capacity | 222 MW | [1] estimated | Likely | 2025-06-01 | Superseded / alternative |
| Current IT capacity | 333 MW | [1] estimated | Likely | 2025-10-14 | Superseded / alternative |
| Current IT capacity | 333 MW | [1] estimated | Likely | 2026-01-18 | Superseded / alternative |
| Current IT capacity | 333 MW | [1] estimated | Likely | 2026-03-12 | Superseded / alternative |
| Estimated annual consumption | 2,453 GWh/yr | [4] estimated | Speculative | 2026-10-12 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [5] derived | Likely | — | Shown |
| Balancing authority | PJM | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (138 kV)way/1245826295 | [6] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.1 km | [6] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 138 kV | [6] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 2.52 GW | [7] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 10.95¢/kWh | [8] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 14.06¢/kWh | [8] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 25 MW | [9] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 5 | [1] derived | Likely | 2026-05-18 | Shown |
| Buildings operational | 4 | [1] estimated | Likely | 2026-05-18 | Shown |
| Buildings operational | 1 | [1] estimated | Likely | 2024-04-20 | Superseded / alternative |
| Buildings operational | 2 | [1] estimated | Likely | 2024-09-13 | Superseded / alternative |
| Buildings operational | 3 | [1] estimated | Likely | 2025-06-01 | Superseded / alternative |
| Buildings operational | 4 | [1] estimated | Likely | 2025-10-14 | Superseded / alternative |
| Buildings operational | 4 | [1] estimated | Likely | 2026-01-18 | Superseded / alternative |
| Buildings operational | 4 | [1] estimated | Likely | 2026-03-12 | Superseded / alternative |
| Building footprint | 95,300 sq ftway/1375443893 | [6] derived | Likely | 2026-10-12 | Shown |
| Site area | 219.3 acres | [2] | Confirmed | 2026-10-12 | Shown |
| Capital cost / investment | $12.6B | [1] estimated | Likely | 2026-05-18 | Shown |
| Parcel / land records | 094-106896-00.000 (Licking County) | [2] | Confirmed | 2026-10-12 | Shown |
| Assessed value (official) | $285.3M | [2] | Confirmed | 2026 | Shown |
| Land use | 305: Research/Chemical Labs | [2] | Confirmed | 2026-10-12 | Shown |
| Compute (H100-equivalents) | 323,900 | [1] estimated | Likely | 2026-05-18 | Shown |
| Chip types | TPU v5e | [1] | Confirmed | 2026-05-18 | Shown |
| Chip types | TPU v5p | [1] | Confirmed | 2026-05-18 | Shown |
| Chip types | TPU v6e | [1] | Confirmed | 2026-05-18 | Shown |
| Land acquired | Jan 2, 2019 | [2] derived | Confirmed | 2026-10-12 | Shown |
| Construction start | Apr 20, 2024 | [1] derived | Likely | 2026-05-18 | Shown |
| First operational | Apr 20, 2024 | [1] derived | Likely | 2026-05-18 | Shown |