Lumos Networks

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.UnclassifiedSiteLynchburg, Virginia

Lumos Networks is an operating data center in Virginia. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.

10% profile completeness
12 claims from 6 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Lumos Networks

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Lumos Networks.” /facilities/lumos-networks-lynchburg-va. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_lumos_networks_lynchburg_va_2026,
  title = {{Lumos Networks}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/lumos-networks-lynchburg-va}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
American Electric Power · PJM
Substation: Blackwater (69 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Lumos Networks
  2. substation
    Blackwater (69 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.44 km away. Proximity does not establish that it serves the site.
  3. transmission
    69 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.49 km away). Not confirmed as the supply path.
  4. utility
    American Electric Power[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

QueueRelationshipStageMW req.MW appr.QueuedExpected in servicePOI / TOSource · as of
PJM AB2-109
Reusens Hydro Electric Generating Plant · Hydro
Possibly related generation
Speculative
Generation request name/developer shares “electric” with this facility, in the same county. Not confirmed as serving it.
In service
In Service; feasibility: Document Posted; system impact: Document Posted; facilities: Not Required; ISA/GIA: Document Posted
12.5 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.4Apr 28, 2016In service Nov 29, 2017Reusens 34.5kV
TO: AEP
[4] Oct 12, 2026

On-site & dedicated generation

  • PJM AB2-109 Reusens Hydro Electric Generating Plant (Hydro, 12.5 MW requested)[4]
    Generation request name/developer shares “electric” with this facility, in the same county. Not confirmed as serving it.
    HydroArrangement unknown13 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Speculative

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for American Electric Power. Know one? Add a source

Location & imagery

Street address
Coordinates
37.41569, -79.14271
County
Lynchburg
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Blackwater (69 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.4 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
69 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.07¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Virginia statewide average, July 2026.

State avg. commercial price
11.68¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Virginia statewide average, July 2026.

Generation within 50 km
341 MW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

17 EIA-reported plants within 50 km.

Generation queued in county
40 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

2 active generation interconnection requests in Lynchburg: Storage 40 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
69 kV line · Appalachian Power CompanyTransmission line0.49 km69 kV[1]
Reusens · Eagle Creek Renewable Energy, LLCPower plant (Hydroelectric)6.6 km13 MW[6]
Depot Solar Center, LLC · Emerald Hills Holding I, LLCPower plant (Solar)15.7 km15 MW[6]
Georgia-Pacific Big Island · GP Big Island LLCPower plant (Biomass)23 km7 MW[6]
Caden Energix Pamplin LLC · Caden Energix Pamplin LLCPower plant (Solar)34.7 km16 MW[6]
Altavista Solar · Altavista Solar, LLCPower plant (Solar)34.8 km80 MW[6]
Altavista Power Station · Virginia Electric & Power CoPower plant (Biomass)35 km51 MW[6]
Leesville · Appalachian Power CoPower plant (Hydroelectric)42.6 km50 MW[6]
Water Strider Solar · Consolidated Edison Development Inc.Power plant (Solar)45.6 km80 MW[6]
BlackwaterSubstation0.44 km69 kV[1]
Elm Street Substation · Appalachian Power CompanySubstation1.31 km69 kV[1]
Dearington SubstationSubstation2.05 km69 kV[1]
Rivermont Substation · Appalachian Power CompanySubstation2.9 km69 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Reusens 12.47 kVPJM AG2-202StorageIn study · proposed 2022-1020 MW[4]
Perkins Park 12.47 kVPJM AG2-203StorageIn study · proposed 2022-1020 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

12
FieldValueSourceConfidenceAs ofStatus
NameLumos Networksnode/5225685660 name=Lumos Networks[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
UtilityAmerican Electric Powerterritory 733: APPALACHIAN POWER CO (INVESTOR OWNED, AMERICAN ELECTRIC POWER CO)[2] derivedLikely2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Nearest mapped substationBlackwater (69 kV)way/560590868[1] derivedLikely2026-09-28Shown
Distance to substation0.4 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby69 kV[1] derivedLikely2026-09-28Shown
Generation queued in county40 MW[4] derivedConfirmed2026-10-12Shown
State avg. industrial price10.07¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price11.68¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km341 MW[6] derivedConfirmed202502Shown