DC
/

Google Lockbourne, OH

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.HyperscaleBuildingFranklin County, Ohio

Google Lockbourne, OH is an operating hyperscale in Ohio. Operated or owned by Google. Power capacity has not been disclosed or collected yet. Verification: verified operating. 7 cited sources.

Part of Google Columbus

30% profile completeness
22 claims from 8 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Google Lockbourne, OH

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Google Lockbourne, OH.” /facilities/google-lockbourne-oh-franklin-county-oh. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_google_lockbourne_oh_franklin_county_oh_2026,
  title = {{Google Lockbourne, OH}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/google-lockbourne-oh-franklin-county-oh}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
1.17M sq ft[2]
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
High confidence
Project verification
Verified operating
Operation documented by government record.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
American Electric Power · PJM
Substation: Unnamed substation (138 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredJun 8, 2022
    Government record
    • Jun 8, 2022 · Land acquisition / deed recorded[2]
    • Jun 8, 2022 · Deed/transfer recorded for parcel 510-180711 (no sale price disclosed).[2]
    • Oct 12, 2026 · Owner of record in county parcel data[2]
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map · Government record
    • Oct 12, 2026 · Reported status: operating[1]
    • Oct 12, 2026 · County land use: data center[2]
    • Oct 12, 2026 · County records a 1,172,656 sq ft building[2]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Community map.

Grid path

  1. facility
    Google Lockbourne, OH
  2. substation
    Unnamed substation (138 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.37 km away. Proximity does not establish that it serves the site.
  3. transmission
    345 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.61 km away). Not confirmed as the supply path.
  4. utility
    American Electric Power[3]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[4]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates1

  • AEP Ohio data center tariff[8]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 9, 2025.Jul 9, 2025
    American Electric Power · Public Utilities Commission of Ohio · Docket 24-508-EL-ATA · Order issued; moratorium on new data center connections to be lifted

    “AEP Ohio is ordered to file updated tariffs and lift its moratorium on connecting new data centers as soon as possible.”

    Applies in AEP Ohio's territory (AEP operating company in Ohio).

Location & imagery

Mapped outline
Coordinates
39.84957, -82.99630
County
Franklin County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Google[1]Likely
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Property owner of record
Operator
Google[1]Likely
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (138 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.4 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
345 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.95¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Ohio statewide average, July 2026.

State avg. commercial price
14.06¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Ohio statewide average, July 2026.

Generation within 50 km
1.98 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

15 EIA-reported plants within 50 km.

Generation queued in county
1.66 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

8 active generation interconnection requests in Franklin County: Solar 845 MW, Storage 810 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
138 kV lineTransmission line0.41 km138 kV[1]
Cyprus 138kV Extension · American Electric PowerTransmission line0.83 km138 kV[1]
345 kV line · American Electric PowerTransmission line1.61 km345 kV[1]
Darby Power, LLC · Darby Power, LLCPower plant (Natural Gas)21.6 km480 MW[7]
Big Plain Solar, LLC · Leeward Asset Management, LLCPower plant (Solar)28.4 km196 MW[7]
Fox Squirrel Solar · EDF Renewable Asset Holdings, Inc.Power plant (Solar)32.7 km577 MW[7]
O'Shaughnessy Hydro · City of Columbus - (OH)Power plant (Hydroelectric)35.6 km5 MW[7]
Atlanta Farms Solar · Dominion Renewable EnergyPower plant (Solar)35.7 km200 MW[7]
Yellowbud Solar, LLC · Yellowbud Solar LLCPower plant (Solar)39 km274 MW[7]
Salt City Solar Project - Hybrid · Salt City Solar LLCPower plant (Solar)48.4 km50 MW[7]
Madison Fields Solar Project, LLC · Madison Fields Solar Project, LLCPower plant (Solar)48.8 km180 MW[7]
Unnamed substationSubstation0.37 km138 kV[1]
Unnamed substationSubstation0.44 km138 kV[1]
Unnamed substationSubstation0.45 km138 kV[1]
Cyprus Switching Station · AEP OhioSubstation0.84 km138 kV[1]
Parsons Substation · AEP OhioSubstation1.17 km138 kV[1]
Unnamed substationSubstation2.61 km69 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Beatty 345 kVPJM AG2-376StorageIn study · proposed 2024-11400 MW[5]
Cole 345 kVPJM AH1-318StorageIn study · proposed 2025-12310 MW[5]
Cole Road 345 kVPJM AI2-171SolarIn study · proposed 2023-12310 MW[5]
Cole 345 kVPJM AF1-275SolarIn study · proposed 2022-12250 MW[5]
Pleasant Prairie SolarPJM AE2-214SolarIA signed · proposed 2026-12200 MW[5]
Hayden 345 kVPJM AH1-270SolarIn study · proposed 2023-1285 MW[5]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    Jun 8, 2022[2]
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year
  • $242.1M[2]
    Auditor value · tax year current (2026) · parcel 510-180711
  • $33.6M[2]
    Auditor value — land · tax year current (2026) · parcel 510-180711
  • $208.4M[2]
    Auditor value — improvements · tax year current (2026) · parcel 510-180711
Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

ParcelRecord ownerAcresZoning / useBuilding sq ftSource
510-180711
Franklin County, OH
MAGELLAN ENTERPRISES LLC
Tax bills to: GOOGLE LLC
PO BOX 28190 SCOTTSDALE AZ 85255-0153
480.39data center1,172,656[2]
Site area
480.4 acres[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed

Sum of county land area across parcels.

Sources disagree. Also reported: 263.5 acres[1] (likely)
Land use
data center[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Annual property tax
Not yet sourced
Nearby comparable transactions

Size

Floor area
1.17M sq ft[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed

Building area in county assessment records.

Parcel / land records
510-180711 (Franklin County)[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

  1. Jun 8, 2022[2]

    Deed/transfer recorded for parcel 510-180711 (no sale price disclosed).

Other buildings on this campus

2

All claims (provenance audit)

22
FieldValueSourceConfidenceAs ofStatus
NameGoogle Lockbourne, OHway/1281982556 name=Google Lockbourne, OH[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Facility typeHyperscale[1] derivedUnverified2026-10-12Shown
Property owner of recordMagellan Enterprises LLCParcel 510-180711: MAGELLAN ENTERPRISES LLC (tax mailing name: GOOGLE LLC)[2] Confirmed2026-10-12Shown
OperatorGoogleoperator=Google[1] Likely2026-10-12Shown
UtilityAmerican Electric Powerterritory 14006: OHIO POWER CO (INVESTOR OWNED, AMERICAN ELECTRIC POWER CO)[3] derivedLikely2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[4] derivedLikely—Shown
Balancing authorityPJM[3] derivedLikely—Shown
Nearest mapped substationUnnamed substation (138 kV)way/1525005865[1] derivedLikely2026-09-28Shown
Distance to substation0.4 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby345 kV[1] derivedLikely2026-09-28Shown
Generation queued in county1.66 GW[5] derivedConfirmed2026-10-12Shown
State avg. industrial price10.95¢/kWh[6] Confirmed2026-07Shown
State avg. commercial price14.06¢/kWh[6] Confirmed2026-07Shown
Generation within 50 km1.98 GW[7] derivedConfirmed202502Shown
Floor area1.17M sq ft[2] Confirmed2026-10-12Shown
Site area263.5 acres[1] derivedLikely2026-10-12Superseded / alternative
Site area480.4 acres[2] Confirmed2026-10-12Shown
Parcel / land records510-180711 (Franklin County)[2] Confirmed2026-10-12Shown
Assessed value (official)$242.1M[2] Confirmed2026Shown
Land usedata center[2] Confirmed2026-10-12Shown
Land acquiredJun 8, 2022[2] derivedConfirmed2026-10-12Shown