Microsoft Project Osmium
Microsoft Project Osmium is an operating ai campus in Cumming, Iowa. Operated or owned by Microsoft. Current power: 228 MW (estimated). Verification: verified operating. 11 cited sources.
Follow
Get changes to Microsoft Project Osmium
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Microsoft Project Osmium.” /facilities/microsoft-project-osmium-cumming-ia. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_microsoft_project_osmium_cumming_ia_2026,
title = {{Microsoft Project Osmium}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/microsoft-project-osmium-cumming-ia}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- EnergizationJan 1, 2021
- OperationalJan 1, 2021
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityMicrosoft Project Osmium
- →substationOn-site substation[1]Satellite imageryLikely1 substation outline traced inside the campus on satellite imagery
- →transmission161 kV line[5]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.26 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for MidAmerican Energy. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 41.49637, -93.78742
- Address
- 5855 SW Kerry St, Cumming, IA 50061[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likely
- County
- Warren County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
Power (all fields)
- Current facility power
- 228 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyestimated
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
- 190 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyestimated
Estimated IT load currently online, based on buildings observed operational.
- Estimated annual consumption
- 1,398 GWh/yr[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated
228 MW × 8,760 h × 70% utilization.
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- MISO[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- MISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Microsoft Project Osmium Data Center (161 kV)[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.6 km[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 161 kV[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 9.99¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Iowa statewide average, July 2026.
- State avg. commercial price
- 13.27¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Iowa statewide average, July 2026.
- Generation within 50 km
- 1.46 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
18 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 161 kV line · MidAmerican Energy | Transmission line | 0.26 km | 161 kV | [5] |
| River Hills · MidAmerican Energy Co | Power plant (Natural Gas) | 17.4 km | 113 MW | [7] |
| Sycamore (Ia) · MidAmerican Energy Co | Power plant (Natural Gas) | 21.6 km | 141 MW | [7] |
| Greater Des Moines · MidAmerican Energy Co | Power plant (Natural Gas) | 22.6 km | 504 MW | [7] |
| Pleasant Hill · MidAmerican Energy Co | Power plant (Natural Gas) | 22.9 km | 154 MW | [7] |
| Indianola · Indianola Municipal Utilities | Power plant (Petroleum) | 24.1 km | 42 MW | [7] |
| Arbor Hill Solar · MidAmerican Energy Co | Power plant (Solar) | 39.7 km | 24 MW | [7] |
| Arbor Hill Wind Farm · MidAmerican Energy Co | Power plant (Wind) | 40.8 km | 310 MW | [7] |
| Macksburg Wind Project · MidAmerican Energy Co | Power plant (Wind) | 41.4 km | 120 MW | [7] |
| Microsoft Project Osmium Data Center · MidAmerican Energy | Substation | 0.55 km | 161 kV | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction startDec 18, 2018[1]
- First operationalJan 1, 2021[1]
- Expected completion—
- Buildings (planned)
- 4[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyderived
Count of building outlines traced on satellite imagery.
- Buildings operational
- 4[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyestimated
Real estate
None sourced yet
None sourced yet
None sourced yet
- Capital cost / investment
- $7.2B[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyestimated
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
Compute
- Chip types
- A100, H100, B200[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Confirmed
- Compute (H100-equivalents)
- 155,600[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyestimated
What changed (last 3 years)
Follow this facility (RSS)- Current IT capacity95 MWJun 30, 2023[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→190 MWMar 1, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Current facility power114 MWJun 30, 2023[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→228 MWMar 1, 2025[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Buildings operational
- StatusOperating + expandingJan 1, 2021[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→OperatingJun 16, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Timeline
- Dec 18, 2018[1]
Land clearing begins on the north part of the site
Building 1 and 1st building on the site are operational. Foundation work begins on Building 2
Building 2 is operational. Estimated based on Microsoft H100 count 2023
Building 3-4 operational, no visible construction.
Site already complete.
No notable changes since October.
Buildings on this campus
5All claims (provenance audit)
45| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Microsoft Project Osmium | [1] | Likely | 2026-06-16 | Shown |
| Status | Under construction | [1] derived | Likely | 2018-12-18 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2021-01-01 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2023-06-30 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2025-03-01 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2025-10-08 | Superseded / alternative |
| Status | Operating | [1] derived | Likely | 2026-06-16 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-06-16 | Shown |
| Address | 5855 SW Kerry St, Cumming, IA 50061 | [1] | Likely | 2026-06-16 | Shown |
| Owner | MicrosoftOwner: Microsoft | [1] | Confirmed | 2026-06-16 | Shown |
| End users | OpenAIUsers: OpenAI | [1] | Speculative | 2026-06-16 | Shown |
| Utility | MidAmerican Energyterritory 12341: MIDAMERICAN ENERGY CO (INVESTOR OWNED, BERKSHIRE HATHAWAY ENERG | [2] derived | Unverified | 2022 | Shown |
| Current facility power | 228 MW | [1] estimated | Likely | 2026-06-16 | Shown |
| Current facility power | 57 MW | [1] estimated | Likely | 2021-01-01 | Superseded / alternative |
| Current facility power | 114 MW | [1] estimated | Likely | 2023-06-30 | Superseded / alternative |
| Current facility power | 228 MW | [1] estimated | Likely | 2025-03-01 | Superseded / alternative |
| Current facility power | 228 MW | [1] estimated | Likely | 2025-10-08 | Superseded / alternative |
| Current IT capacity | 190 MW | [1] estimated | Likely | 2026-06-16 | Shown |
| Current IT capacity | 48 MW | [1] estimated | Likely | 2021-01-01 | Superseded / alternative |
| Current IT capacity | 95 MW | [1] estimated | Likely | 2023-06-30 | Superseded / alternative |
| Current IT capacity | 190 MW | [1] estimated | Likely | 2025-03-01 | Superseded / alternative |
| Current IT capacity | 190 MW | [1] estimated | Likely | 2025-10-08 | Superseded / alternative |
| Estimated annual consumption | 1,398 GWh/yr | [3] estimated | Speculative | 2026-10-12 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [4] derived | Likely | — | Shown |
| Balancing authority | MISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Microsoft Project Osmium Data Center (161 kV)way/830885772 | [5] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.6 km | [5] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 161 kV | [5] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 9.99¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.27¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.46 GW | [7] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 4 | [1] derived | Likely | 2026-06-16 | Shown |
| Buildings operational | 4 | [1] estimated | Likely | 2026-06-16 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2018-12-18 | Superseded / alternative |
| Buildings operational | 1 | [1] estimated | Likely | 2021-01-01 | Superseded / alternative |
| Buildings operational | 2 | [1] estimated | Likely | 2023-06-30 | Superseded / alternative |
| Buildings operational | 4 | [1] estimated | Likely | 2025-03-01 | Superseded / alternative |
| Buildings operational | 4 | [1] estimated | Likely | 2025-10-08 | Superseded / alternative |
| Capital cost / investment | $7.2B | [1] estimated | Likely | 2026-06-16 | Shown |
| Compute (H100-equivalents) | 155,600 | [1] estimated | Likely | 2026-06-16 | Shown |
| Chip types | A100 | [1] | Confirmed | 2026-06-16 | Shown |
| Chip types | H100 | [1] | Confirmed | 2026-06-16 | Shown |
| Chip types | B200 | [1] | Confirmed | 2026-06-16 | Shown |
| Construction start | Dec 18, 2018 | [1] derived | Likely | 2026-06-16 | Shown |
| First operational | Jan 1, 2021 | [1] derived | Likely | 2026-06-16 | Shown |