Microsoft Leesburg Building 1
Microsoft Leesburg Building 1 is an under construction hyperscale in Leesburg, Virginia. Operated or owned by Microsoft. Power capacity has not been disclosed or collected yet. Verification: under construction. 7 cited sources.
Part of Microsoft — Leesburg, VA campus
Follow
Get changes to Microsoft Leesburg Building 1
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Microsoft Leesburg Building 1.” /facilities/microsoft-leesburg-building-1-leesburg-va. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_microsoft_leesburg_building_1_leesburg_v_2026,
title = {{Microsoft Leesburg Building 1}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/microsoft-leesburg-building-1-leesburg-va}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
- ⚠ No public interconnection record for this load — PJM does not publish large-load requests.
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- PermittingOct 12, 2026
Permit / site plan
- Oct 12, 2026 · Permit / case BLDC-2024-000861[2]
- Oct 12, 2026 · Permit / case B20615360100[2]
- Oct 12, 2026 · Permit / case B00263240100[2]
- Oct 12, 2026 · Permit / case B00263150100[2]
- Oct 12, 2026 · Permit / case B10443020100[2]
- Oct 12, 2026 · Permit / case B00227720100[2]
- Oct 12, 2026 · Permit / case B10442950100[2]
- Oct 12, 2026 · Permit / case B10443010100[2]
- +7 more
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Permit / site plan, Community map.
Grid path
- →facilityMicrosoft Leesburg Building 1
- →substationUnnamed substation (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.23 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.31 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates1
- GS-5 rate class for customers demanding 25 MW or more[8]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 25, 2025.Nov 25, 2025Dominion Energy · Virginia State Corporation Commission · Docket PUR-2025-00058 · Final order issued · effective Jan 1, 2027
“the new GS-5 rate class will comprise customers demanding 25 megawatts or more. The new rate class will be effective beginning January 1, 2027.”
Applies to Dominion Energy Virginia's service territory; the facility's utility is the most likely retail provider by location unless a source names it.
Location & imagery
Mapped outline- Coordinates
- 39.07479, -77.56413
- Address
- 19515 Compass Creek Parkway, Leesburg, VA 20175[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- County
- Loudoun County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Northern Virginia Elec Coop.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- PJM[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Unnamed substation (230 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 1.2 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 10.07¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Virginia statewide average, July 2026.
- State avg. commercial price
- 11.68¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Virginia statewide average, July 2026.
- Generation within 50 km
- 1.39 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
33 EIA-reported plants within 50 km.
- Generation queued in county
- 1.04 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
11 active generation interconnection requests in Loudoun County: Storage 940 MW, Solar 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line | Transmission line | 1.31 km | 230 kV | [1] |
| Potomac Energy Center, LLC · Potomac Energy Center LLC | Power plant (Natural Gas) | 2.5 km | 766 MW | [7] |
| Montgomery County Resource Recovery · Covanta Montgomery, Inc. | Power plant (Biomass) | 16.8 km | 54 MW | [7] |
| Dickerson Power · Dickerson Power, LLC | Power plant (Natural Gas) | 17.3 km | 299 MW | [7] |
| Blake Solar Plant · Horus West Virginia 1, LLC | Power plant (Solar) | 31.3 km | 80 MW | [7] |
| Nih Cogeneration Facility · National Institutes of Health | Power plant (Natural Gas) | 41.5 km | 28 MW | [7] |
| Fort Detrick Solar PV · Montevue Lane Solar, LLC | Power plant (Solar) | 41.8 km | 22 MW | [7] |
| Energix Nokesville, LLC · Energix Nokesville, LLC | Power plant (Solar) | 44.9 km | 20 MW | [7] |
| Covanta Alexandria/Arlington Energy · Covanta Alexandria/Arlington | Power plant (Biomass) | 48.4 km | 29 MW | [7] |
| Unnamed substation | Substation | 1.23 km | 230 kV | [1] |
| Altair Switching Station | Substation | 1.31 km | 230 kV | [1] |
| Cochran Mill Delivery Point | Substation | 2.36 km | 230 kV | [1] |
| Belmont Substation · Virginia Electric and Power Company | Substation | 2.77 km | 230 kV | [1] |
| Stonewater Substation | Substation | 2.78 km | 230 kV | [1] |
| Goose Creek Substation · Dominion Energy | Substation | 2.79 km | 500 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Loudoun 230 kVPJM AG2-285 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| Beaumeade 230 kVPJM AG2-287 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| New Road StoragePJM AE2-019 | Storage | IA signed · proposed 2026-12 | 120 MW | [5] |
| Dulles SolarPJM AF1-147 | Solar | IA signed · proposed 2023-12 | 100 MW | [5] |
| Roundtable 230 kVPJM AG2-307 | Storage | In study · proposed 2023-12 | 100 MW | [5] |
| Shelhorn 230 kVPJM AG2-323 | Storage | In study · proposed 2023-12 | 100 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
- Permit / case numbers
- BLDC-2024-000861, B20615360100, B00263240100, B00263150100, B10443020100, B00227720100, B10442950100, B10443010100, B10442990100, B10442980100, B10442960100, B10443050100, B10443060100, B10443040100, B10443030100[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Real estate
None sourced yet
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 235297431000 Loudoun County, VA | MICROSOFT CORP Project: Compass Creek | 311.38 | TOWNS · Data Center | 1,289,688 built/under construction | [2] |
- Site area
- 311.4 acres[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Legal acreage of the parcel(s).
- Zoning
- TOWNS[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Land use
- Data Center[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Annual property tax
- Not yet sourced
Size
- Floor area
- 1.29M sq ft[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Building area on the county's data-center parcel inventory (from building permits).
- Building footprint
- 155,500 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Parcel / land records
- MCPI 235297431000 (Loudoun County)[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
What changed (last 3 years)
Follow this facility (RSS)- StatusOperatingSep 27, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→Under constructionSep 27, 2026[2]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Timeline
No dated events sourced yet.
Other buildings on this campus
1- Microsoft Leesburg Building 2Under construction · 97,700 sq ft footprint
All claims (provenance audit)
38| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Microsoft Leesburg Building 1way/886330269 name=Microsoft Leesburg Building 1 | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Superseded / alternative |
| Status | Under construction | [2] derived | Confirmed | 2026-10-12 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-10-12 | Shown |
| Address | 19515 Compass Creek Parkway, Leesburg, VA 20175 | [1] | Likely | 2026-10-12 | Shown |
| Property owner of record | MicrosoftMCPI 235297431000: MICROSOFT CORP | [2] | Confirmed | 2026-10-12 | Shown |
| Operator | Microsoftoperator=Microsoft | [1] | Likely | 2026-10-12 | Shown |
| Utility | Dominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE | [3] derived | Unverified | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [4] derived | Likely | — | Shown |
| Balancing authority | PJM | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (230 kV)way/1292897238 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.2 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.04 GW | [5] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 10.07¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.39 GW | [7] derived | Confirmed | 202502 | Shown |
| Permit / case numbers | BLDC-2024-000861 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B20615360100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B00263240100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B00263150100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B10443020100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B00227720100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B10442950100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B10443010100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B10442990100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B10442980100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B10442960100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B10443050100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B10443060100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B10443040100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B10443030100 | [2] | Confirmed | 2026-10-12 | Shown |
| Floor area | 1.29M sq ft | [2] | Confirmed | 2026-10-12 | Shown |
| Building footprint | 155,500 sq ft | [1] derived | Likely | 2026-10-12 | Shown |
| Site area | 311.4 acres | [2] | Confirmed | 2026-10-12 | Shown |
| Parcel / land records | MCPI 235297431000 (Loudoun County) | [2] | Confirmed | 2026-10-12 | Shown |
| Zoning | TOWNS | [2] | Confirmed | 2026-10-12 | Shown |
| Land use | Data Center | [2] | Confirmed | 2026-10-12 | Shown |