Microsoft
Microsoft is an operating hyperscale in Texas. Operated or owned by Microsoft. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.
Part of Microsoft SAT40
Follow
Get changes to Microsoft
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Microsoft.” /facilities/microsoft-bexar-county-tx-4. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_microsoft_bexar_county_tx_4_2026,
title = {{Microsoft}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/microsoft-bexar-county-tx-4}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityMicrosoft
- →substationRafter Substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.41 km away. Proximity does not establish that it serves the site.
- →transmission345 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.96 km away). Not confirmed as the supply path.
- →utilityPedernales Electric Coop, INC[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Pedernales Electric Coop, INC. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 29.41896, -98.80291
- County
- Bexar County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Guadalupe Valley Elec Coop INC, Karnes Electric Coop INC, Bandera Electric Coop, INC.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- ERCOT[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- ERCO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Rafter Substation (138 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.4 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 345 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 7.07¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Texas statewide average, July 2026.
- State avg. commercial price
- 8.47¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Texas statewide average, July 2026.
- Generation within 50 km
- 4.1 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
19 EIA-reported plants within 50 km.
- Generation queued in county
- 4.96 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 1, 2026.Confirmedderived
21 active generation interconnection requests in Bexar County: Storage 4,771 MW, Solar 152 MW, Gas 35 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 138 kV line | Transmission line | 0.18 km | 138 kV | [1] |
| 345 kV line | Transmission line | 1.96 km | 345 kV | [1] |
| Leon Creek · City of San Antonio - (TX) | Power plant (Natural Gas) | 23.2 km | 184 MW | [6] |
| Oci Alamo Solar I Hybrid · OCI Energy LLC | Power plant (Solar) | 38.4 km | 41 MW | [6] |
| Blue Wing Solar Energy Generation · Duke Energy Renewables Services | Power plant (Solar) | 41 km | 14 MW | [6] |
| Arthur Von Rosenberg · City of San Antonio - (TX) | Power plant (Natural Gas) | 44.4 km | 518 MW | [6] |
| V H Braunig · City of San Antonio - (TX) | Power plant (Natural Gas) | 44.6 km | 1.05 GW | [6] |
| O W Sommers · City of San Antonio - (TX) | Power plant (Natural Gas) | 48 km | 830 MW | [6] |
| J K Spruce · City of San Antonio - (TX) | Power plant (Coal) | 48.3 km | 1.35 GW | [6] |
| Oci Alamo 4, LLC · Consolidated Edison Development Inc. | Power plant (Solar) | 49.2 km | 40 MW | [6] |
| Rafter Substation · CPS Energy | Substation | 0.41 km | 138 kV | [1] |
| CPS Energy substation · CPS Energy | Substation | 1.31 km | 138 kV | [1] |
| Texas Research Substation · CPS Energy | Substation | 1.48 km | 138 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Howard Road BESSERCOT 29INR0173 · Project Fast Flow LLC | Storage | In study · proposed 2028-04 | 618 MW | [4] |
| Orbit Energy StorageERCOT 27INR0082 · GCI Orbit Energy Storage, LLC | Storage | In study · proposed 2027-06 | 502 MW | [4] |
| Bernice Energy StorageERCOT 27INR0294 · Bernice Energy Storage LLC | Storage | In study · proposed 2029-02 | 403 MW | [4] |
| Mission Station Energy Storage IERCOT 28INR0474 · Mission Station LLC | Storage | In study · proposed 2030-05 | 375 MW | [4] |
| Mission Station Energy Storage IIERCOT 28INR0475 · Mission Station LLC | Storage | In study · proposed 2030-05 | 375 MW | [4] |
| Quela BESSERCOT 22INR0423 · BRP Quela BESS LLC | Storage | In study · proposed 2027-12 | 301 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 152,100 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
7- Microsoft SAT40Operating
- Microsoft Texas Research Park CampusOperating
- Microsoft TRP2Operating · 170,400 sq ft footprint
- Microsoft TRP1Operating · 178,100 sq ft footprint
- Microsoft TRP3 (SAT46)Operating · 229,700 sq ft footprint
- MicrosoftOperating · 229,700 sq ft footprint
- MicrosoftOperating · 229,700 sq ft footprint
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Microsoftway/1533350872 name=Microsoft | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-10-12 | Shown |
| Operator | Microsoftoperator=Microsoft | [1] | Likely | 2026-10-12 | Shown |
| Utility | Pedernales Electric Coop, INCterritory 14626: PEDERNALES ELECTRIC COOP, INC (COOPERATIVE, PEDERNALES ELECTRIC | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | ERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC. | [3] derived | Likely | — | Shown |
| Balancing authority | ERCO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Rafter Substation (138 kV)way/639176169 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 4.96 GW | [4] derived | Confirmed | 2026-10-01 | Shown |
| State avg. industrial price | 7.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 8.47¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 4.1 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 152,100 sq ft | [1] derived | Likely | 2026-10-12 | Shown |