Northern Virginia
Market boundary: facilities within 45 km of the metro center (editorial definition).
Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Percentages under each total show how much of it is backed by each evidence level.
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedConstruction pipeline by expected completion
MW from phases with a projected completion date
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
How to read this
Each bar sums one kind of evidence across facilities. Announced is the largest MW a company, utility, government or press source reported. Interconnection requests are MW in active large-load queue requests. Of the grid operators we ingest, only NYISO publishes these project by project. Contracted / approved means an executed interconnection agreement or a reported utility or power contract. Under construction and Operational come from construction records, imagery or operator reports.
The gap between announced and documented MW is capacity that has been claimed but not yet backed by a grid, construction or operating record. It is not proof a project won't happen. On-site generation is listed separately and never added to grid capacity. Method
Time to power puts each site's pending MW (announced minus operational) into a bucket by the midpoint of its evidence-based window. The window starts at the furthest documented stage and adds editorial ranges for what remains (e.g. announced: 2–5 yrs; land acquired: 2–4.5 yrs; planning / zoning: 1.75–4 yrs). Insufficient evidence means no dated stage evidence, not a delay. Windows are ranges, not forecasts. All ranges and rules
- Announced886 MW
- Interconnection requests—
- Contracted / approved—
- Under construction369 MW
- Operational6.16 GW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Interconnection queues
Active requests to connect to the grid (PJM). Requests are applications, not commitments.
How to read this
A queue request asks a grid operator (ISO/RTO) to connect a new generator or large load to the transmission system. It then moves through studies (feasibility, system impact, facilities) before an interconnection agreement, construction and service. Filing is an application, not a commitment to build. Generation totals here are active requests only.
Why most aren't built: in the queue files we ingest, PJM: 34% of 110 requests withdrawn, 19% in service. These are shares of each published file, not completion rates. Queue sources
Data-center load requests are shown only where an ISO publishes them project by project (NYISO). Elsewhere, large loads go through utilities, and the ISO figures above (e.g. ERCOT's large-load tracking) are quoted from the operator's own documents.
Coverage
How much of this scope our sources describe. Low coverage means data isn't disclosed or not yet collected, not that there's nothing there.
Confirmed evidence = at least one fact about the facility itself from a filing, deed, permit, interconnection record, or government or utility record. Regional context (state prices, nearby plants, utility territory maps) doesn't count. Most facilities come from OpenStreetMap, which records that a building exists but rarely its power, owner or status.
Largest operators & owners
Online + pipeline MW at linked facilities
- Amazon Web Services1.3 GW + 0 MW · 142 sites
- Digital Realty1.22 GW + 0 MW · 39 sites
- CloudHQ558 MW + 0 MW · 12 sites
- CyrusOne387 MW + 0 MW · 7 sites
- Vantage Data Centers287 MW + 0 MW · 8 sites
- Google286 MW + 0 MW · 10 sites
- QTS Data Centers249 MW + 0 MW · 12 sites
- COPT74 MW + 0 MW · 3 sites
- GI Partners66 MW + 0 MW · 1 sites
- Cologix51 MW + 0 MW · 2 sites
- H5 Data Centers0 MW + 42 MW · 1 sites
- STACK Infrastructure37 MW + 0 MW · 4 sites
Largest customers & end users
Tenants and workload owners, where sourced
- Google DeepMind286 MW + 0 MW · 1 sites
Utility exposure
Most likely retail utility by location (approximate)
- Dominion Energy4.52 GW + 411 MW · 426 sites
- Potomac Electric Power CO— · 2 sites
Grid operators (ISO / RTO)
By facility location
- PJM4.53 GW + 411 MW · 430 sites
Largest facilities
By online + pipeline MW; badge = evidence behind each figure
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| STACK Infrastructure NVA02 | Operating + expandingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 118 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 369 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Google Bristow | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 286 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
| CloudHQ LC1 | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 264 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
| CyrusOne NVA5 | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 194 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
| Digital Realty IAD39 | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 192 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
| CloudHQ LC2 | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 162 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
| Digital Realty IAD41 | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 135 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
| CloudHQ LC3 | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 132 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
| Vantage VA13 | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 91 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
| Vantage VA14 | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 91 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
| Digital Realty IAD42 | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 90 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
| Digital Realty IAD43 | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 90 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
| CyrusOne NVA1/NVA2/NVA3 | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 85 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
| QTS Ashburn 3 DC1 | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 80 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
| QTS Ashburn 3 DC2 | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 80 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
Facilities by status
- Operating291
- Operating + expanding1
- Under construction68
- Planned74
Campuses & sites (150)
Campus pages list their buildings
- STACK Infrastructure NVA02118 MW online EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. · 369 MW pipeline EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Google Bristow286 MW online EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Sentinel Cloud Plaza66 MW online EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Amazon IAD-16165 MW online EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Digital Realty IAD5560 MW online EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- H5 Ashburn · 42 MW pipeline AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.
- STACK NVA01A37 MW online EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- CyrusOne NVA424 MW online EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- VeriSign Incorporated8 MW online EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Centersquare IAD32 MW online EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- 8100 Boone Boulevardsite
- Aligned IAD-03building
- Amazon DCA-64building
- Amazon IAD-180building
- Amazon IAD-500building
- Arcola Tech Parkbuilding
- Beaumeade data center sitesite
- Beaumeade data center sitesite
- Belmont Innovation Station data center sitesite
- Compass IAD IEbuilding
- CoreSite DC1site
- CyrusOne NVA14building
- Data center parcel 088209173000site
- Data center parcel 113162785000site
- DataBank IAD2building
- Digital Loudoun Plazabuilding
- Digital Loudoun Plazabuilding
- Digital Realty IAD30building
- Digital Realty VA3building
- Digital Realty VA4building
- Dulles 28 Technology Park data center sitesite
- EdgeCore AS01building
- EdgeCore AS02building
- Equinix DC13building
- Equinix DC14building
- Equinix DC14building
- Equinix DC7building
- Equinix DC97building
- Evocative IAD1building
- Google Arcolacampus
- Google Leesburg Building 3building
- H5 IAD31building
- H5 IAD32building
- Inova Health System Plan data center sitesite
- Lincoln Rackhouse Marylandbuilding
- Loudoun Metro data center sitesite
- Lumen Ashburnbuilding
- Menlo Digital MD-DC1building
- Microsoft Leesburg Building 3building
- Microsoft Leesburg Building 4building
- Microsoft Leesburg Building 5building
- NTT VA10building
- OVH US East Vint Hillbuilding
- PowerHouse Pacific Building 1building
- PowerHouse Pacific Building 2building
- PowerHouse Pacific Building 3building
- Proposed data center — Amazon Data Servicessite
- Proposed data center — Ashburn Village Office Parksite
- Proposed data center — Beaumeadesite
- Proposed data center — Beaumeadesite
- Proposed data center — Beaumeadesite
- Proposed data center — Belmontsite
- Proposed data center — Bg Southsite
- Proposed data center — Brambleton Active Adultsite
- Proposed data center — Broad Run Business Centersite
- Proposed data center — Broadlandssite
- Proposed data center — Cardinal Industrial Parksite
- Proposed data center — Catapult Venturessite
- Proposed data center — Commonwealth Centersite
- Proposed data center — Concorde Industrial Parksite
- Proposed data center — Crosstrail Industrl Land Condosite
- Proposed data center — Digital Dulles Land Condosite
- Proposed data center — Downs Parksite
- Proposed data center — Dulles Parkway Centersite
- Proposed data center — Dulles Trade Center 2site
- Proposed data center — EPLAN-2023-0115site
- Proposed data center — EPLAN-2023-0119site
- Proposed data center — EPLAN-2023-0122site
- Proposed data center — EPLAN-2024-0058site
- Proposed data center — EPLAN-2024-0163site
- Proposed data center — EPLAN-2024-0205site
- Proposed data center — EPLAN-2025-0126site
- Proposed data center — EPLAN-2025-0195site
- Proposed data center — Evergreen Meadowssite
- Proposed data center — Evergreen Meadowssite
- Proposed data center — Evergreen Meadowssite
- Proposed data center — Farah Naplessite
- Proposed data center — Firefoxsite
- Proposed data center — Gateway Northsite
- Proposed data center — Gateway Northsite
- Proposed data center — Haynes Waiversite
- Proposed data center — Holiday Centersite
- Proposed data center — Inova Health System Foundationsite
- Proposed data center — LEGI-2023-0064site
- Proposed data center — LEGI-2024-0037site
- Proposed data center — LEGI-2024-0039site
- Proposed data center — Loudoun Business Parksite
- Proposed data center — Loudoun Tech Centersite
- Proposed data center — Loudoun Tech Centersite
- Proposed data center — Loudoun Tech Centersite
- Proposed data center — Loudoun Tech Center H1site
- Proposed data center — Luck Stone Corporationsite
- Proposed data center — Mci/No Va Campussite
- Proposed data center — Mercure Business Parksite
- Proposed data center — Mercure Business Parksite
- Proposed data center — Mercure Business Parksite
- Proposed data center — Mercure Business Parksite
- Proposed data center — Mercure Business Parksite
- Proposed data center — Mid Dulles Centersite
- Proposed data center — Na Dulles Real Estatesite
- Proposed data center — Paragonparksite
- Proposed data center — Philips Electronics Na Corpsite
- Proposed data center — Prologis Exchangesite
- Proposed data center — Prologis Park Gatewaysite
- Proposed data center — Quantum Parksite
- Proposed data center — Spring Valley Farmssite
- Proposed data center — Steeplechasesite
- Proposed data center — Sterling Business Parksite
- Proposed data center — Sterling Park Ipsite
- Proposed data center — STMP-2022-0018site
- Proposed data center — STPL-2018-0019site
- Proposed data center — STPL-2022-0040site
- Proposed data center — TLREZN2024-0003site
- Proposed data center — Tuscarora Crossing Lb1 Ph1site
- Proposed data center — Tuscarora Crossing Southsite
- Proposed data center — Uss Industrial Parksite
- STACK NVA05Abuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data center — 20481 Goose Landing Lanebuilding
- Unnamed data center — 4120 Lafayette Center Drivebuilding
- Unnamed data center — 4227 Lafayette Center Drivebuilding
- Unnamed data center — 7777 Infantry Ridge Roadbuilding
- Unnamed data center — 8100 Boone Boulevardbuilding
- Unnamed data center — Redskin Drivebuilding
- Unnamed data center — Redskin Drivebuilding
- Vantage VA3building
- Visa Operations Center Eastbuilding
- Yondr Allegro Southbuilding