DC
/

H5 Data Centers

What changed

Colocation provider · also matched as H5

H5 Data Centers is linked to 7 tracked US data centers in 7 states as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 0 MW online and 42 MW in the pipeline (floors: 2 of 7 report power). Every relationship cites its source.

Includes 1 related entity matched by name (e.g. property-holding LLCs), not verified
View on map →
Follow

Get changes to H5 Data Centers

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “H5 Data Centers: US data center footprint.” /companies/h5. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_h5_2026,
  title = {{H5 Data Centers: US data center footprint}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/companies/h5}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Linked facilities
7
States
7
Reported power online (floor)
—
Reported planned capacity (floor)
68 MW
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.100%
This company's facilities:Download CSVJSONAPI docs

Floors, not totals: power sums only facilities with a reported or estimated figure (2 of 7), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.

Loading map…

US footprint by state

Relationship graph

Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.

Powered by

Occupies property owned by

FacilityRoleLocationStatusPower
H5 AshburnOperator LikelyAshburn, VAUnder construction42 MW planned AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.
H5 PhoenixOperator, Property owner of record via H5 Data Centers Chandler LLCLikelyChandler, AZOperating26 MW planned AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.
H5 Data Centers San AntonioOperator LikelySan Antonio, TXOperating—
H5 DC - PortlandOperator LikelyPortland, OROperating—
H5 MinneapolisOperator LikelySaint Paul, MNOperating—
H5 SecaucusOperator LikelyNJOperating—
The Seattle TimesOperator LikelySeattle, WAOperating—