DC
/

Amazon DCA-64

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.HyperscaleBuildingSpringfield, Fairfax County, Virginia

Amazon DCA-64 is an operating hyperscale in Springfield, Virginia. Operated or owned by Amazon Web Services. Power capacity has not been disclosed or collected yet. Verification: verified operating. 8 cited sources.

30% profile completeness
22 claims from 9 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Amazon DCA-64

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Amazon DCA-64.” /facilities/amazon-dca-64-springfield-va. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_amazon_dca_64_springfield_va_2026,
  title = {{Amazon DCA-64}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/amazon-dca-64-springfield-va}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
122,000 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
High confidence
Project verification
Verified operating
Operation documented by government record.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Dominion Energy · PJM
Substation: Franconia Substation (230 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredOct 27, 2008
    Government record
    • Oct 27, 2008 · Land acquisition / deed recorded[7]
    • Oct 27, 2008 · Deed/transfer recorded for parcel 0992 01 0008A (no sale price disclosed).[7]
    • Mar 1, 2012 · Deed/transfer recorded for parcel 0992 01 0008A: $6,250,000.[7]
    • Feb 22, 2021 · Deed/transfer recorded for parcel 0992 01 0008A: $28,000,000.[7]
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map · Government record
    • Oct 12, 2026 · Reported status: operating[1]
    • Oct 12, 2026 · County land use: Land use code 190[7]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Community map.

Grid path

  1. facility
    Amazon DCA-64
  2. substation
    Franconia Substation (230 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.73 km away. Proximity does not establish that it serves the site.
  3. transmission
    230 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.14 km away). Not confirmed as the supply path.
  4. utility
    Dominion Energy[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits1

  • Air permit VA0000005105974272[8]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
    80% Synthetic Minor Emissions · Operating · No Violation Identified · Programs: State Implementation Plan

    ECHO lists “AMAZON DATA SERVICES INC - DCA-64” at 7961 LOISDALE ROAD, SPRINGFIELD, 171 m from this facility's mapped location (matched by location; the permit name matches this facility or its companies).

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates1

  • GS-5 rate class for customers demanding 25 MW or more[9]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 25, 2025.Nov 25, 2025
    Dominion Energy · Virginia State Corporation Commission · Docket PUR-2025-00058 · Final order issued · effective Jan 1, 2027

    “the new GS-5 rate class will comprise customers demanding 25 megawatts or more. The new rate class will be effective beginning January 1, 2027.”

    Applies to Dominion Energy Virginia's service territory; the facility's utility is the most likely retail provider by location unless a source names it.

Location & imagery

Mapped outline
Coordinates
38.74198, -77.18617
Address
7951;7961 Loisdale Road, Springfield, VA 22150[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Fairfax County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Franconia Substation (230 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.7 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.07¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Virginia statewide average, July 2026.

State avg. commercial price
11.68¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Virginia statewide average, July 2026.

Generation within 50 km
5.43 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

80 EIA-reported plants within 50 km.

Generation queued in county
348 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

3 active generation interconnection requests in Fairfax County: Storage 250 MW, Other 98 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
230 kV lineTransmission line0.14 km230 kV[1]
230kV transmission lineTransmission line0.96 km230 kV[1]
Covanta Fairfax Energy · Covanta Fairfax IncPower plant (Biomass)7.1 km98 MW[6]
Possum Point · Virginia Electric & Power CoPower plant (Natural Gas)24.3 km645 MW[6]
Brandywine Power Facility · KMC Thermo, LLCPower plant (Natural Gas)28.8 km230 MW[6]
Keys Energy Center · PSEG Keys Energy Center, LLCPower plant (Natural Gas)31.5 km763 MW[6]
Cpv St Charles Energy Center · CPV Maryland LLCPower plant (Natural Gas)32 km732 MW[6]
Morgantown Generating Plant · Lanyard Power Holdings, LLCPower plant (Petroleum)46.3 km108 MW[6]
Potomac Energy Center, LLC · Potomac Energy Center LLCPower plant (Natural Gas)46.9 km766 MW[6]
Chalk Point Power · Chalk Point Power, LLCPower plant (Natural Gas)48.7 km1.61 GW[6]
Franconia SubstationSubstation0.73 km230 kV[1]
Unnamed substationSubstation0.87 km230 kV[1]
Unnamed substationSubstation1.15 km—[1]
Largest queued generation in this countyFuelQueue statusMWSource
Clifton 230 kVPJM AG2-286StorageIn study · proposed 2023-12150 MW[4]
Reston 230 kVPJM AG2-326StorageIn study · proposed 2023-12100 MW[4]
Occoquan 230kVPJM AH1-197OtherIn study · proposed 2021-0898 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    Oct 27, 2008[7]
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year
  • $290.4M[7]
    Assessed value · tax year 2026 · parcel 0992 01 0008A
  • $70.4M[7]
    Assessed value — land · tax year 2026 · parcel 0992 01 0008A
  • $220.1M[7]
    Assessed value — improvements · tax year 2026 · parcel 0992 01 0008A
  • $73.2M[7]
    Assessed value · tax year 2025 · parcel 0992 01 0008A
Recorded transactions
Sale prices from recorded deeds
  • $28M[7]
    Recorded sale (price reflects anticipated rezoning) · Feb 22, 2021 · parcel 0992 01 0008A
  • $6.3M[7]
    Recorded sale (valid and verified multi-parcel sale) · Mar 1, 2012 · parcel 0992 01 0008A
Model estimates
Our model — not an appraisal

None sourced yet

ParcelRecord ownerAcresZoning / useBuilding sq ftSource
0992 01 0008A
Fairfax County, VA
——Land use code 190—[7]
Land use
Land use code 190[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Annual property tax
Not yet sourced
Nearby comparable transactions

Size

Building footprint
122,000 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Parcel / land records
0992 01 0008A (Fairfax County)[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

  1. Oct 27, 2008[7]

    Deed/transfer recorded for parcel 0992 01 0008A (no sale price disclosed).

  2. Mar 1, 2012[7]

    Deed/transfer recorded for parcel 0992 01 0008A: $6,250,000.

  3. Feb 22, 2021[7]

    Deed/transfer recorded for parcel 0992 01 0008A: $28,000,000.

  4. Apr 14, 2023[7]

    Deed/transfer recorded for parcel 0992 01 0008A (no sale price disclosed).

  5. Apr 14, 2023[7]

    Deed/transfer recorded for parcel 0992 01 0008A (no sale price disclosed).

All claims (provenance audit)

22
FieldValueSourceConfidenceAs ofStatus
NameAmazon DCA-64way/1536981894 name=Amazon DCA-64[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Facility typeHyperscale[1] derivedUnverified2026-10-12Shown
Address7951;7961 Loisdale Road, Springfield, VA 22150[1] Likely2026-10-12Shown
OperatorAmazon Web Servicesoperator=Amazon Web Services[1] Likely2026-10-12Shown
UtilityDominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE[2] derivedLikely2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Nearest mapped substationFranconia Substation (230 kV)way/232289062[1] derivedLikely2026-09-28Shown
Distance to substation0.7 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby230 kV[1] derivedLikely2026-09-28Shown
Generation queued in county348 MW[4] derivedConfirmed2026-10-12Shown
State avg. industrial price10.07¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price11.68¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km5.43 GW[6] derivedConfirmed202502Shown
Building footprint122,000 sq ft[1] derivedLikely2026-10-12Shown
Parcel / land records0992 01 0008A (Fairfax County)[7] Confirmed2026-10-12Shown
Assessed value (official)$290.4M[7] Confirmed2026Shown
Last recorded sale price$28M[7] Confirmed2021-02-22Shown
Last recorded sale dateFeb 22, 2021[7] Confirmed2021-02-22Shown
Land useLand use code 190[7] Confirmed2026-10-12Shown
Land acquiredOct 27, 2008[7] derivedConfirmed2026-10-12Shown