DC
/

Google Arcola

Under constructionEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.AI campusCampusSterling, Loudoun County, Virginia

Google Arcola is an under construction ai campus in Sterling, Virginia. Operated or owned by Google. Current power: 93 MW (estimated). Verification: verified operating. 10 cited sources.

70% profile completeness
44 claims from 11 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Google Arcola

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Google Arcola.” /facilities/google-arcola-sterling-va. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_google_arcola_sterling_va_2026,
  title = {{Google Arcola}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/google-arcola-sterling-va}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
93 MW[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyestimated
Planned capacity
Not yet sourced
Floor area
923,500 sq ft[2]
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Buildings (planned)
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyderived
Capital cost / investment
$2.9B[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyestimated
First operational
Jun 16, 2026[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyderived

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
High confidence
Project verification
Verified operating
Operation documented by satellite imagery.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Dominion Energy · PJM
Substation: On-site substation

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
93 MW[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Estimated from buildings observed operational
  • ⚠ No public interconnection record for this load — PJM does not publish large-load requests.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. PermittingOct 12, 2026
    Permit / site plan
    • Oct 12, 2026 · Permit / case B10275570200[2]
    • Oct 12, 2026 · Permit / case B10275570100[2]
    • Oct 12, 2026 · Permit / case BLDC-2024-008914[2]
    • Oct 12, 2026 · Permit / case B10376230100[2]
    • Oct 12, 2026 · Permit / case B80240720100[2]
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionOct 1, 2024
    Model estimate · Satellite imagery · Permit / site plan
    • Oct 1, 2024 · Reported status: under construction[1]
    • Oct 1, 2024 · Construction start[1]
    • Oct 1, 2024 · Building 1 foundation started[1]
    • Oct 12, 2026 · Reported status: under construction[2]
  3. EnergizationJun 16, 2026
    Satellite imagery
    • Jun 16, 2026 · Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.[1]
  4. OperationalJun 16, 2026
    Satellite imagery
    • Jun 16, 2026 · Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Permit / site plan, Model estimate, Satellite imagery.

Grid path

  1. facility
    Google Arcola
  2. substation
    On-site substation[1][6]
    Satellite imageryLikely
    1 substation outline traced inside the campus on satellite imagery; OSM maps Unnamed substation 0.37 km away
  3. transmission
    500 kV line[6]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.68 km away). Not confirmed as the supply path.
  4. utility
    Dominion Energy[3]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[5]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling1

  • Evaporative (cooling towers)[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Jun 16, 2026cooling

    “Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.”

    Named in Epoch AI's satellite-imagery notes for this date.

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates1

  • GS-5 rate class for customers demanding 25 MW or more[11]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 25, 2025.Nov 25, 2025
    Dominion Energy · Virginia State Corporation Commission · Docket PUR-2025-00058 · Final order issued · effective Jan 1, 2027

    “the new GS-5 rate class will comprise customers demanding 25 megawatts or more. The new rate class will be effective beginning January 1, 2027.”

    Applies to Dominion Energy Virginia's service territory; the facility's utility is the most likely retail provider by location unless a source names it.

Location & imagery

Mapped outline
Coordinates
38.94172, -77.53189
Address
42575 Arcola Blvd, Sterling, VA 20166[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likely
County
Loudoun County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Property owner of record
Owner
Google[1]Confirmed
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
93 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyestimated

Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.

Current IT capacity
77 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyestimated

Estimated IT load currently online, based on buildings observed operational.

Estimated annual consumption
570 GWh/yr[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated

93 MW × 8,760 h × 70% utilization.

Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (230 kV)[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.4 km[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
500 kV[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.07¢/kWh[8]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Virginia statewide average, July 2026.

State avg. commercial price
11.68¢/kWh[8]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Virginia statewide average, July 2026.

Generation within 50 km
2.19 GW[9]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

47 EIA-reported plants within 50 km.

Generation queued in county
1.04 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

11 active generation interconnection requests in Loudoun County: Storage 940 MW, Solar 100 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
230 kV line · Virginia Electric & Power CompanyTransmission line0.55 km230 kV[6]
2172;2209 · Virginia Electric & Power CompanyTransmission line0.62 km230 kV[6]
2137;2183 · Dominion EnergyTransmission line1.11 km230 kV[6]
2213;2172 · Virginia Electric & Power CompanyTransmission line1.41 km230 kV[6]
500 kV lineTransmission line1.68 km500 kV[6]
Mosby - Brambleton · Virginia Electric & Power CompanyTransmission line1.74 km500 kV[6]
Potomac Energy Center, LLC · Potomac Energy Center LLCPower plant (Natural Gas)13 km766 MW[9]
Montgomery County Resource Recovery · Covanta Montgomery, Inc.Power plant (Biomass)29.5 km54 MW[9]
Dickerson Power · Dickerson Power, LLCPower plant (Natural Gas)30.4 km299 MW[9]
Covanta Fairfax Energy · Covanta Fairfax IncPower plant (Biomass)37.2 km98 MW[9]
Covanta Alexandria/Arlington Energy · Covanta Alexandria/ArlingtonPower plant (Biomass)38.2 km29 MW[9]
Blake Solar Plant · Horus West Virginia 1, LLCPower plant (Solar)44.2 km80 MW[9]
Central Utility Plant At White Oak · GSA Metropolitan Service CenterPower plant (Natural Gas)48.7 km54 MW[9]
Remington · Virginia Electric & Power CoPower plant (Natural Gas)48.8 km604 MW[9]
Unnamed substationSubstation0.37 km230 kV[6]
Evergreen Mills Switching Station · Virginia Electric & Power CompanySubstation0.54 km230 kV[6]
Yardley Ridge Substation · NOVECSubstation1.43 km230 kV[6]
Yardley Ridge Substation · Virginia Electric & Power CompanySubstation1.5 km230 kV[6]
Unnamed substationSubstation1.72 km230 kV[6]
Racefield SubstationSubstation1.74 km230 kV[6]
Largest queued generation in this countyFuelQueue statusMWSource
Loudoun 230 kVPJM AG2-285StorageIn study · proposed 2023-12150 MW[7]
Beaumeade 230 kVPJM AG2-287StorageIn study · proposed 2023-12150 MW[7]
New Road StoragePJM AE2-019StorageIA signed · proposed 2026-12120 MW[7]
Dulles SolarPJM AF1-147SolarIA signed · proposed 2023-12100 MW[7]
Roundtable 230 kVPJM AG2-307StorageIn study · proposed 2023-12100 MW[7]
Shelhorn 230 kVPJM AG2-323StorageIn study · proposed 2023-12100 MW[7]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    Oct 1, 2024[1]
  5. First operational
    Jun 16, 2026[1]
  6. Expected completion
    —
Permit / case numbers
B10275570200, B10275570100, BLDC-2024-008914, B10376230100, B80240720100[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Buildings (planned)
1[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyderived

Count of building outlines traced on satellite imagery.

Buildings operational
1[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyestimated
PhaseStatusAdded MWCompleted / expectedSource
Building 1operational93 MWJun 16, 2026[1]

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

ParcelRecord ownerAcresZoning / useBuilding sq ftSource
162176713000
Loudoun County, VA
WHEELER SURVEY COMPANY LLC
Project: Arcola Center
135.31IP (ZMAP-2016-0013) · Data Center923,505
built/under construction
[2]
Site area
135.3 acres[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed

Legal acreage of the parcel(s).

Zoning
IP[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Land use
Data Center[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Capital cost / investment
$2.9B[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyestimated

Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.

Annual property tax
Not yet sourced

Size

Floor area
923,500 sq ft[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed

Building area on the county's data-center parcel inventory (from building permits).

Parcel / land records
MCPI 162176713000 (Loudoun County)[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed

Compute

Chip types
TPU v6e, TPU v7[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Confirmed
Compute (H100-equivalents)
108,100[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jun 16, 2026.Likelyestimated

What changed (last 3 years)

Follow this facility (RSS)
  • Buildings operational
    0Oct 1, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→1Jun 16, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
  • Status
    Under constructionOct 1, 2024[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→OperatingJun 16, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→Under constructionSep 27, 2026[2]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.

Timeline

Construction start: Oct 1, 2024[1]
First operational: Jun 16, 2026[1]
  1. Oct 1, 2024[1]

    Building 1 foundation started

  2. Sep 8, 2025[1]

    Building 1 roof complete, cooling towers in progress.

  3. Apr 9, 2026[1]

    Building 1 appears almost complete, with minimal construction activity.

  4. Jun 16, 202693 MW facility power· 1 buildings operational[1]

    Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.

Buildings on this campus

5

All claims (provenance audit)

44
FieldValueSourceConfidenceAs ofStatus
NameGoogle Arcola[1] Likely2026-06-16Shown
StatusUnder construction[1] derivedLikely2024-10-01Superseded / alternative
StatusUnder construction[1] derivedLikely2025-09-08Superseded / alternative
StatusUnder construction[1] derivedLikely2026-04-09Superseded / alternative
StatusOperating[1] derivedLikely2026-06-16Superseded / alternative
StatusUnder construction[2] derivedConfirmed2026-10-12Shown
Facility typeAI campus[1] derivedLikely2026-06-16Shown
Address42575 Arcola Blvd, Sterling, VA 20166[1] Likely2026-06-16Shown
Property owner of recordWheeler Survey Company LLCMCPI 162176713000: WHEELER SURVEY COMPANY LLC[2] Confirmed2026-10-12Shown
OwnerGoogleOwner: Google[1] Confirmed2026-06-16Shown
UtilityDominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE[3] derivedLikely2022Shown
Current facility power93 MW[1] estimatedLikely2026-06-16Shown
Current IT capacity77 MW[1] estimatedLikely2026-06-16Shown
Estimated annual consumption570 GWh/yr[4] estimatedSpeculative2026-10-12Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[5] derivedLikely—Shown
Balancing authorityPJM[3] derivedLikely—Shown
Nearest mapped substationUnnamed substation (230 kV)way/1191470739[6] derivedLikely2026-09-28Shown
Distance to substation0.4 km[6] derivedLikely2026-09-28Shown
Highest-voltage line nearby500 kV[6] derivedLikely2026-09-28Shown
Generation queued in county1.04 GW[7] derivedConfirmed2026-10-12Shown
State avg. industrial price10.07¢/kWh[8] Confirmed2026-07Shown
State avg. commercial price11.68¢/kWh[8] Confirmed2026-07Shown
Generation within 50 km2.19 GW[9] derivedConfirmed202502Shown
Permit / case numbersB10275570200[2] Confirmed2026-10-12Shown
Permit / case numbersB10275570100[2] Confirmed2026-10-12Shown
Permit / case numbersBLDC-2024-008914[2] Confirmed2026-10-12Shown
Permit / case numbersB10376230100[2] Confirmed2026-10-12Shown
Permit / case numbersB80240720100[2] Confirmed2026-10-12Shown
Buildings (planned)1[1] derivedLikely2026-06-16Shown
Buildings operational1[1] estimatedLikely2026-06-16Shown
Buildings operational0[1] estimatedLikely2024-10-01Superseded / alternative
Buildings operational0[1] estimatedLikely2025-09-08Superseded / alternative
Buildings operational0[1] estimatedLikely2026-04-09Superseded / alternative
Floor area923,500 sq ft[2] Confirmed2026-10-12Shown
Site area135.3 acres[2] Confirmed2026-10-12Shown
Capital cost / investment$2.9B[1] estimatedLikely2026-06-16Shown
Parcel / land recordsMCPI 162176713000 (Loudoun County)[2] Confirmed2026-10-12Shown
ZoningIP[2] Confirmed2026-10-12Shown
Land useData Center[2] Confirmed2026-10-12Shown
Compute (H100-equivalents)108,100[1] estimatedLikely2026-06-16Shown
Chip typesTPU v6e[1] Confirmed2026-06-16Shown
Chip typesTPU v7[1] Confirmed2026-06-16Shown
Construction startOct 1, 2024[1] derivedLikely2026-06-16Shown
First operationalJun 16, 2026[1] derivedLikely2026-06-16Shown