Proposed data center — EPLAN-2025-0195
Proposed data center — EPLAN-2025-0195 is a planned data center in Virginia. Power capacity has not been disclosed or collected yet. Verification: documented development. 7 cited sources.
Follow
Get changes to Proposed data center — EPLAN-2025-0195
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Proposed data center — EPLAN-2025-0195.” /facilities/proposed-data-center-eplan-2025-0195-loudoun-county-va. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_proposed_data_center_eplan_2025_0195_lou_2026,
title = {{Proposed data center — EPLAN-2025-0195}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/proposed-data-center-eplan-2025-0195-loudoun-county-va}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
- ⚠ No public interconnection record for this load — PJM does not publish large-load requests.
- ⚠ No recorded land acquisition found.
How the time-to-power window was estimated
- Current stage: Permitting (furthest stage with documented evidence)[1]
- No public grid record: No interconnection request or utility contract found; adds uncertainty to the upper bound.
- From “Permitting”, large loads have typically taken 1.5–4 more years to first power (editorial range; see Methodology).
- The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Permitting2023
Permit / site plan
- 2023 · Loudoun County site plan LEGI-2023-0048 — Approved, 67,840 sq ft proposed.[1]
- 2025 · Permit date[1]
- 2025 · Loudoun County site plan EPLAN-2025-0195 — Active, 751,902 sq ft proposed.[1]
- Oct 12, 2026 · Site plan EPLAN-2025-0195: Active[1]
- Oct 12, 2026 · Permit / case EPLAN-2025-0195[1]
- Oct 12, 2026 · Site plan LEGI-2023-0048: Approved[1]
- Oct 12, 2026 · Permit / case LEGI-2023-0048[1]
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under construction
- Energization
- Operational
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Permit / site plan.
Grid path
- →facilityProposed data center — EPLAN-2025-0195
- →substationPleasant View Substation (230 kV)[4]Proximity onlyUnverifiedNearest mapped substation, 1.75 km away. Proximity does not establish that it serves the site.
- →transmission514 (500 kV)[4]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.75 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events2
- Permit / site plan filed[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of 2025.2025
Loudoun County site plan EPLAN-2025-0195 — Active, 751,902 sq ft proposed.
- Permit / site plan approved[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of 2023.2023
Loudoun County site plan LEGI-2023-0048 — Approved, 67,840 sq ft proposed.
Utility & rates1
- GS-5 rate class for customers demanding 25 MW or more[8]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 25, 2025.Nov 25, 2025Dominion Energy · Virginia State Corporation Commission · Docket PUR-2025-00058 · Final order issued · effective Jan 1, 2027
“the new GS-5 rate class will comprise customers demanding 25 megawatts or more. The new rate class will be effective beginning January 1, 2027.”
Applies to Dominion Energy Virginia's service territory; the facility's utility is the most likely retail provider by location unless a source names it.
Location & imagery
County parcel- Coordinates
- 39.07092, -77.50952
- County
- Loudoun County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- PJM[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Pleasant View Substation (230 kV)[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 1.8 km[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 500 kV[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 10.07¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Virginia statewide average, July 2026.
- State avg. commercial price
- 11.68¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Virginia statewide average, July 2026.
- Generation within 50 km
- 1.57 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
43 EIA-reported plants within 50 km.
- Generation queued in county
- 1.04 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
11 active generation interconnection requests in Loudoun County: Storage 940 MW, Solar 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 227;274 · Dominion Energy | Transmission line | 0.69 km | 230 kV | [4] |
| 203;2098 · Virginia Electric & Power Company | Transmission line | 1.72 km | 230 kV | [4] |
| 514 · Virginia Electric & Power Company | Transmission line | 1.75 km | 500 kV | [4] |
| 595 · Virginia Electric & Power Company | Transmission line | 1.84 km | 500 kV | [4] |
| 500 kV line · Dominion Energy | Transmission line | 1.84 km | 500 kV | [4] |
| Brambleton - Goose Creek · Virginia Electric & Power Company | Transmission line | 1.94 km | 500 kV | [4] |
| Potomac Energy Center, LLC · Potomac Energy Center LLC | Power plant (Natural Gas) | 3.4 km | 766 MW | [7] |
| Montgomery County Resource Recovery · Covanta Montgomery, Inc. | Power plant (Biomass) | 15.2 km | 54 MW | [7] |
| Dickerson Power · Dickerson Power, LLC | Power plant (Natural Gas) | 15.9 km | 299 MW | [7] |
| Blake Solar Plant · Horus West Virginia 1, LLC | Power plant (Solar) | 35.2 km | 80 MW | [7] |
| Nih Cogeneration Facility · National Institutes of Health | Power plant (Natural Gas) | 36.8 km | 28 MW | [7] |
| Covanta Alexandria/Arlington Energy · Covanta Alexandria/Arlington | Power plant (Biomass) | 44.5 km | 29 MW | [7] |
| Central Utility Plant At White Oak · GSA Metropolitan Service Center | Power plant (Natural Gas) | 45.6 km | 54 MW | [7] |
| Covanta Fairfax Energy · Covanta Fairfax Inc | Power plant (Biomass) | 47.8 km | 98 MW | [7] |
| Pleasant View Substation · Dominion Energy | Substation | 1.75 km | 230 kV | [4] |
| Pleasant View Substation · Dominion Energy | Substation | 1.86 km | 500 kV | [4] |
| Goose Creek Substation · Dominion Energy | Substation | 1.97 km | 500 kV | [4] |
| Ashburn Substation · Dominion Energy | Substation | 2.38 km | 230 kV | [4] |
| Cochran Mill Delivery Point | Substation | 2.71 km | 230 kV | [4] |
| Belmont Substation · Virginia Electric and Power Company | Substation | 2.99 km | 230 kV | [4] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Loudoun 230 kVPJM AG2-285 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| Beaumeade 230 kVPJM AG2-287 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| New Road StoragePJM AE2-019 | Storage | IA signed · proposed 2026-12 | 120 MW | [5] |
| Dulles SolarPJM AF1-147 | Solar | IA signed · proposed 2023-12 | 100 MW | [5] |
| Roundtable 230 kVPJM AG2-307 | Storage | In study · proposed 2023-12 | 100 MW | [5] |
| Shelhorn 230 kVPJM AG2-323 | Storage | In study · proposed 2023-12 | 100 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting2025[1]
- Construction start—
- First operational—
- Expected completion—
- Permitting status
- Site plan EPLAN-2025-0195: Active[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Permit / case numbers
- ZMAP-2022-0021, EPLAN-2025-0195, LEGI-2023-0048[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Planned floor area
- 751,900 sq ft[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Building area proposed in the site plan.
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Planned floor area
- 751,900 sq ft[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Building area proposed in the site plan.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)- Permitting statusSite plan EPLAN-2025-0195: ActiveSep 27, 2026[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.→Site plan LEGI-2023-0048: ApprovedSep 27, 2026[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.→Site plan EPLAN-2025-0195: ActiveOct 5, 2026[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.→Site plan LEGI-2023-0048: ApprovedOct 5, 2026[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.→Site plan EPLAN-2025-0195: ActiveOct 12, 2026[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.→Site plan LEGI-2023-0048: ApprovedOct 12, 2026[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
- Planned floor area751,900 sq ftSep 27, 2026[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.→67,800 sq ftSep 27, 2026[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.→751,900 sq ftOct 5, 2026[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.→67,800 sq ftOct 5, 2026[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.→751,900 sq ftOct 12, 2026[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.→67,800 sq ftOct 12, 2026[1]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
Timeline
All claims (provenance audit)
23| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Proposed data center — EPLAN-2025-0195 | [1] derived | Confirmed | 2026-10-12 | Shown |
| Status | Planned | [1] derived | Confirmed | 2026-10-12 | Shown |
| Status | Planned | [1] derived | Confirmed | 2026-10-12 | Superseded / alternative |
| Utility | Dominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Pleasant View Substation (230 kV)way/45842846 | [4] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.8 km | [4] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 500 kV | [4] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.04 GW | [5] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 10.07¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.57 GW | [7] derived | Confirmed | 202502 | Shown |
| Permitting status | Site plan EPLAN-2025-0195: ActiveApplication EPLAN-2025-0195, zoning case ZMAP-2022-0021 | [1] | Confirmed | 2026-10-12 | Shown |
| Permitting status | Site plan LEGI-2023-0048: ApprovedApplication LEGI-2023-0048, zoning case ZMAP-2022-0021 | [1] | Confirmed | 2026-10-12 | Superseded / alternative |
| Permit / case numbers | EPLAN-2025-0195 | [1] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | ZMAP-2022-0021 | [1] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | LEGI-2023-0048 | [1] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | ZMAP-2022-0021 | [1] | Confirmed | 2026-10-12 | Shown |
| Planned floor area | 751,900 sq ft | [1] | Confirmed | 2026-10-12 | Shown |
| Planned floor area | 67,800 sq ft | [1] | Confirmed | 2026-10-12 | Superseded / alternative |
| Permit / site plan filed | 2025 | [1] derived | Confirmed | 2026-10-12 | Shown |
| Permit / site plan filed | 2023 | [1] derived | Confirmed | 2026-10-12 | Superseded / alternative |