ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assigned
Data centers, sorted by Power online
FacilityLocationStatusOperator / ownerTenants / usersPower online ↓PlannedSizeUtility · ISOVerificationLast verified
Amazon IAD-117
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
50 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
426,700 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-116
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
50 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
426,700 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-118
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
50 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
685,700 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-146
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
50 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
214,400 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-129
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
50 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
685,700 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-147
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
50 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
203,500 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Anthropic Lake Mariner
AI campus
Barker, NY
Operating + expandingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jul 23, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
AI XPV PlatformShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
AnthropicShow sources
confidence: likely
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
49 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jul 23, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
441 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jul 23, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
Niagara Mohawk Power Corp.Show sources
confidence: unverified
NYISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
CyrusOne NVA8
Colocation
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
CyrusOneShow sources
confidence: likely
—
48 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
154,100 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
STACK NVA06
Colocation
VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
STACK InfrastructureShow sources
confidence: likely
—
48 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
621,000 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
Amazon IAD-13
Hyperscale
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web Services, Digital RealtyShow sources
confidence: likely
—
47 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
240,300 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Vantage TX1
AI campus
San Antonio, TX
Operating + expandingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Feb 15, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
——
45 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Feb 15, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
179 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Feb 15, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
310,200 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
Pedernales Electric Coop, INCShow sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-78
Hyperscale
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
45 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
447,200 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-79
Hyperscale
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
45 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
447,200 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Digital Realty ACC9
Colocation
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Digital RealtyShow sources
confidence: likely
—
45 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
362,100 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-90
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
45 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
437,200 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-91
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
45 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
437,200 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-92
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
45 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
437,200 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
QTS Ashburn 1 DC2
Colocation
Sterling, VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
QTS Data CentersShow sources
confidence: likely
—
43 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
189,900 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
EdgeCore AS02
Unclassified
Sterling, VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
EdgeCoreShow sources
confidence: likely
—
42 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
245,800 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
CoreWeave Dalton 1 & 2
AI campus
GA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Feb 20, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
CoreWeaveShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
40 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Feb 20, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
——
Georgia PowerShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-80
Hyperscale
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
40 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
447,200 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Digital Realty ACC10
Colocation
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Digital RealtyShow sources
confidence: likely
—
40 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
318,100 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-114
Hyperscale
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
40 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
147,600 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-115
Hyperscale
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
40 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
147,600 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-175
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
40 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
170,000 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-144
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
38 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
147,900 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
STACK NVA01A
Colocation
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
STACK InfrastructureShow sources
confidence: likely
—
37 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
17 MWAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.Show sources
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.confidence: likelyas of Sep 30, 2026

“17MW of Critical Capacity in Core Loudoun County..”

180,000 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-98
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web Services, COPTShow sources
confidence: likely
—
37 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
296,400 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-99
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web Services, COPTShow sources
confidence: likely
—
37 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
296,400 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
CyrusOne NVA7
Colocation
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
CyrusOneShow sources
confidence: likely
—
36 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
516,400 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
NTT VA3
Colocation
Ashburn, VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
NTT Global Data CentersShow sources
confidence: likely
—
33 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
1.09M sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
Amazon IAD-71
Hyperscale
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
33 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
321,300 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-60
Hyperscale
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
33 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
321,300 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-15
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
32 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
103,000 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-10
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
31 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
126,900 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Digital Realty ACC3
Colocation
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Digital RealtyShow sources
confidence: likely
—
30 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
288,000 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Digital Realty ACC2
Colocation
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Digital RealtyShow sources
confidence: likely
—
25 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
288,000 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
xAI QTS Atlanta
AI campus
Atlanta, GA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jul 10, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
SpaceXAI (xAI)Show sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
SpaceXAI (xAI)Show sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
24 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jul 10, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
418,400 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
Georgia PowerShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
CyrusOne NVA4
Colocation
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
CyrusOneShow sources
confidence: likely
—
24 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
128,500 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Digital Realty IAD12
Colocation
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Digital RealtyShow sources
confidence: likely
—
24 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
180,000 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Digital Realty Devin Shafron Building A
Colocation
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Digital RealtyShow sources
confidence: likely
—
24 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
133,600 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
STACK NVA06
Colocation
VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
STACK InfrastructureShow sources
confidence: likely
—
24 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
621,000 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
—Under constructionOct 12, 2026
Amazon IAD-16
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
22 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
75,800 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Digital Realty IAD24
Colocation
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Digital RealtyShow sources
confidence: likely
—
18 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
240,300 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
NTT VA2
Colocation
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
NTT Global Data CentersShow sources
confidence: likely
—
14 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
123,200 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
NTT VA1
Colocation
Ashburn, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
NTT Global Data CentersShow sources
confidence: likely
—
13 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
109,300 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
QTS Ashburn Moran
Colocation
VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
QTS Data Centers, Digital RealtyShow sources
confidence: likely
—
12 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
64,700 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Amazon IAD-32
Hyperscale
Sterling, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
—
10 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
36,000 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
VeriSign Incorporated
Unclassified
Dulles, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
——
8 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
136,900 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
—
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Centersquare IAD3
Colocation
Dulles, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
CentersquareShow sources
confidence: likely
—
2 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—
130,400 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Anthropic Barber Lake
AI campus
TX
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jul 30, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
Cipher MiningShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
AnthropicShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
300 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jul 30, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
Taylor Electric Coop INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
CoreWeave Lancaster Greenfield site
AI campus
PA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jul 13, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
CoreWeaveShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
——
124 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jul 13, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
PPL Electric UtilitiesShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
CoreWeave Muskogee OK
AI campus
Muskogee, OK
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jun 13, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
CoreWeaveShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
——
181 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jun 13, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
Oklahoma Gas & Electric COShow sources
confidence: unverified
SPPEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
Crusoe Abilene Expansion
AI campus
Abilene, TX
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jan 15, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
MicrosoftShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
MicrosoftShow sources
confidence: likely
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
941 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jan 15, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
Taylor Electric Coop INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
Goodnight
AI campus
Claude, TX
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Apr 16, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
———
1.29 GWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Apr 16, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
Southwestern Public Service COShow sources
confidence: unverified
SPPEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
Google Cedar Rapids
AI campus
IA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Apr 16, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
GoogleShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
——
314 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Apr 16, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
MidAmerican EnergyShow sources
confidence: unverified
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
Google Fort Wayne
AI campus
Fort Wayne, IN
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Aug 19, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
GoogleShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
——
1.04 GWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Aug 19, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
Indiana Michigan Power (AEP)Show sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
Meta Bowling Green
AI campus
Bowling Green, OH
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jul 30, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
MetaShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
MetaShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
570 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jul 30, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
The Toledo Edison COShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
Meta Hyperion
AI campus
LA
Operating + expandingAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.Show sources
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.confidence: likelyas of Jul 2026

“We’re expanding our AI-optimized data center in Richland Parish, Louisiana”

  • Meta · Deepening our investment in Richland Parish, Louisiana
MetaShow sources
confidence: confirmed

“5 GW in compute capacity — the largest in Meta's fleet”

“Meta’s data center representing a $10 billion in investment in Richland Parish.”

  • Epoch AI · AI data centers (Frontier Data Centers Hub)
  • Meta · Deepening our investment in Richland Parish, Louisiana
  • Entergy · Entergy Louisiana to power Meta’s data center in Richland Parish - Ent
MetaShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
5 GWAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.Show sources
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.confidence: confirmedas of Jul 13, 2026

“5 GW in compute capacity — the largest in Meta's fleet”

  • Meta · Deepening our investment in Richland Parish, Louisiana
4M sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Dec 6, 2024

“Once completed, it will be Meta’s largest data center at more than 4-million square feet.”

  • Entergy · Entergy Louisiana to power Meta’s data center in Richland Parish - Ent
EntergyShow sources
confidence: confirmed

“seven new natural gas-fueled generating plants, three grid-scale batteries”

“Entergy Louisiana is pleased to announce plans to invest in modern, efficient generation facilities and robust transmission infrastructure to support the region and Meta’s data center”

  • Epoch AI · AI data centers (Frontier Data Centers Hub)
  • Meta · Deepening our investment in Richland Parish, Louisiana
  • Entergy · Entergy Louisiana to power Meta’s data center in Richland Parish - Ent
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
OpenAI Stargate Lordstown
AI campus
Warren, OH
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jul 30, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
SoftBankShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
OpenAIShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
300 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jul 30, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
Ohio EdisonShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
OpenAI Stargate Michigan
AI campus
MI
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Mar 12, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
Oracle, Related DigitalShow sources
confidence: confirmed

“Related Digital, a vertically integrated data center development and investment platform, today announced plans to develop a data center campus”

  • Epoch AI · AI data centers (Frontier Data Centers Hub)
  • RELATED DIGITAL · Related Digital | Data Centers Done Right
OpenAIShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
1.4 GWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“$7 billion data center campus with 1,400 MW of capacity.”

“the Stargate project’s expected 1.4 gigawatts of demand is equivalent to that of a large American city.”

1.65M sq ftAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.Show sources
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.confidence: likelyas of Oct 30, 2025

“consists of three 550,000 square-feet single-story buildings.”

DTE ElectricShow sources
confidence: confirmed

“DTE Energy Open AI, Oracle, Related Digital / Data Center Saline Township, MI”

“special contracts to supply power for a Washtenaw County data center”

MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Grid-backedOct 12, 2026
OpenAI Stargate Milam
AI campus
TX
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Mar 23, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
SoftBankShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
OpenAIShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
1.2 GWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Mar 23, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
Bluebonnet Electric Coop, INCShow sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
OpenAI Stargate New Mexico
AI campus
NM
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jun 22, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
OracleShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
OpenAIShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
2.45 GWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jun 22, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
——
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
OpenAI Stargate Shackelford
AI campus
Abilene, TX
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 4, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
Oracle, Vantage Data CentersShow sources
confidence: confirmed

“Together with Frontier, a Texas campus in Shackelford County, Vantage is investing more than $40 billion in critical digital infrastructure, underscoring the company’s accelerating momentum to deliver high-density, next-generation digital i”

  • Epoch AI · AI data centers (Frontier Data Centers Hub)
  • Vantage Data Centers · OpenAI, Oracle and Vantage Data Centers Announce Stargate Data Center
OpenAIShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
1.96 GWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 4, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
Taylor Electric Coop INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
OpenAI Stargate Wisconsin
AI campus
WI
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Jul 24, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
Oracle, Vantage Data CentersShow sources
confidence: confirmed

“Vantage Data Centers, which was previously the only known company behind the project, had originally said it would spend $8 billion on the development.”

“OpenAI, Oracle and Vantage Data Centers, a leading global provider of hyperscale data center campuses, today announced plans to develop a data center campus outside Milwaukee in Port Washington, Wisconsin.”

  • Epoch AI · AI data centers (Frontier Data Centers Hub)
  • WPR · Port Washington data center campus will be $15B hub for OpenAI, Oracle
  • Vantage Data Centers · OpenAI, Oracle and Vantage Data Centers Announce Stargate Data Center
OpenAIShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
1.3 GWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“$15 billion, 1,300 MW data center campus as part of "Stargate" initiative.”

“The four data center buildings are expected to need 1.3 gigawatts of electricity.”

  • Epoch AI · AI data centers (Frontier Data Centers Hub)
  • Edison Electric Institute · Large Load Projects and Tariffs (September 2026)
  • WPR · Port Washington data center campus will be $15B hub for OpenAI, Oracle
—
We EnergiesShow sources
confidence: confirmed

“We Energies (WEC Energy Group) OpenAI, Oracle, Vantage Data Centers / Data Center Port Washington, WI”

“Vantage Data Centers is “underwriting 100 percent of the power infrastructure investment with a dedicated electricity rate from WEC Energy Group utility We Energies.””

  • Edison Electric Institute · Large Load Projects and Tariffs (September 2026)
  • WPR · Port Washington data center campus will be $15B hub for OpenAI, Oracle
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Grid-backedOct 12, 2026
QTS Cedar Rapids
AI campus
Fairfax, IA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of May 7, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
———
1.59 GWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of May 7, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
Alliant EnergyShow sources
confidence: confirmed
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
QTS Eagle Mountain
AI campus
Eagle Mountain, UT
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of May 2, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
———
411 MWEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of May 2, 2026
  • Epoch AI · AI data centers (Frontier Data Centers Hub)
—
PacifiCorpShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
CoreSite DC1
Colocation
DC
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
CoreSiteShow sources
confidence: likely
————
Potomac Electric Power COShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Southwest Cyberport
Unclassified
Albuquerque, NM
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Public Service CO of NmShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
SDSU Computer Room
Unclassified
CA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
San Diego Gas & Electric COShow sources
confidence: likely
CAISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
NocRoom Miami IT Services
Unclassified
FL
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Florida Power & Light COShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
NocRoom Miami IT Services
Unclassified
FL
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Florida Power & Light COShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Center for Computation & Technology (CCT)
Unclassified
LA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
EntergyShow sources
confidence: unverified
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
The Pittock Internet Exchange
Unclassified
Portland, OR
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
Alco PropertiesShow sources
confidence: likely
————
Portland General ElectricShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Google Fiber
Hyperscale
GA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
GoogleShow sources
confidence: likely
————
Georgia PowerShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Open Computing Facility
Unclassified
CA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Pacific Gas and ElectricShow sources
confidence: unverified
CAISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Lumos Networks
Unclassified
VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
American Electric PowerShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Rack59 Data Center
Unclassified
Oklahoma CIty, OK
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Oklahoma Gas & Electric COShow sources
confidence: likely
SPPEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Oso Grande
Unclassified
Albuquerque, NM
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
Oso GrandeShow sources
confidence: likely
————
Public Service CO of NmShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Morgan Wireless
Unclassified
Bath (Berkeley Springs), WV
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Potomac EdisonShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
VIRTBIZ
Unclassified
Dallas, TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Farmers Electric Coop, INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
FirstLight Data Center
Unclassified
Portland, ME
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
FirstLightShow sources
confidence: likely
————
Central Maine Power COShow sources
confidence: likely
ISO-NEEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Learning GIS!
Unclassified
IN
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Duke EnergyShow sources
confidence: unverified
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Agricultural and Biological Engineering
Unclassified
IN
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Duke EnergyShow sources
confidence: unverified
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Windstream Communications
Unclassified
Durham, NC
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Duke EnergyShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Level 3 Communications
Unclassified
Durham, NC
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Duke EnergyShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
OptimumHQ
Unclassified
Mesa, AZ
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Salt River ProjectShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
The Chatfield Group
Unclassified
Mesa, AZ
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Salt River ProjectShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
All About Serving Process Server
Unclassified
Chandler, AZ
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Salt River ProjectShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Emailage
Unclassified
AZ
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Salt River ProjectShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Alliance Technology
Unclassified
Mesa, AZ
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Salt River ProjectShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
8100 Boone Boulevard
Colocation
VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
Digital RealtyShow sources
confidence: likely
————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
HiPerGator
Unclassified
FL
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
University of FloridaShow sources
confidence: likely
————
Duke EnergyShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Atlanta ATL13
Colocation
Atlanta, GA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
Digital RealtyShow sources
confidence: likely
————
Georgia PowerShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Data Holdings Data Center
Unclassified
Milwaukee, WI
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
Potawatomi Business Development CorporationShow sources
confidence: likely
————
We EnergiesShow sources
confidence: likely
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
STACK Infrastructure
Colocation
San Jose, CA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
STACK InfrastructureShow sources
confidence: likely
————
Pacific Gas and ElectricShow sources
confidence: unverified
CAISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
STACK Infrastructure
Colocation
San Jose, CA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
STACK InfrastructureShow sources
confidence: likely
————
Pacific Gas and ElectricShow sources
confidence: unverified
CAISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
DartPoints Greenville
Unclassified
Greenville, SC
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
DartPointsShow sources
confidence: likely
——
3 MWAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.Show sources
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.confidence: likelyas of Sep 30, 2026

“This 25,800 sq ft facility offers 2.5 MW of utility power and 350 tons of N+1 cooling.”

—
Duke EnergyShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlyOct 12, 2026
Digital West Data Center
Unclassified
CA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
—————
Pacific Gas and ElectricShow sources
confidence: likely
CAISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Chick-fil-A Hiring Center
Unclassified
MI
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
Dennis SampierShow sources
confidence: likely
————
DTE ElectricShow sources
confidence: likely
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026