DC
/

Vantage TX1

Operating + expandingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.AI campusCampusSan Antonio, Bexar County, Texas

Vantage TX1 is an operating + expanding ai campus in San Antonio, Texas. Current power: 45 MW (estimated). Planned capacity: 179 MW (estimated). Verification: verified operating. 11 cited sources.

60% profile completeness
29 claims from 11 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Feb 15, 2026
Follow

Get changes to Vantage TX1

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Vantage TX1.” /facilities/vantage-tx1-san-antonio-tx. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_vantage_tx1_san_antonio_tx_2026,
  title = {{Vantage TX1}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/vantage-tx1-san-antonio-tx}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
45 MW[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Likelyestimated
Planned capacity
179 MW[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Likelyestimated
Building footprint
310,200 sq ft[5]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Likelyderived
Capital cost / investment
$1.2B[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Likelyestimated
First operational
Feb 15, 2026[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Likelyderived

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Remaining capacity: H2 2027 – H2 2028
Medium confidencewindow, not a prediction
Project verification
Verified operating
Operation documented by satellite imagery.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Pedernales Electric Coop, INC · ERCOT
Substation: On-site substation (likely CPS Energy substation)

Power reality

Announced
179 MW[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Research estimate of planned capacity (no company figure found)
Interconnection request
No record
Contracted / approved
No record
Under construction
134 MW[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Building 2 under construction (satellite-tracked phases)
Operational
45 MW[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Estimated from buildings observed operational
  • ⚠ No public interconnection record for this load — ERCOT does not publish large-load requests.
  • ⚠ No permit record linked to this site yet.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Operational (furthest stage with documented evidence)[1]
  • Stated date: Next projected milestone: 2027-08-31 (modeled/speculative)[1]
  • Required: 179 MW
Assumptions
  • From “Under construction”, large loads have typically taken 0.5–2 more years to first power (editorial range; see Methodology).
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H2 2027 – H2 2028

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionDec 15, 2023
    Model estimate · Satellite imagery
    • Dec 15, 2023 · Reported status: under construction[1]
    • Dec 15, 2023 · Construction start[1]
    • Dec 15, 2023 · Land clearing begins for both Building 1 & Building 2[1]
    • Feb 15, 2026 · Reported status: expanding[1]
  3. EnergizationFeb 15, 2026
    Satellite imagery
    • Feb 15, 2026 · Building 1 operational; Roads around Building 1 complete, all cooling and side generator equipment construction has since finished as well. Although this is still earlier than the [1]
  4. OperationalFeb 15, 2026
    Satellite imagery
    • Feb 15, 2026 · Building 1 operational; Roads around Building 1 complete, all cooling and side generator equipment construction has since finished as well. Although this is still earlier than the [1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.

Grid path

  1. facility
    Vantage TX1
  2. substation
    On-site substation (likely CPS Energy substation)[1][5]
    Satellite imageryLikely
    1 substation outline traced inside the campus on satellite imagery; OSM maps CPS Energy substation 0.49 km away
  3. transmission
    345 kV line[5]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.92 km away). Not confirmed as the supply path.
  4. utility
    Pedernales Electric Coop, INC[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    ERCOT[4]
    Service territoryLikely
    Balancing authority: ERCO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Pedernales Electric Coop, INC. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
29.41612, -98.78986
Address
14720 Omicron Dr, San Antonio, TX 78245[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Likely
County
Bexar County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Guadalupe Valley Elec Coop INC, Karnes Electric Coop INC, Bandera Electric Coop, INC.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
45 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Likelyestimated

Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.

Current IT capacity
32 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Likelyestimated

Estimated IT load currently online, based on buildings observed operational.

Planned capacity
179 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Likelyestimated

Projected facility power at the last tracked milestone (2027-08-31); not necessarily full build-out.

Estimated annual consumption
276 GWh/yr[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated

45 MW × 8,760 h × 70% utilization.

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
ERCOT[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
ERCO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
CPS Energy substation (138 kV)[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.5 km[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
345 kV[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
7.07¢/kWh[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Texas statewide average, July 2026.

State avg. commercial price
8.47¢/kWh[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Texas statewide average, July 2026.

Generation within 50 km
4.3 GW[8]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

20 EIA-reported plants within 50 km.

Generation queued in county
4.96 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 1, 2026.Confirmedderived

21 active generation interconnection requests in Bexar County: Storage 4,771 MW, Solar 152 MW, Gas 35 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
138 kV lineTransmission line0.46 km138 kV[5]
345 kV lineTransmission line0.92 km345 kV[5]
Leon Creek · City of San Antonio - (TX)Power plant (Natural Gas)21.9 km184 MW[8]
Oci Alamo Solar I Hybrid · OCI Energy LLCPower plant (Solar)37.1 km41 MW[8]
Arthur Von Rosenberg · City of San Antonio - (TX)Power plant (Natural Gas)43.1 km518 MW[8]
V H Braunig · City of San Antonio - (TX)Power plant (Natural Gas)43.3 km1.05 GW[8]
O W Sommers · City of San Antonio - (TX)Power plant (Natural Gas)46.7 km830 MW[8]
J K Spruce · City of San Antonio - (TX)Power plant (Coal)47 km1.35 GW[8]
Oci Alamo 4, LLC · Consolidated Edison Development Inc.Power plant (Solar)48 km40 MW[8]
Ebony Energy Storage · Ebony Energy Storage, LLCPower plant (Batteries)49.6 km200 MW[8]
CPS Energy substation · CPS EnergySubstation0.49 km138 kV[5]
Texas Research Substation · CPS EnergySubstation0.53 km138 kV[5]
Rafter Substation · CPS EnergySubstation1.58 km138 kV[5]
Largest queued generation in this countyFuelQueue statusMWSource
Howard Road BESSERCOT 29INR0173 · Project Fast Flow LLCStorageIn study · proposed 2028-04618 MW[6]
Orbit Energy StorageERCOT 27INR0082 · GCI Orbit Energy Storage, LLCStorageIn study · proposed 2027-06502 MW[6]
Bernice Energy StorageERCOT 27INR0294 · Bernice Energy Storage LLCStorageIn study · proposed 2029-02403 MW[6]
Mission Station Energy Storage IERCOT 28INR0474 · Mission Station LLCStorageIn study · proposed 2030-05375 MW[6]
Mission Station Energy Storage IIERCOT 28INR0475 · Mission Station LLCStorageIn study · proposed 2030-05375 MW[6]
Quela BESSERCOT 22INR0423 · BRP Quela BESS LLCStorageIn study · proposed 2027-12301 MW[6]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    Dec 15, 2023[1]
  5. First operational
    Feb 15, 2026[1]
  6. Expected completion
    Aug 31, 2027[1]
    Projected
Planned capacity
179 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Likelyestimated

Projected facility power at the last tracked milestone (2027-08-31); not necessarily full build-out.

Buildings (planned)
2[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Likelyderived

Count of building outlines traced on satellite imagery.

Buildings operational
1[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Likelyestimated
PhaseStatusAdded MWCompleted / expectedSource
Building 1operational45 MWFeb 15, 2026[1]
Building 2under construction134 MWAug 31, 2027 (projected)[1]

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Capital cost / investment
$1.2B[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Likelyestimated

Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
310,200 sq ft[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Sum of 3 building outlines mapped in OpenStreetMap within this campus.

Floor area
Not yet sourced

Compute

Chip types
B200[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Confirmed
Compute (H100-equivalents)
38,700[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Feb 15, 2026.Likelyestimated

What changed (last 3 years)

Follow this facility (RSS)
  • Buildings operational
    0Dec 15, 2023[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→1Feb 15, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
  • Status
    Under constructionDec 15, 2023[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→Operating + expandingFeb 15, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.

Timeline

Construction start: Dec 15, 2023[1]
First operational: Feb 15, 2026[1]
  1. Dec 15, 2023[1]

    Land clearing begins for both Building 1 & Building 2

  2. Feb 15, 202645 MW facility power· 1 buildings operational[1]

    Building 1 operational; Roads around Building 1 complete, all cooling and side generator equipment construction has since finished as well. Although this is still earlier than the completion date reported on TDLR, based on the appearance, we believe it is operational. Reported IT power of 32 MW. Source

  3. Aug 31, 2027Projected179 MW facility power· 2 buildings operational[1]

    Estimated construction completion date of Building 2. Construction Project Filing

Buildings on this campus

4

All claims (provenance audit)

29
FieldValueSourceConfidenceAs ofStatus
NameVantage TX1[1] Likely2026-02-15Shown
StatusUnder construction[1] derivedLikely2023-12-15Superseded / alternative
StatusOperating + expanding[1] derivedLikely2026-02-15Shown
Facility typeAI campus[1] derivedLikely2026-02-15Shown
Address14720 Omicron Dr, San Antonio, TX 78245[1] Likely2026-02-15Shown
UtilityPedernales Electric Coop, INCterritory 14626: PEDERNALES ELECTRIC COOP, INC (COOPERATIVE, PEDERNALES ELECTRIC[2] derivedUnverified2022Shown
Current facility power45 MW[1] estimatedLikely2026-02-15Shown
Current IT capacity32 MW[1] estimatedLikely2026-02-15Shown
Planned capacity179 MW[1] estimatedLikely2026-02-15Shown
Estimated annual consumption276 GWh/yr[3] estimatedSpeculative2026-10-12Shown
ISO / RTOERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.[4] derivedLikely—Shown
Balancing authorityERCO[2] derivedLikely—Shown
Nearest mapped substationCPS Energy substation (138 kV)way/1533313387[5] derivedLikely2026-09-28Shown
Distance to substation0.5 km[5] derivedLikely2026-09-28Shown
Highest-voltage line nearby345 kV[5] derivedLikely2026-09-28Shown
Generation queued in county4.96 GW[6] derivedConfirmed2026-10-01Shown
State avg. industrial price7.07¢/kWh[7] Confirmed2026-07Shown
State avg. commercial price8.47¢/kWh[7] Confirmed2026-07Shown
Generation within 50 km4.3 GW[8] derivedConfirmed202502Shown
Buildings (planned)2[1] derivedLikely2026-02-15Shown
Buildings operational1[1] estimatedLikely2026-02-15Shown
Buildings operational0[1] estimatedLikely2023-12-15Superseded / alternative
Building footprint310,200 sq ftway/1010260674 way/1344369111 way/1533148752[5] derivedLikely2026-10-12Shown
Capital cost / investment$1.2B[1] estimatedLikely2026-02-15Shown
Compute (H100-equivalents)38,700[1] estimatedLikely2026-02-15Shown
Chip typesB200[1] Confirmed2026-02-15Shown
Construction startDec 15, 2023[1] derivedLikely2026-02-15Shown
First operationalFeb 15, 2026[1] derivedLikely2026-02-15Shown
Expected completionAug 31, 2027[1] estimatedSpeculative2026-02-15Shown