DC
/

DartPoints Greenville

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.UnclassifiedSiteGreenville, Greenville County, South Carolina

DartPoints Greenville is an operating data center in Greenville, South Carolina. Operated or owned by DartPoints. Planned capacity: 3 MW (announced). Verification: announced only. 6 cited sources.

40% profile completeness
15 claims from 6 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to DartPoints Greenville

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “DartPoints Greenville.” /facilities/dartpoints-greenville-greenville-sc. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_dartpoints_greenville_greenville_sc_2026,
  title = {{DartPoints Greenville}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/dartpoints-greenville-greenville-sc}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
3 MW[3]
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
Medium confidence
Project verification
Announced only
Only announcements or press coverage found.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Duke Energy · None (non-RTO region)
Substation: Unnamed substation (100 kV) (nearest, unverified)

Power reality

Announced
3 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.
Reported by dartpoints.com
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. AnnouncedSep 30, 2026
    Company announcement
    • Sep 30, 2026 · Planned capacity reported: 2.5 MW[3]
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Company announcement, Community map.

Grid path

  1. facility
    DartPoints Greenville (GSP01)
  2. substation
    Unnamed substation (100 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.96 km away. Proximity does not establish that it serves the site.
  3. transmission
    100 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.27 km away). Not confirmed as the supply path.
  4. utility
    Duke Energy[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    None (non-RTO region)[4]
    Service territoryLikely
    Balancing authority: DUK
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Duke Energy. Know one? Add a source

Location & imagery

Street address
Coordinates
34.80753, -82.34349
Address
78 Global Drive, Unit 100, Greenville, SC 29607[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Greenville County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Planned capacity
3 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely

“This 25,800 sq ft facility offers 2.5 MW of utility power and 350 tons of N+1 cooling.” — Capacity stated on the operator's facility page (facility capacity). Recorded as design capacity, not as power currently in use.

Current facility power
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
None (non-RTO region)[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Outside all ISO/RTO footprints; balancing authority shown separately.

Balancing authority
DUK[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (100 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
1 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
100 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
7.84¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

South Carolina statewide average, July 2026.

State avg. commercial price
11.61¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

South Carolina statewide average, July 2026.

Generation within 50 km
1.13 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

33 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
100 kV lineTransmission line0.27 km100 kV[1]
Bmw Manufacturing CO · BMW Manufacturing Co LLCPower plant (Biomass)17.9 km10 MW[6]
W S Lee · Duke Energy Carolinas, LLCPower plant (Natural Gas)24.3 km864 MW[6]
Pinson Solar Farm · Cardinal RenewablesPower plant (Solar)27.7 km20 MW[6]
Hollidays Bridge Hydro · Northbrook Carolina Hydro LLCPower plant (Hydroelectric)31.3 km5 MW[6]
Ware Shoals Hydro Project · Central Rivers Power US, LLCPower plant (Hydroelectric)46 km6 MW[6]
Duke Energy Chp At Clemson University · Duke Energy Carolinas, LLCPower plant (Natural Gas)46.1 km13 MW[6]
Tuxedo · Northbrook Tuxedo, LLCPower plant (Hydroelectric)48.8 km6 MW[6]
Keowee · Duke Energy Carolinas, LLCPower plant (Hydroelectric)49.7 km152 MW[6]
Unnamed substationSubstation0.96 km100 kV[1]
Unnamed substationSubstation1.02 km100 kV[1]
Unnamed substationSubstation2.46 km—[1]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —
Planned capacity
3 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely

“This 25,800 sq ft facility offers 2.5 MW of utility power and 350 tons of N+1 cooling.” — Capacity stated on the operator's facility page (facility capacity). Recorded as design capacity, not as power currently in use.

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

15
FieldValueSourceConfidenceAs ofStatus
NameDartPoints Greenvillenode/8390959153 name=DartPoints Greenville[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Websitehttps://dartpoints.com/locations/gsp01-greenville-sc/[1] Likely2026-10-12Shown
Address78 Global Drive, Unit 100, Greenville, SC 29607[1] Likely2026-10-12Shown
OperatorDartPointsoperator=DartPoints[1] Likely2026-10-12Shown
UtilityDuke Energyterritory 5416: DUKE ENERGY CAROLINAS, LLC (INVESTOR OWNED, DUKE ENERGY CORP)[2] derivedLikely2022Shown
Planned capacity3 MW[3] Likely2026-09-30Shown
ISO / RTONone (non-RTO region)[4] derivedLikely—Shown
Balancing authorityDUK[2] derivedLikely—Shown
Nearest mapped substationUnnamed substation (100 kV)way/310377236[1] derivedLikely2026-09-28Shown
Distance to substation1 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby100 kV[1] derivedLikely2026-09-28Shown
State avg. industrial price7.84¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price11.61¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km1.13 GW[6] derivedConfirmed202502Shown