Phoenix
Market boundary: facilities within 60 km of the metro center (editorial definition).
Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Percentages under each total show how much of it is backed by each evidence level.
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedConstruction pipeline by expected completion
MW from phases with a projected completion date
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
How to read this
Each bar sums one kind of evidence across facilities. Announced is the largest MW a company, utility, government or press source reported. Interconnection requests are MW in active large-load queue requests. Of the grid operators we ingest, only NYISO publishes these project by project. Contracted / approved means an executed interconnection agreement or a reported utility or power contract. Under construction and Operational come from construction records, imagery or operator reports.
The gap between announced and documented MW is capacity that has been claimed but not yet backed by a grid, construction or operating record. It is not proof a project won't happen. On-site generation is listed separately and never added to grid capacity. Method
Time to power puts each site's pending MW (announced minus operational) into a bucket by the midpoint of its evidence-based window. The window starts at the furthest documented stage and adds editorial ranges for what remains (e.g. announced: 2–5 yrs; land acquired: 2–4.5 yrs; planning / zoning: 1.75–4 yrs). Insufficient evidence means no dated stage evidence, not a delay. Windows are ranges, not forecasts. All ranges and rules
- Announced293 MW
- Interconnection requests—
- Contracted / approved—
- Under construction190 MW
- Operational577 MW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Interconnection queues
Active requests to connect to the grid (CAISO). Requests are applications, not commitments.
How to read this
A queue request asks a grid operator (ISO/RTO) to connect a new generator or large load to the transmission system. It then moves through studies (feasibility, system impact, facilities) before an interconnection agreement, construction and service. Filing is an application, not a commitment to build. Generation totals here are active requests only.
Why most aren't built: in the queue files we ingest, no grid operator in this scope publishes its withdrawn requests. These are shares of each published file, not completion rates. CAISO is left out because their files don't include withdrawn requests. Queue sources
Data-center load requests are shown only where an ISO publishes them project by project (NYISO). Elsewhere, large loads go through utilities, and the ISO figures above (e.g. ERCOT's large-load tracking) are quoted from the operator's own documents.
Coverage
How much of this scope our sources describe. Low coverage means data isn't disclosed or not yet collected, not that there's nothing there.
Confirmed evidence = at least one fact about the facility itself from a filing, deed, permit, interconnection record, or government or utility record. Regional context (state prices, nearby plants, utility territory maps) doesn't count. Most facilities come from OpenStreetMap, which records that a building exists but rarely its power, owner or status.
Largest operators & owners
Online + pipeline MW at linked facilities
- Microsoft263 MW + 0 MW · 6 sites
- Google237 MW + 0 MW · 1 sites
- CyrusOne— · 8 sites
- Iron Mountain— · 3 sites
- EdgeConneX— · 2 sites
- Digital Realty— · 2 sites
- QTS Data Centers— · 2 sites
- Lumen Technologies— · 1 sites
- Flexential— · 1 sites
- Cogent Communications— · 1 sites
- H5 Data Centers— · 1 sites
- Apple— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
Utility exposure
Most likely retail utility by location (approximate)
- Salt River Project577 MW + 190 MW · 50 sites
- Arizona Public Service— · 14 sites
Grid operators (ISO / RTO)
By facility location
- None (non-RTO region)577 MW + 190 MW · 64 sites
Largest facilities
By online + pipeline MW; badge = evidence behind each figure
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| Stream Phoenix | Operating + expandingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 77 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 190 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Microsoft Goodyear | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 263 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
| Google Mesa | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 237 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
Facilities by status
- Operating63
- Operating + expanding1
Campuses & sites (46)
Campus pages list their buildings
- Stream Phoenix77 MW online EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. · 190 MW pipeline EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Microsoft Goodyear263 MW online EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Google Mesa237 MW online EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- 1GServersbuilding
- Accelera Data Systemssite
- Alembic Computer Services, Inc.site
- Aligned Energy Data Centerbuilding
- All About Serving Process Serversite
- Alliance Technologysite
- Apple Data Centerbuilding
- AZ Labsbuilding
- Centersquare: Phoenix - (PHX1 - Mesa)building
- Cogent Data Centerbuilding
- Comarchsite
- Data Storage Centersbuilding
- DataPro USA Web Developmentsite
- Digital Realty Data Centerbuilding
- Digital Realty Phoenix PHX15building
- EdgeConneXbuilding
- EdgeConneX PHX02 Data Centerbuilding
- EdgeCorebuilding
- Emailagesite
- Flexential Phoenix - Deer Valleybuilding
- GoDaddy - Gilbertbuilding
- H5 Phoenixbuilding
- Iron Mountain Data Centers AZS-1site
- Iron Mountain Records Storagebuilding
- J-Curve Technologiessite
- K-Motion Interactivesite
- L3Harris Technologies Incbuilding
- Lumenbuilding
- Myndshift Technologiesbuilding
- Omnis Networkbuilding
- OptimumHQsite
- PhoenixNAPbuilding
- Profit Finder Pro Softwaresite
- StrongMindbuilding
- The Chatfield Groupsite
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data center — 4010 North 3rd Streetbuilding
- Unnamed data center — 850 South Bullard Avenuebuilding
- Vantage Data Centersbuilding
- VaultLogixsite