DC
/

EdgeConneX

What changed

Colocation provider

EdgeConneX is linked to 10 tracked US data centers in 6 states as owner, operator, developer, tenant, utility or other party. None of its linked facilities disclose power yet. Every relationship cites its source.

View on map →
Follow

Get changes to EdgeConneX

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “EdgeConneX: US data center footprint.” /companies/edgeconnex. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_edgeconnex_2026,
  title = {{EdgeConneX: US data center footprint}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/companies/edgeconnex}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Linked facilities
10
States
6
Reported power online (floor)
—
Reported planned capacity (floor)
13 MW
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.100%
This company's facilities:Download CSVJSONAPI docs

Floors, not totals: power sums only facilities with a reported or estimated figure (2 of 10), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.

Loading map…

US footprint by state

Relationship graph

Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.

Powered by

Occupies property owned by

FacilityRoleLocationStatusPower
EdgeConneX CHI02Operator LikelyElk Grove Village, ILOperating7 MW planned AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.
EdgeConneX - PortlandOperator LikelyHillsboro, OROperating6 MW planned AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.
EdgeConneXOperator LikelyTempe, AZOperating—
EdgeConneX - DEN01Operator LikelyEnglewood, COOperating—
EdgeConnex - DEN02Operator LikelyCOOperating—
EdgeConneX CHI01Operator LikelyElk Grove Village, ILOperating—
Edgeconnex Data CenterOperator LikelyRancho Cordova, CAOperating—
EdgeConneX Detroit DET01Operator LikelySouthfield, MIOperating—
EdgeConneX PHX02 Data CenterOperator LikelyMesa, AZOperating—
EdgeConneX San DiegoOperator LikelySan Diego, CAOperating—