EdgeCore
EdgeCore is an operating data center in Mesa, Arizona. Power capacity has not been disclosed or collected yet. Verification: verified operating. 7 cited sources.
Follow
Get changes to EdgeCore
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “EdgeCore.” /facilities/edgecore-mesa-az. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_edgecore_mesa_az_2026,
title = {{EdgeCore}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/edgecore-mesa-az}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Community map.
Grid path
- →facilityEdgeCore
- →substationHoward Substation (69 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.15 km away. Proximity does not establish that it serves the site.
- →transmissionKyrene - Browning 500KV[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.49 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Salt River Project. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 33.34421, -111.61971
- Address
- 3856 South Everton Terrace, Mesa, AZ 85212[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- County
- Maricopa County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Property owner of record
- Utility
Most likely retail provider among 11 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration, Electrical Dist No8 Maricopa, Usbia-San Carlos Project, Gila River Indian Utility Authority (Gricua), Maricopa County M W C Dist #1, Buckeye Water C&D District, ….
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- None (non-RTO region)[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
- SRP[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Howard Substation (69 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.2 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 500 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 9.35¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Arizona statewide average, July 2026.
- State avg. commercial price
- 13.12¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Arizona statewide average, July 2026.
- Generation within 50 km
- 4.14 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
29 EIA-reported plants within 50 km.
- Generation queued in county
- 1.12 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
5 active generation interconnection requests in Maricopa County: Solar + storage 1,100 MW, Solar 20 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 69 kV line | Transmission line | 0.1 km | 69 kV | [1] |
| 34.5 kV line | Transmission line | 1.13 km | 34.5 kV | [1] |
| 230 kV line | Transmission line | 1.26 km | 230 kV | [1] |
| Kyrene - Browning 500KV · Arizona Public Service | Transmission line | 1.49 km | 500 kV | [1] |
| Santan · Salt River Project | Power plant (Natural Gas) | 12.2 km | 1.29 GW | [7] |
| Superstition Energy Storage · Superstition Energy Storage, LLC | Power plant (Batteries) | 19.7 km | 90 MW | [7] |
| Ocotillo · Arizona Public Service Co | Power plant (Natural Gas) | 28.5 km | 605 MW | [7] |
| Kyrene · Salt River Project | Power plant (Natural Gas) | 29.3 km | 525 MW | [7] |
| Horse Mesa · Salt River Project | Power plant (Pumped Storage) | 37.5 km | 151 MW | [7] |
| Sundance · Arizona Public Service Co | Power plant (Natural Gas) | 46.3 km | 410 MW | [7] |
| Brittlebush Solar · Randolph Solar Park LLC | Power plant (Solar) | 48.1 km | 200 MW | [7] |
| Coolidge Generation Station · Salt River Project | Power plant (Natural Gas) | 48.7 km | 521 MW | [7] |
| Howard Substation · Salt River Project | Substation | 0.15 km | 69 kV | [1] |
| Unnamed substation | Substation | 1.12 km | 69 kV | [1] |
| Prickly Pear Substation · Salt River Project | Substation | 1.29 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.31 km | 69 kV | [1] |
| Unnamed substation | Substation | 1.62 km | 69 kV | [1] |
| Luna Substation · Salt River Project | Substation | 1.66 km | 69 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| HARQUAHALA FLATS 2CAISO 2027 | Solar + storage | In study · proposed 2028-04 | 400 MW | [5] |
| HARQUAHALA SUNRISECAISO 1678 | Solar + storage | In study · proposed 2030-04 | 300 MW | [5] |
| VULCANCAISO 1534 | Solar + storage | In study · proposed 2027-12 | 250 MW | [5] |
| HARQUAHALA SUNRISE 2CAISO 2029 | Solar + storage | In study · proposed 2026-09 | 150 MW | [5] |
| AGUA CALIENTE SOLAR 2CAISO 1222 | Solar | In study · proposed 2016-12 | 20 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquiredJul 21, 2025[2]
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 304-31-959 Maricopa County, AZ | — | 39.94 | CONTACT LOCAL JURISDICTION · Property use code 1126 | — | [2] |
| 304-31-955 Maricopa County, AZ | MECP1 MESA 2 LLC 3800 N CENTRAL AVE STE 460 PHOENIX AZ USA 85012 | 3.64 | CONTACT LOCAL JURISDICTION · Property use code 1507 | — | [2] |
- Site area
- 43.6 acres[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Sum of county land area across parcels.
- Land use
- Property use code 1126[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Annual property tax
- Not yet sourced
- Comarch · 2.0 km · parcel 304-04-918A$1.2M · Apr 1, 2020 [2]
- EdgeConneX PHX02 Data Center · 2.7 km · parcel 304-03-982$187M · Aug 1, 2022 [2]
- Alliance Technology · 10.8 km · parcel 140-69-027$499,000 · May 1, 2022 [2]
- The Chatfield Group · 13.0 km · parcel 140-66-892$1M · May 1, 2019 [2]
- Myndshift Technologies · 17.3 km · parcel 141-37-056D$1.9M · Feb 1, 2020 [2]
- All About Serving Process Server · 17.9 km · parcel 302-84-928$2.6M · Oct 1, 2021 [2]
Size
- Building footprint
- 113,200 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Parcel / land records
- 304-31-959 (Maricopa County),304-31-955 (Maricopa County)[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
All claims (provenance audit)
22| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | EdgeCoreway/808979618 name=EdgeCore | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Address | 3856 South Everton Terrace, Mesa, AZ 85212 | [1] | Likely | 2026-10-12 | Shown |
| Property owner of record | Mecp1 Mesa 2 LLCParcel 304-31-955: MECP1 MESA 2 LLC | [2] | Confirmed | 2026-10-12 | Shown |
| Utility | Salt River Projectterritory 16572: SALT RIVER PROJECT (POLITICAL SUBDIVISION, SALT RIVER PROJECT) | [3] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [4] derived | Likely | — | Shown |
| Balancing authority | SRP | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Howard Substation (69 kV)way/1390793982 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.2 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 500 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.12 GW | [5] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 9.35¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.12¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 4.14 GW | [7] derived | Confirmed | 202502 | Shown |
| Building footprint | 113,200 sq ft | [1] derived | Likely | 2026-10-12 | Shown |
| Site area | 43.6 acres | [2] | Confirmed | 2026-10-12 | Shown |
| Parcel / land records | 304-31-959 (Maricopa County) | [2] | Confirmed | 2026-10-12 | Shown |
| Parcel / land records | 304-31-955 (Maricopa County) | [2] | Confirmed | 2026-10-12 | Shown |
| Assessed value (official) | $70.3M | [2] | Confirmed | 2027 | Shown |
| Land use | Property use code 1126 | [2] | Confirmed | 2026-10-12 | Shown |
| Land use | Property use code 1507 | [2] | Confirmed | 2026-10-12 | Superseded / alternative |
| Land acquired | Jul 21, 2025 | [2] derived | Confirmed | 2026-10-12 | Shown |