Austin & Central Texas
Market boundary: facilities within 75 km of the metro center (editorial definition).
Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Percentages under each total show how much of it is backed by each evidence level.
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedConstruction pipeline by expected completion
MW from phases with a projected completion date
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
How to read this
Each bar sums one kind of evidence across facilities. Announced is the largest MW a company, utility, government or press source reported. Interconnection requests are MW in active large-load queue requests. Of the grid operators we ingest, only NYISO publishes these project by project. Contracted / approved means an executed interconnection agreement or a reported utility or power contract. Under construction and Operational come from construction records, imagery or operator reports.
The gap between announced and documented MW is capacity that has been claimed but not yet backed by a grid, construction or operating record. It is not proof a project won't happen. On-site generation is listed separately and never added to grid capacity. Method
Time to power puts each site's pending MW (announced minus operational) into a bucket by the midpoint of its evidence-based window. The window starts at the furthest documented stage and adds editorial ranges for what remains (e.g. announced: 2–5 yrs; land acquired: 2–4.5 yrs; planning / zoning: 1.75–4 yrs). Insufficient evidence means no dated stage evidence, not a delay. Windows are ranges, not forecasts. All ranges and rules
- Announced1.5 GW
- Interconnection requests—
- Contracted / approved—
- Under construction—
- Operational231 MW
1.5 GW announced at 2 sites has no grid, construction or operating record yet.
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
- OpenAI Stargate Milam1.2 GW / 0
- Rowan Temple300 MW / 0
Interconnection queues
Active requests to connect to the grid (ERCOT). Requests are applications, not commitments.
How to read this
A queue request asks a grid operator (ISO/RTO) to connect a new generator or large load to the transmission system. It then moves through studies (feasibility, system impact, facilities) before an interconnection agreement, construction and service. Filing is an application, not a commitment to build. Generation totals here are active requests only.
Why most aren't built: in the queue files we ingest, no grid operator in this scope publishes its withdrawn requests. These are shares of each published file, not completion rates. ERCOT is left out because their files don't include withdrawn requests. Queue sources
Data-center load requests are shown only where an ISO publishes them project by project (NYISO). Elsewhere, large loads go through utilities, and the ISO figures above (e.g. ERCOT's large-load tracking) are quoted from the operator's own documents.
Coverage
How much of this scope our sources describe. Low coverage means data isn't disclosed or not yet collected, not that there's nothing there.
Confirmed evidence = at least one fact about the facility itself from a filing, deed, permit, interconnection record, or government or utility record. Regional context (state prices, nearby plants, utility territory maps) doesn't count. Most facilities come from OpenStreetMap, which records that a building exists but rarely its power, owner or status.
Largest operators & owners
Online + pipeline MW at linked facilities
- SoftBank0 MW + 1.2 GW · 1 sites
- Meta231 MW + 0 MW · 1 sites
- CyrusOne— · 2 sites
- Lumen Technologies— · 1 sites
- Alpheus— · 1 sites
- Switch— · 1 sites
- Rowan Digital Infrastructure— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
Utility exposure
Most likely retail utility by location (approximate)
- Bluebonnet Electric Coop, INC0 MW + 1.2 GW · 1 sites
- Pedernales Electric Coop, INC231 MW + 0 MW · 5 sites
- Austin Energy— · 12 sites
- Oncor Electric Delivery— · 1 sites
Grid operators (ISO / RTO)
By facility location
- ERCOT231 MW + 1.2 GW · 19 sites
Largest facilities
By online + pipeline MW; badge = evidence behind each figure
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| OpenAI Stargate Milam | Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — | 1.2 GW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |
| Meta Temple | OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | 231 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. | — |
Facilities by status
- Operating17
- Under construction1
- Unknown1
Campuses & sites (17)
Campus pages list their buildings
- OpenAI Stargate Milam · 1.2 GW pipeline EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Meta Temple231 MW online EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Alpheus DataCenterbuilding
- Cortex supercomputerbuilding
- Data Foundry - Texas 1building
- Data Foundry - Texas 2building
- Data Foundry Austin 1 Data Centerbuilding
- Digital Realty Austin AUS11building
- Element Criticalbuilding
- LightEdge Austin Ibuilding
- LightEdge Austin IIbuilding
- Lumen Austin 1building
- Lumen Austin 3building
- Rowan Templecampus
- Switch: The Rockbuilding
- Thin-nologybuilding
- Unnamed data centerbuilding