Oncor Electric Delivery
What changedUtility / energy · also matched as Oncor Electric Delivery Company LLC
Oncor Electric Delivery is linked to 6 tracked US data centers in 1 state as owner, operator, developer, tenant, utility or other party. None of its linked facilities disclose power yet. Every relationship cites its source.
View on map →
Follow
Get changes to Oncor Electric Delivery
Or subscribe in a feed reader: RSS / Atom
Cite this
Text
Datacenter Source. “Oncor Electric Delivery: US data center footprint.” /companies/oncor. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_oncor_2026,
title = {{Oncor Electric Delivery: US data center footprint}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/companies/oncor}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
Linked facilities
6
States
1
Reported power online (floor)
—
Reported planned capacity (floor)
1.16 GW
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.100%
Floors, not totals: power sums only facilities with a reported or estimated figure (5 of 6), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.
Loading map…
US footprint by state
- Texas6 sites
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| Rowan Temple | Utility | Temple, TX | Unknown | 300 MW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| SkyBox Lancaster | Utility | Lancaster, TX | Unknown | 300 MW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| Stream Wilmer | Utility | Wilmer, TX | Unknown | 240 MW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| STACK Lancaster | Utility | Lancaster, TX | Unknown | 216 MW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| SkyBox Plano | Utility | Plano, TX | Unknown | 100 MW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. |
| Unnamed data center — 2236 Airport Drive | Utility Unverified | Wichita Falls, TX | Operating | — |