DC
/

Comcast

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.UnclassifiedBuildingSouthgate, Wayne County, Michigan

Comcast is an operating data center in Southgate, Michigan. Operated or owned by Comcast. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.

30% profile completeness
15 claims from 6 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Comcast

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Comcast.” /facilities/comcast-southgate-mi. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_comcast_southgate_mi_2026,
  title = {{Comcast}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/comcast-southgate-mi}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
1,000 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
DTE Electric · MISO
Substation: Dix Substation (40 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Comcast
  2. substation
    Dix Substation (40 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.48 km away. Proximity does not establish that it serves the site.
  3. transmission
    120 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.91 km away). Not confirmed as the supply path.
  4. utility
    DTE Electric[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    MISO[3]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for DTE Electric. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
42.21390, -83.19821
Address
14312 Northline Road, Southgate, MI 48195[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Wayne County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:
DTE Electric[2]Unverified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility
DTE Electric[2]Unverified

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wyandotte Municipal Serv Comm.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
MISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Dix Substation (40 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.5 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
120 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
9.81¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Michigan statewide average, July 2026.

State avg. commercial price
16.46¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Michigan statewide average, July 2026.

Generation within 50 km
5.91 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

22 EIA-reported plants within 50 km.

Generation queued in county
1.01 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

7 active generation interconnection requests in Wayne County: Storage 950 MW, Gas 50 MW, Other 8 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
40 kV lineTransmission line0.47 km40 kV[1]
Trunk 5140 · DTE EnergyTransmission line0.55 km40 kV[1]
120 kV lineTransmission line1.91 km120 kV[1]
Jupiter - Navarre · ITCTransmission line1.93 km120 kV[1]
Jupiter - Taurus · ITCTransmission line1.95 km120 kV[1]
Jupiter - Taurus;Jupiter - Navarre · ITCTransmission line1.98 km120 kV[1]
Dearborn Industrial Generation · Dearborn Industrial Gen IncPower plant (Natural Gas)10.5 km739 MW[6]
Delray · DTE Electric CompanyPower plant (Natural Gas)12 km127 MW[6]
Sumpter · Wolverine Power Supply CoopPower plant (Natural Gas)28 km308 MW[6]
Fermi · DTE Electric CompanyPower plant (Nuclear)28.3 km1.19 GW[6]
Northeast (Mi) · DTE Electric CompanyPower plant (Natural Gas)29.4 km101 MW[6]
Monroe (Mi) · DTE Electric CompanyPower plant (Coal)38 km3.08 GW[6]
Hancock · DTE Electric CompanyPower plant (Natural Gas)42.4 km93 MW[6]
University of Michigan · University of MichiganPower plant (Natural Gas)44.8 km57 MW[6]
Dix Substation · DTE EnergySubstation0.48 km40 kV[1]
DTE Energy substation · DTE EnergySubstation1.89 km24 kV[1]
Jupiter Substation · ITCSubstation1.92 km120 kV[1]
Substation 7 · Wyandotte Municipal ServicesSubstation2.98 km69 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
J3872 at RIVER ROUGEMISO J3872StorageIn study · proposed 2029-01350 MW[4]
J1900 at Brownstown 12 120kVMISO J1900StorageIn study · proposed 2024-09200 MW[4]
J1902 at IRONTONMISO J1902StorageIn study · proposed 2024-09200 MW[4]
J2991 at Dayton 120kV SubstationMISO J2991StorageIn study · proposed 2025-09200 MW[4]
J1262 at Waterman 120kV SubstationMISO J1262GasIA signed · proposed 2019-0625 MW[4]
J1798 at Waterman 120kVMISO J1798GasIA signed · proposed 2021-0625 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
1,000 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

15
FieldValueSourceConfidenceAs ofStatus
NameComcastway/812630939 name=Comcast[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Address14312 Northline Road, Southgate, MI 48195[1] Likely2026-10-12Shown
OperatorComcastoperator=Comcast[1] Likely2026-10-12Shown
UtilityDTE Electricterritory 5109: DTE ELECTRIC COMPANY (INVESTOR OWNED, DTE ENERGY)[2] derivedUnverified2022Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC..[3] derivedLikely—Shown
Balancing authorityMISO[2] derivedLikely—Shown
Nearest mapped substationDix Substation (40 kV)way/810517914[1] derivedLikely2026-09-28Shown
Distance to substation0.5 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby120 kV[1] derivedLikely2026-09-28Shown
Generation queued in county1.01 GW[4] derivedConfirmed2026-10-12Shown
State avg. industrial price9.81¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price16.46¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km5.91 GW[6] derivedConfirmed202502Shown
Building footprint1,000 sq ft[1] derivedLikely2026-10-12Shown