Cipher Mining
What changedDeveloper
Cipher Mining is linked to 1 tracked US data center in 1 state as owner, operator, developer, tenant, utility or other party. Facilities with a disclosed figure add up to 0 MW online and 300 MW in the pipeline (floors: 1 of 1 report power). Every relationship cites its source.
Follow
Get changes to Cipher Mining
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Cipher Mining: US data center footprint.” /companies/cipher-mining. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_cipher_mining_2026,
title = {{Cipher Mining: US data center footprint}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/companies/cipher-mining}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
Floors, not totals: power sums only facilities with a reported or estimated figure (1 of 1), across all roles (a company can be tenant at one site and owner at another). “—” means not disclosed or not yet collected.
US footprint by state
- Texas1 sites
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
Serves workloads of
- Anthropic1 site · ConfirmedAnthropic Barber Lake
Powered by
- Taylor Electric Coop INC - (Tx)1 site · UnverifiedAnthropic Barber Lake
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| Anthropic Barber Lake | Owner | TX | Under construction | 300 MW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. |