DC
/

Dataset table

Every tracked facility. Click any value to see its evidence level, date, supporting quote and sources. “—” means not disclosed or not yet collected.

1,935 rows:Download CSVJSONAPI docs
Clear
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assigned
Data centers, sorted by Power online
FacilityLocationStatusOperator / ownerTenants / usersPower online ↓PlannedSizeUtility · ISOVerificationLast verified
Atlanta III
Colocation
Lithia Springs, GA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
T5 Data CentersShow sources
confidence: likely
———
123,400 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
Georgia PowerShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
The Keep
Colocation
Lithia Springs, GA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
SwitchShow sources
confidence: likely
———
161,700 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
Georgia PowerShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Microsoft
Hyperscale
Atlanta, GA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
MicrosoftShow sources
confidence: likely
———
31,200 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
Georgia PowerShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Microsoft
Hyperscale
GA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
MicrosoftShow sources
confidence: likely
———
249,100 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
Georgia PowerShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
NetSource Communications, Inc
Unclassified
Naperville, IL
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
NetSourceShow sources
confidence: likely
———
16,300 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
Commonwealth Edison (ComEd)Show sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Google
Hyperscale
IA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
GoogleShow sources
confidence: likely
———
297,100 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—UnverifiedOct 12, 2026
Google
Hyperscale
IA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
GoogleShow sources
confidence: likely
———
51,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—UnverifiedOct 12, 2026
Amazon IAD-198
Hyperscale
Gainesville, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
———
109,500 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—Documented developmentOct 12, 2026
Unnamed data center
Unclassified
MO
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
————
175,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—Unverified—
Unnamed data center
Unclassified
MO
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
————
175,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—Unverified—
Unnamed data center
Unclassified
MO
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
————
301,800 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—Unverified—
Unnamed data center
Unclassified
MO
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
————
274,100 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—Unverified—
Unnamed data center
Unclassified
MO
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
————
311,800 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Oct 12, 2026
—Unverified—
Chirisa Technology Parks - Piscataway
Unclassified
NJ
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
Chirisa Technology ParksShow sources
confidence: likely
—————
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
OVHcloud - Hillsboro
Unclassified
Hillsboro, OR
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
OVHcloudShow sources
confidence: likely
—————
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
SES - Hawley Earth Station
Unclassified
PA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
SESShow sources
confidence: likely
—————
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Liberty Center One
Unclassified
Royal Oak, MI
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
——————
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
HPC
Unclassified
NM
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
Sandia National LaboratoriesShow sources
confidence: likely
—————
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Barclays Datacenter
Unclassified
NJ
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
BarclaysShow sources
confidence: likely
—————
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
CyberNAP Glen Burnie
Unclassified
MD
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
AiNETShow sources
confidence: likely
—————
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Dakota Carrier Network
Unclassified
ND
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
——————
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Microsoft Data Center 1
Hyperscale
Gainesville, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
MicrosoftShow sources
confidence: likely
—————
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
IONIC Digital Cedarvale
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Oct 12, 2026
IONIC DigitalShow sources
confidence: likely
—————
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedOct 12, 2026
Meta El Paso Data Center
Unclassified
El Paso, TX
Under constructionAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.Show sources
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.confidence: likely

“Construction begins on a Meta data center, located between Stan Roberts Sr. Ave. and State Line Road in Northeast El Paso, Oct. 13, 2025.”

  • El Paso Matters · Inside the power deal behind Meta’s El Paso data center now at $10 bil
MetaShow sources
confidence: likely

“Meta Platform begins construction on its new multi-billion dollar El Paso data center”

“Meta plans to hire 300 full-time employees to operate the facility.”

  • El Paso Matters · Inside the power deal behind Meta’s El Paso data center now at $10 bil
——
1 GWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“$10 billion, 1,000 MW data center project.”

“Today, Meta is thrilled to confirm the El Paso Data Center will grow to 1 gigawatt.”

—
El Paso ElectricShow sources
confidence: confirmed

“El Paso Electric Meta / Data Center Northeast El Paso, TX”

“El Paso Electric in December asked the PUC to allow the utility to build the 366-megawatt, natural gas-fired power station to provide electricity to the AI data center in Northeast.”

None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionSep 28, 2026
QTS Van Wert (Mega Site)
Unclassified
Van Wert, OHUnknown
QTS Data CentersShow sources
confidence: likely

“QTS Data Centers, which is headquartered in Overland Park, Kansas, was named as the end user of the $10 billion, 500 megawatt data center at the Mega Site”

——
500 MWAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.Show sources
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.confidence: likelyas of Sep 27, 2026

“$10 billion, 500 megawatt data center”

——
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 27, 2026
Related Digital / CoreWeave Cheyenne
Unclassified
Cheyenne, WYUnknown
Related DigitalShow sources
confidence: confirmed

“Related Digital, CoreWeave / Data Center Cheyenne, WY”

CoreWeaveShow sources
confidence: likely

“Related Digital, CoreWeave / Data Center Cheyenne, WY”

—
302 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“Power to ramp from 88 MW in first phase, expanding to 302 MW total.”

—
Black Hills EnergyShow sources
confidence: confirmed

“Related Digital, CoreWeave / Data Center Cheyenne, WY”

None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Grid-backedSep 28, 2026
Microsoft Cheyenne (expansion)
Unclassified
Cheyenne, WYUnknown
MicrosoftShow sources
confidence: confirmed

“Black Hills Energy Microsoft / Data Center Cheyenne, WY”

————
Black Hills EnergyShow sources
confidence: confirmed

“Black Hills Energy Microsoft / Data Center Cheyenne, WY”

None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 28, 2026
Applied Digital Alexandria
AI campus
Alexandria, LAUnknown
Applied DigitalShow sources
confidence: confirmed

“Applied Digital / Data Center Alexandria, LA”

——
210 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“210 MW data center purpose built for AI training and inference”

—
ClecoShow sources
confidence: confirmed

“Cleco Applied Digital / Data Center Alexandria, LA”

MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Tract Morris
Unclassified
Morris, ILUnknown
TractShow sources
confidence: confirmed

“Tract / Data Center Morris, IL”

——
1 GWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“Tract / Data Center Morris, IL ▪ Data center project, up to 1,000 MW.”

—
Commonwealth Edison (ComEd)Show sources
confidence: confirmed

“Tract / Data Center Morris, IL”

PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentSep 28, 2026
AVAIO Digital Little Rock
Unclassified
Little Rock, ARUnknown
AVAIO DigitalShow sources
confidence: confirmed

“AVAIO Digital / Data Center Little Rock, AR”

——
1 GWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“Entergy to provide 150 MW in 2027 and could grow to 1,000 MW with expansion.”

—
EntergyShow sources
confidence: confirmed

“AVAIO Digital / Data Center Little Rock, AR”

MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Grid-backedSep 28, 2026
Hut 8 West Feliciana
Unclassified
LAUnknown
Hut 8Show sources
confidence: confirmed

“Hut 8 / Data Center West Feliciana Parish, LA”

——
1 GWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“Entergy Louisiana to provide 330 MW initially, with potential to expand to 1,000 MW.”

—
EntergyShow sources
confidence: confirmed

“Hut 8 / Data Center West Feliciana Parish, LA”

MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Grid-backedSep 28, 2026
AVAIO Digital Brandon
Unclassified
Brandon, MSUnknown
AVAIO DigitalShow sources
confidence: confirmed

“AVAIO Digital / Data Center Brandon, MS”

————
EntergyShow sources
confidence: confirmed

“AVAIO Digital / Data Center Brandon, MS”

MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Grid-backedSep 28, 2026
PowerHouse / Poe Louisville
Unclassified
Louisville, KYUnknown
PowerHouse Data CentersShow sources
confidence: confirmed

“PowerHouse Data Centers, Poe Companies / Data Center Louisville, KY”

——
400 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“400 MW data center campus.”

—
LG&E and KU EnergyShow sources
confidence: confirmed

“PowerHouse Data Centers, Poe Companies / Data Center Louisville, KY”

None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Grid-backedSep 28, 2026
Google Hermantown
Unclassified
Hermantown, MNUnknown
GoogleShow sources
confidence: confirmed

“Google / Data Center Hermantown, MN”

——
1 GWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“Google / Data Center Hermantown, MN ▪ 1,000 MW data center project.”

—
Minnesota Power (ALLETE)Show sources
confidence: confirmed

“Google / Data Center Hermantown, MN”

MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Compass Meridian
Unclassified
Meridian, MSUnknown
Compass DatacentersShow sources
confidence: confirmed

“Compass Datacenters / Data Center Meridian, MS”

——
500 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“Approx. 500 MW to be supplied over eight buildings.”

—
Mississippi PowerShow sources
confidence: confirmed

“Compass Datacenters / Data Center Meridian, MS”

None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Applied Digital Center, ND
Unclassified
Center, NDUnknown
Applied DigitalShow sources
confidence: confirmed

“Applied Digital / Data Center Center, ND”

——
430 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“Applied Digital / Data Center Center, ND ▪ 430 MW data center project.”

—
Montana-Dakota UtilitiesShow sources
confidence: confirmed

“Applied Digital / Data Center Center, ND”

SPPEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Google Michigan City
Unclassified
Michigan City, INUnknown
GoogleShow sources
confidence: confirmed

“Google / Data Center Michigan City, IN”

——
300 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“Google / Data Center Michigan City, IN ▪ 300 MW data center project”

—
NIPSCOShow sources
confidence: confirmed

“Google / Data Center Michigan City, IN”

MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Microsoft LaPorte
Unclassified
LaPorte, INUnknown
MicrosoftShow sources
confidence: confirmed

“538 MW data center being developed by Microsoft”

——
538 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“538 MW data center being developed by Microsoft”

—
NIPSCOShow sources
confidence: confirmed

“Microsoft / Data Center Laporte, IN”

MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Atlas Power Butte
Unclassified
Butte, MTUnknown
Atlas Power GroupShow sources
confidence: confirmed

“Atlas Power Group / Data Center Butte, MT”

——
150 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“150 MW data center project. ▪ Initial 75 MW to be available in 2026.”

—
NorthWestern EnergyShow sources
confidence: confirmed

“Atlas Power Group / Data Center Butte, MT”

None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Grid-backedSep 28, 2026
Vantage Storey County
Unclassified
NVUnknown
Vantage Data CentersShow sources
confidence: confirmed

“Vantage Data Centers / Data Center Storey County, NV”

——
224 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“$3 billion, 224 MW data center campus.”

—
NV EnergyShow sources
confidence: confirmed

“Vantage Data Centers / Data Center Storey County, NV”

None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Viking Data Centers Akron
Unclassified
Akron, OHUnknown
Viking Data CentersShow sources
confidence: confirmed

“Viking Data Centers / Data Center Akron, OH”

——
150 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“Viking Data Centers / Data Center Akron, OH ▪ 150 MW data center project.”

—
Ohio EdisonShow sources
confidence: confirmed

“Viking Data Centers / Data Center Akron, OH”

PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Rowan Temple
Unclassified
Temple, TXUnknown
Rowan Digital InfrastructureShow sources
confidence: confirmed

“Rowan Digital Infrastructure / Data Center Temple, TX”

——
300 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“Rowan Digital Infrastructure / Data Center Temple, TX ▪ 300 MW data center project.”

—
Oncor Electric DeliveryShow sources
confidence: confirmed

“Rowan Digital Infrastructure / Data Center Temple, TX”

ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Stream Wilmer
Unclassified
Wilmer, TXUnknown
Stream Data CentersShow sources
confidence: confirmed

“Stream Data Centers / Data Center Wilmer, TX”

——
240 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“$300 million, 240 MW data center.”

—
Oncor Electric DeliveryShow sources
confidence: confirmed

“Stream Data Centers / Data Center Wilmer, TX”

ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
STACK Lancaster
Unclassified
Lancaster, TXUnknown
STACK InfrastructureShow sources
confidence: confirmed

“Stack Infrastructure / Data Center Lancaster, TX”

——
216 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“Data center campus comprised of six, 36 MW data centers for 216 MW total.”

—
Oncor Electric DeliveryShow sources
confidence: confirmed

“Stack Infrastructure / Data Center Lancaster, TX”

ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
SkyBox Lancaster
Unclassified
Lancaster, TXUnknown
SkyBox DatacentersShow sources
confidence: confirmed

“SkyBox / Data Center Lancaster, TX”

——
300 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“SkyBox / Data Center Lancaster, TX ▪ 300 MW data center campus”

—
Oncor Electric DeliveryShow sources
confidence: confirmed

“SkyBox / Data Center Lancaster, TX”

ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
SkyBox Plano
Unclassified
Plano, TXUnknown
SkyBox DatacentersShow sources
confidence: confirmed

“SkyBox / Data Center Plano, TX”

——
100 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“SkyBox / Data Center Plano, TX ▪ 100 MW data center project”

—
Oncor Electric DeliveryShow sources
confidence: confirmed

“SkyBox / Data Center Plano, TX”

ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Applied Digital Toronto, SD
Unclassified
Toronto, SDUnknown
Applied DigitalShow sources
confidence: confirmed

“Applied Digital / Data Center Toronto, SD”

——
430 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“$16 billion, 430 MW data center project.”

—
Otter Tail Power CompanyShow sources
confidence: confirmed

“Otter Tail Power Company Applied Digital / Data Center Toronto, SD”

SPPEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Quantum Frederick Project
Unclassified
MDUnknown———
2.4 GWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“Quantum Frederick Project / Data Center Frederick County, MD ▪ 2,400 MW data center project.”

—
Potomac EdisonShow sources
confidence: confirmed

“Quantum Frederick Project / Data Center Frederick County, MD”

PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
PowerHouse Carlisle
Unclassified
Carlisle, PAUnknown
PowerHouse Data CentersShow sources
confidence: confirmed

“PowerHouse Data Centers / Data Center Carlisle, PA”

——
1.35 GWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“1,350 MW data center complex comprised of three campuses, each with a 450 MW dedicated substation.”

—
PPL Electric UtilitiesShow sources
confidence: confirmed

“PowerHouse Data Centers / Data Center Carlisle, PA”

PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Beale Infrastructure Tucson
Unclassified
Tucson, AZUnknown
Beale InfrastructureShow sources
confidence: confirmed

“Beale Infrastructure / Data Center Tucson, AZ”

————
Tucson Electric PowerShow sources
confidence: confirmed

“Beale Infrastructure / Data Center Tucson, AZ”

None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Grid-backedSep 28, 2026
Hut 8 Beacon Point
Unclassified
Corpus Christi, TXUnknown
Hut 8Show sources
confidence: confirmed

“Hut8 / Data Center Corpus Christi, TX”

——
1 GWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“$17 billion, 1 GW data center project to support AI at the Beacon Point site”

—
American Electric PowerShow sources
confidence: confirmed

“Hut8 / Data Center Corpus Christi, TX”

ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Microsoft San Jose
Unclassified
San Jose, CAUnknown
MicrosoftShow sources
confidence: confirmed

“Microsoft / Data Center San Jose, CA”

——
77 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“77 MW data center includes on-site natural gas generators for backup power and for use in demand response and ancillary services.”

—
Pacific Gas and ElectricShow sources
confidence: confirmed

“Pacific Gas & Electric Company Microsoft / Data Center San Jose, CA”

CAISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Prologis San Jose campus
Unclassified
San Jose, CAUnknown
PrologisShow sources
confidence: confirmed

“Prologis / Data Center and Manufacturing San Jose, CA”

——
400 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“400MW data center campus planned as part of group of data center projects in San Jose”

—
Pacific Gas and ElectricShow sources
confidence: confirmed

“Prologis / Data Center and Manufacturing San Jose, CA”

CAISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
QTS East Windsor
Unclassified
East Windsor, NJUnknown
QTS Data CentersShow sources
confidence: confirmed

“QTS Data Centers / Data Center East Windsor, NJ”

——
70 MWConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: likelyas of Sep 11, 2026

“QTS Data Centers / Data Center East Windsor, NJ ▪ 70 MW data center project.”

—
Jersey Central Power & LightShow sources
confidence: confirmed

“QTS Data Centers / Data Center East Windsor, NJ”

PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 28, 2026
Beaumeade data center site
Unclassified
VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
————
69,800 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Dulles 28 Technology Park data center site
Unclassified
VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
————
508,300 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
Inova Health System Plan data center site
Unclassified
VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
————
429,200 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
Beaumeade data center site
Unclassified
VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
————
336,500 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
Belmont Innovation Station data center site
Unclassified
VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
————
244,000 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
Data center parcel 113162785000
Unclassified
VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
————
244,000 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
—Under constructionOct 12, 2026
Loudoun Metro data center site
Unclassified
VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
Data center parcel 088209173000
Unclassified
VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
————
55,900 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Proposed data center — Beaumeade
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Evergreen Meadows
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — EPLAN-2023-0115
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — EPLAN-2023-0119
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — EPLAN-2023-0122
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Evergreen Meadows
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — EPLAN-2024-0058
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Tuscarora Crossing Lb1 Ph1
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Digital Dulles Land Condo
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Beaumeade
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Steeplechase
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Commonwealth Center
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Mid Dulles Center
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Broad Run Business Center
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Mercure Business Park
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Mercure Business Park
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — EPLAN-2024-0163
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Gateway North
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Mercure Business Park
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Mercure Business Park
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Sterling Park Ip
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Farah Naples
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Paragonpark
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — EPLAN-2024-0205
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Mercure Business Park
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Crosstrail Industrl Land Condo
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — EPLAN-2024-0212
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Amazon Data Services
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Sterling Business Park
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Beaumeade
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Ashburn Village Office Park
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Prologis Exchange
Unclassified
VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
————
474,600 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingOct 12, 2026
Proposed data center — EPLAN-2025-0126
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Stack Broad Run Land Condo
Hyperscale
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
Amazon Web ServicesShow sources
confidence: likely
———
739,000 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Oct 12, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionOct 12, 2026
Proposed data center — EPLAN-2025-0195
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Haynes Waiver
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — LEGI-2023-0064
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026
Proposed data center — Arcola Grove
Unclassified
VA
PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Oct 12, 2026
—————
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Documented developmentOct 12, 2026