DC
/

Stream Data Centers DFWA

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.ColocationBuildingGarland, Dallas County, Texas

Stream Data Centers DFWA is an operating colocation in Garland, Texas. Operated or owned by Stream Data Centers. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.

30% profile completeness
17 claims from 6 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Stream Data Centers DFWA

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Stream Data Centers DFWA.” /facilities/stream-data-centers-dfwa-garland-tx. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_stream_data_centers_dfwa_garland_tx_2026,
  title = {{Stream Data Centers DFWA}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/stream-data-centers-dfwa-garland-tx}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
281,400 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
City of Garland - (Tx) · ERCOT
Substation: Unnamed substation (138 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Stream Data Centers DFWA
  2. substation
    Unnamed substation (138 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.26 km away. Proximity does not establish that it serves the site.
  3. transmission
    138 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.13 km away). Not confirmed as the supply path.
  4. utility
    City of Garland - (Tx)[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    ERCOT[3]
    Service territoryLikely
    Balancing authority: ERCO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for City of Garland - (Tx). Know one? Add a source

Location & imagery

Mapped outline
Coordinates
32.98363, -96.65450
Address
1813 Lookout Drive, Garland, TX 75044[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
County
Dallas County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 6 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Farmers Electric Coop, INC - (Tx), Trinity Valley Elec Coop INC, Hilco Electric Cooperative, INC., Texas-New Mexico Power CO, Oncor Electric Delivery Company LLC.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
ERCOT[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
ERCO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (138 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.3 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
138 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
7.07¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Texas statewide average, July 2026.

State avg. commercial price
8.47¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Texas statewide average, July 2026.

Generation within 50 km
4.23 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

36 EIA-reported plants within 50 km.

Generation queued in county
867 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 1, 2026.Confirmedderived

9 active generation interconnection requests in Dallas County: Storage 817 MW, Other 50 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
138 kV line · Garland Power & LightTransmission line0.13 km138 kV[1]
Lake Hubbard · Luminant Generation Company LLCPower plant (Natural Gas)19.3 km915 MW[6]
Ray Olinger · City of Garland - (TX)Power plant (Natural Gas)21 km395 MW[6]
Wigeon Whistle Battery Storage Plant · Wigeon Whistle BESS LLCPower plant (Batteries)28.2 km120 MW[6]
Forney Energy Center · LaFrontera Holdings LLCPower plant (Natural Gas)29.5 km1.77 GW[6]
State Farm Insur Support Center Central · State Farm Mutual Auto Ins CoPower plant (Petroleum)32.1 km11 MW[6]
Mountain Creek · Mountain Creek Power, LLCPower plant (Natural Gas)39.1 km808 MW[6]
Leon Solar · Cypress Creek RenewablesPower plant (Solar)43.4 km10 MW[6]
Spencer · City of Garland - (TX)Power plant (Natural Gas)48.3 km122 MW[6]
Unnamed substationSubstation0.26 km138 kV[1]
Unnamed substationSubstation0.33 km138 kV[1]
Unnamed substationSubstation0.88 km138 kV[1]
Firewheel Substation · Garland Power & LightSubstation1.35 km138 kV[1]
Unnamed substationSubstation2.5 km—[1]
Largest queued generation in this countyFuelQueue statusMWSource
watermelon 1 energy storageERCOT 27INR0457 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[4]
watermelon 2 energy storageERCOT 27INR0458 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[4]
watermelon 3 energy storageERCOT 27INR0459 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[4]
watermelon 4 energy storageERCOT 27INR0460 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[4]
watermelon 5 energy storageERCOT 28INR0255 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[4]
watermelon 6 energy storageERCOT 28INR0256 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
281,400 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

17
FieldValueSourceConfidenceAs ofStatus
NameStream Data Centers DFWAway/1300765126 name=Stream Data Centers DFWA[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Facility typeColocation[1] derivedUnverified2026-10-12Shown
Websitehttps://www.streamdatacenters.com/locations/dallas-data-centers/[1] Likely2026-10-12Shown
Address1813 Lookout Drive, Garland, TX 75044[1] Likely2026-10-12Shown
OperatorStream Data Centersoperator=Stream Data Centers[1] Likely2026-10-12Shown
UtilityCity of Garland - (Tx)territory 6958: CITY OF GARLAND - (TX) (MUNICIPAL, CITY OF GARLAND - (TX))[2] derivedUnverified2022Shown
ISO / RTOERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.[3] derivedLikely—Shown
Balancing authorityERCO[2] derivedLikely—Shown
Nearest mapped substationUnnamed substation (138 kV)way/1300765155[1] derivedLikely2026-09-28Shown
Distance to substation0.3 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby138 kV[1] derivedLikely2026-09-28Shown
Generation queued in county867 MW[4] derivedConfirmed2026-10-01Shown
State avg. industrial price7.07¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price8.47¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km4.23 GW[6] derivedConfirmed202502Shown
Building footprint281,400 sq ft[1] derivedLikely2026-10-12Shown