QTS Manassas DC5
QTS Manassas DC5 is an operating colocation in Virginia. Operated or owned by QTS Data Centers. Power capacity has not been disclosed or collected yet. Verification: verified operating. 7 cited sources.
Part of QTS Data Centers — Prince William County, VA campus
Follow
Get changes to QTS Manassas DC5
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “QTS Manassas DC5.” /facilities/qts-manassas-dc5-prince-william-county-va. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_qts_manassas_dc5_prince_william_county_v_2026,
title = {{QTS Manassas DC5}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/qts-manassas-dc5-prince-william-county-va}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Community map.
Grid path
- →facilityQTS Manassas DC5
- →substationInnovation Substation (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.41 km away. Proximity does not establish that it serves the site.
- →transmission2187;197 (230 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.32 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates1
- GS-5 rate class for customers demanding 25 MW or more[8]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 25, 2025.Nov 25, 2025Dominion Energy · Virginia State Corporation Commission · Docket PUR-2025-00058 · Final order issued · effective Jan 1, 2027
“the new GS-5 rate class will comprise customers demanding 25 megawatts or more. The new rate class will be effective beginning January 1, 2027.”
Applies to Dominion Energy Virginia's service territory; the facility's utility is the most likely retail provider by location unless a source names it.
Location & imagery
Mapped outline- Coordinates
- 38.75491, -77.51738
- County
- Prince William County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Property owner of record
- Operator
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Northern Virginia Elec Coop.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- PJM[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Innovation Substation (230 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.4 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 10.07¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Virginia statewide average, July 2026.
- State avg. commercial price
- 11.68¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Virginia statewide average, July 2026.
- Generation within 50 km
- 2.91 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
44 EIA-reported plants within 50 km.
- Generation queued in county
- 1.35 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
16 active generation interconnection requests in Prince William County: Storage 1,350 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 2187;197 | Transmission line | 0.32 km | 230 kV | [1] |
| 230 kV line | Transmission line | 0.41 km | 230 kV | [1] |
| 2187 | Transmission line | 0.45 km | 230 kV | [1] |
| 2148;197 | Transmission line | 0.63 km | 230 kV | [1] |
| 2148 | Transmission line | 1.61 km | 230 kV | [1] |
| 2132 · Virginia Electric and Power Company | Transmission line | 1.78 km | 230 kV | [1] |
| Covanta Fairfax Energy · Covanta Fairfax Inc | Power plant (Biomass) | 24.9 km | 98 MW | [7] |
| Possum Point · Virginia Electric & Power Co | Power plant (Natural Gas) | 31.8 km | 645 MW | [7] |
| Remington · Virginia Electric & Power Co | Power plant (Natural Gas) | 32.2 km | 604 MW | [7] |
| Marsh Run Generation Facility · Old Dominion Electric Coop | Power plant (Natural Gas) | 33.3 km | 481 MW | [7] |
| Potomac Energy Center, LLC · Potomac Energy Center LLC | Power plant (Natural Gas) | 33.8 km | 766 MW | [7] |
| Covanta Alexandria/Arlington Energy · Covanta Alexandria/Arlington | Power plant (Biomass) | 34.1 km | 29 MW | [7] |
| Nih Cogeneration Facility · National Institutes of Health | Power plant (Natural Gas) | 45.7 km | 28 MW | [7] |
| Montgomery County Resource Recovery · Covanta Montgomery, Inc. | Power plant (Biomass) | 49.8 km | 54 MW | [7] |
| Innovation Substation | Substation | 0.41 km | 230 kV | [1] |
| Pioneer Switching Substation · Virginia Electric and Power Company | Substation | 0.48 km | 230 kV | [1] |
| Goodwin Delivery Point | Substation | 0.51 km | 115 kV | [1] |
| Unnamed substation | Substation | 0.58 km | — | [1] |
| Hourglass Substation | Substation | 1.01 km | 230 kV | [1] |
| Sandlot Substation · Dominion Energy | Substation | 1.03 km | 230 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Gainesville-Loudoun 230 kVPJM AI2-231 | Storage | In study · proposed 2023-10 | 200 MW | [5] |
| Nokesville-Vint Hill 230 kVPJM AG2-113 | Storage | In study · proposed 2022-08 | 150 MW | [5] |
| Catharpin 230 kVPJM AG2-284 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| Liberty 230 kVPJM AG2-304 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| Possum Point 230 kVPJM AG2-306 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| Possum Point 230kVPJM AH2-034 | Storage | In study · proposed 2028-12 | 100 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquiredMar 12, 2021[2]
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 7695-39-0644 Prince William County, VA | QTS MANASSAS DC-5 LLC ATT: PENNY HARGENS 12851 FOSTER ST, OVERLAND PARK , KS | 22.72 | Use code 191 | — | [2] |
- Site area
- 22.7 acres[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Sum of county land area across parcels.
- Land use
- Use code 191[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Annual property tax
- Not yet sourced
Size
- Building footprint
- 153,800 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Parcel / land records
- 7695-39-0644 (Prince William County)[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
- Mar 12, 2021[2]
Deed recorded for parcel 7695-39-0644 (owner of record: Qts Manassas Dc-5 LLC Att: Penny Hargens).
Other buildings on this campus
3- QTS Manassas DC1Operating · 123,700 sq ft footprint
- QTS Manassas DC3Operating · 138,200 sq ft footprint
- QTS Manassas DC2Operating · 128,300 sq ft footprint
All claims (provenance audit)
20| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | QTS Manassas DC5way/1090837713 name=QTS Manassas DC5 | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-10-12 | Shown |
| Property owner of record | Qts Manassas Dc-5 LLC Att: Penny HargensParcel 7695-39-0644: QTS MANASSAS DC-5 LLC ATT: PENNY HARGENS | [2] | Confirmed | 2026-10-12 | Shown |
| Operator | QTS Data Centersoperator=Quality Technology Services | [1] | Likely | 2026-10-12 | Shown |
| Utility | Dominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE | [3] derived | Unverified | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [4] derived | Likely | — | Shown |
| Balancing authority | PJM | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Innovation Substation (230 kV)way/855005288 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.35 GW | [5] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 10.07¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.91 GW | [7] derived | Confirmed | 202502 | Shown |
| Building footprint | 153,800 sq ft | [1] derived | Likely | 2026-10-12 | Shown |
| Site area | 22.7 acres | [2] | Confirmed | 2026-10-12 | Shown |
| Parcel / land records | 7695-39-0644 (Prince William County) | [2] | Confirmed | 2026-10-12 | Shown |
| Land use | Use code 191 | [2] | Confirmed | 2026-10-12 | Shown |
| Land acquired | Mar 12, 2021 | [2] derived | Confirmed | 2026-10-12 | Shown |