DataBank Plano Data Center
DataBank Plano Data Center is an operating colocation in Plano, Texas. Operated or owned by DataBank. Planned capacity: 12 MW (announced). Verification: announced only. 7 cited sources.
Follow
Get changes to DataBank Plano Data Center
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “DataBank Plano Data Center.” /facilities/databank-plano-data-center-plano-tx. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_databank_plano_data_center_plano_tx_2026,
title = {{DataBank Plano Data Center}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/databank-plano-data-center-plano-tx}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Company announcement, Community map.
Grid path
- →facilityDataBank Plano Data Center (DFW3)
- →substationUnnamed substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 2.79 km away. Proximity does not establish that it serves the site.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityDenton County Elec Coop, INC[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Denton County Elec Coop, INC. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 33.08727, -96.81501
- Address
- 8375 Dominion Parkway, Plano, TX 75024[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- County
- Collin County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 6 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Farmers Electric Coop, INC - (Tx), Grayson-Collin Elec Coop, INC, Texas-New Mexico Power CO, Oncor Electric Delivery Company LLC, Fannin County Electric Coop.
No tenants or end users identified in our sources yet.
Power (all fields)
- Planned capacity
- 12 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely
“12MW Critical IT Load.” — Capacity stated on the operator's facility page (critical IT load). Recorded as design capacity, not as power currently in use.
- Current facility power
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- ERCOT[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- ERCO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Unnamed substation (138 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 2.8 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- State avg. industrial price
- 7.07¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Texas statewide average, July 2026.
- State avg. commercial price
- 8.47¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Texas statewide average, July 2026.
- Generation within 50 km
- 4.85 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
39 EIA-reported plants within 50 km.
- Generation queued in county
- 975 MW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 1, 2026.Confirmedderived
5 active generation interconnection requests in Collin County: Storage 975 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Spencer · City of Garland - (TX) | Power plant (Natural Gas) | 29.7 km | 122 MW | [7] |
| Ray Olinger · City of Garland - (TX) | Power plant (Natural Gas) | 33.8 km | 395 MW | [7] |
| Lake Hubbard · Luminant Generation Company LLC | Power plant (Natural Gas) | 37.6 km | 915 MW | [7] |
| Denton Energy Center · City of Denton - (TX) | Power plant (Natural Gas) | 39.4 km | 226 MW | [7] |
| Mountain Creek · Mountain Creek Power, LLC | Power plant (Natural Gas) | 42 km | 808 MW | [7] |
| Wigeon Whistle Battery Storage Plant · Wigeon Whistle BESS LLC | Power plant (Batteries) | 43.1 km | 120 MW | [7] |
| Noble Solar · BT Noble Solar, LLC | Power plant (Solar) | 43.9 km | 400 MW | [7] |
| Forney Energy Center · LaFrontera Holdings LLC | Power plant (Natural Gas) | 47.6 km | 1.77 GW | [7] |
| Unnamed substation | Substation | 2.79 km | 138 kV | [1] |
| Unnamed substation | Substation | 3 km | 345 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Drake BESSERCOT 25INR0101 · Mallard Energy Storage LLC | Storage | IA signed · proposed 2027-01 | 257 MW | [5] |
| Little Ridge StorageERCOT 25INR0238 · TX BESS B LLC | Storage | In study · proposed 2027-09 | 252 MW | [5] |
| Purple Sage BESS 1ERCOT 25INR0391 · Purple Sage, LLC | Storage | IA signed · proposed 2028-02 | 156 MW | [5] |
| Purple Sage BESS 2ERCOT 25INR0392 · Purple Sage, LLC | Storage | IA signed · proposed 2028-02 | 156 MW | [5] |
| Bufflehead BESSERCOT 24INR0274 · Boxcar Energy Storage, LLC | Storage | IA signed · proposed 2027-02 | 154 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
- Planned capacity
- 12 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely
“12MW Critical IT Load.” — Capacity stated on the operator's facility page (critical IT load). Recorded as design capacity, not as power currently in use.
Real estate
None sourced yet
None sourced yet
None sourced yet
- Site area
- 15.3 acres[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Area of the mapped OSM site outline.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
17| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | DataBank Plano Data Centerway/714120969 name=DataBank Plano Data Center | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-10-12 | Shown |
| Website | https://www.databank.com/data-centers/dallas/plano-campus/plano-data-center/ | [1] | Likely | 2026-10-12 | Shown |
| Address | 8375 Dominion Parkway, Plano, TX 75024 | [1] | Likely | 2026-10-12 | Shown |
| Operator | DataBankoperator=DataBank | [1] | Likely | 2026-10-12 | Shown |
| Utility | Denton County Elec Coop, INCterritory 5078: DENTON COUNTY ELEC COOP, INC (COOPERATIVE, DENTON COUNTY ELEC CO | [2] derived | Unverified | 2022 | Shown |
| Planned capacity | 12 MW | [3] | Likely | 2026-09-30 | Shown |
| ISO / RTO | ERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC. | [4] derived | Likely | — | Shown |
| Balancing authority | ERCO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (138 kV)way/362070191 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 2.8 km | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 975 MW | [5] derived | Confirmed | 2026-10-01 | Shown |
| State avg. industrial price | 7.07¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 8.47¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 4.85 GW | [7] derived | Confirmed | 202502 | Shown |
| Site area | 15.3 acres | [1] derived | Likely | 2026-10-12 | Shown |