Amazon IAD-155
Amazon IAD-155 is an operating hyperscale in Chantilly, Virginia. Operated or owned by Amazon Web Services. Power capacity has not been disclosed or collected yet. Verification: verified operating. 7 cited sources.
Part of Amazon Web Services — Chantilly, VA campus
Follow
Get changes to Amazon IAD-155
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Amazon IAD-155.” /facilities/amazon-iad-155-chantilly-va. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_amazon_iad_155_chantilly_va_2026,
title = {{Amazon IAD-155}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/amazon-iad-155-chantilly-va}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Permit / site plan, Community map.
Grid path
- →facilityAmazon IAD-155
- →substationPoland Road Substation (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.18 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.21 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates1
- GS-5 rate class for customers demanding 25 MW or more[8]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 25, 2025.Nov 25, 2025Dominion Energy · Virginia State Corporation Commission · Docket PUR-2025-00058 · Final order issued · effective Jan 1, 2027
“the new GS-5 rate class will comprise customers demanding 25 megawatts or more. The new rate class will be effective beginning January 1, 2027.”
Applies to Dominion Energy Virginia's service territory; the facility's utility is the most likely retail provider by location unless a source names it.
Location & imagery
Mapped outline- Coordinates
- 38.91590, -77.49055
- Address
- 43774 Clubber Lane, Chantilly, VA 20152[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- County
- Loudoun County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Property owner of record
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- PJM[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Poland Road Substation (230 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.2 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 10.07¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Virginia statewide average, July 2026.
- State avg. commercial price
- 11.68¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Virginia statewide average, July 2026.
- Generation within 50 km
- 3.36 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
60 EIA-reported plants within 50 km.
- Generation queued in county
- 1.04 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
11 active generation interconnection requests in Loudoun County: Storage 940 MW, Solar 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line · Virginia Electric and Power Company | Transmission line | 0.21 km | 230 kV | [1] |
| 2137;2183 · Dominion Energy | Transmission line | 0.26 km | 230 kV | [1] |
| Potomac Energy Center, LLC · Potomac Energy Center LLC | Power plant (Natural Gas) | 16.5 km | 766 MW | [7] |
| Dickerson Power · Dickerson Power, LLC | Power plant (Natural Gas) | 32.7 km | 299 MW | [7] |
| Covanta Fairfax Energy · Covanta Fairfax Inc | Power plant (Biomass) | 32.7 km | 98 MW | [7] |
| Possum Point · Virginia Electric & Power Co | Power plant (Natural Gas) | 45.9 km | 645 MW | [7] |
| Central Utility Plant At White Oak · GSA Metropolitan Service Center | Power plant (Natural Gas) | 46 km | 54 MW | [7] |
| Remington · Virginia Electric & Power Co | Power plant (Natural Gas) | 48 km | 604 MW | [7] |
| Blake Solar Plant · Horus West Virginia 1, LLC | Power plant (Solar) | 48.7 km | 80 MW | [7] |
| Marsh Run Generation Facility · Old Dominion Electric Coop | Power plant (Natural Gas) | 49.4 km | 481 MW | [7] |
| Poland Road Substation · Virginia Electric and Power Company | Substation | 0.18 km | 230 kV | [1] |
| Aviator Substation | Substation | 0.91 km | 230 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Loudoun 230 kVPJM AG2-285 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| Beaumeade 230 kVPJM AG2-287 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| New Road StoragePJM AE2-019 | Storage | IA signed · proposed 2026-12 | 120 MW | [5] |
| Dulles SolarPJM AF1-147 | Solar | IA signed · proposed 2023-12 | 100 MW | [5] |
| Roundtable 230 kVPJM AG2-307 | Storage | In study · proposed 2023-12 | 100 MW | [5] |
| Shelhorn 230 kVPJM AG2-323 | Storage | In study · proposed 2023-12 | 100 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
- Permit / case numbers
- B10254120100, B00236340100, B70385100100, B50362480100, B10319860100[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Real estate
None sourced yet
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 097354183000 Loudoun County, VA | AMAZON DATA SERVICES, INC Project: Icsp @ Eastgate | 48.02 | CLI · Data Center | 629,505 built | [2] |
- Site area
- 48 acres[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Legal acreage of the parcel(s).
- Zoning
- CLI[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Land use
- Data Center[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Annual property tax
- Not yet sourced
Size
- Floor area
- 629,500 sq ft[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Building area on the county's data-center parcel inventory (from building permits).
- Building footprint
- 87,800 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Parcel / land records
- MCPI 097354183000 (Loudoun County)[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
9- Amazon IAD-61Operating · 152,500 sq ft footprint
- Amazon IAD-63Operating · 144,200 sq ft footprint
- Amazon IAD-65Operating · 151,600 sq ft footprint
- Amazon IAD-86Operating · 150,300 sq ft footprint
- AWSOperating · 13,900 sq ft footprint
- Amazon IAD-156Under construction · 134,100 sq ft footprint
- Amazon IAD-152Operating · 156,900 sq ft footprint
- Amazon IAD-150Operating · 213,900 sq ft footprint
- Amazon IAD-151Operating · 155,800 sq ft footprint
All claims (provenance audit)
28| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Amazon IAD-155way/1252196799 name=Amazon IAD-155 | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Status | Operating | [2] derived | Confirmed | 2026-10-12 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-10-12 | Shown |
| Address | 43774 Clubber Lane, Chantilly, VA 20152 | [1] | Likely | 2026-10-12 | Shown |
| Property owner of record | Amazon Web ServicesMCPI 097354183000: AMAZON DATA SERVICES, INC | [2] | Confirmed | 2026-10-12 | Shown |
| Operator | Amazon Web Servicesoperator=Amazon Web Services | [1] | Likely | 2026-10-12 | Shown |
| Utility | Dominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE | [3] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [4] derived | Likely | — | Shown |
| Balancing authority | PJM | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Poland Road Substation (230 kV)way/686326402 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.2 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.04 GW | [5] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 10.07¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.36 GW | [7] derived | Confirmed | 202502 | Shown |
| Permit / case numbers | B10254120100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B00236340100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B70385100100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B50362480100 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | B10319860100 | [2] | Confirmed | 2026-10-12 | Shown |
| Floor area | 629,500 sq ft | [2] | Confirmed | 2026-10-12 | Shown |
| Building footprint | 87,800 sq ft | [1] derived | Likely | 2026-10-12 | Shown |
| Site area | 48 acres | [2] | Confirmed | 2026-10-12 | Shown |
| Parcel / land records | MCPI 097354183000 (Loudoun County) | [2] | Confirmed | 2026-10-12 | Shown |
| Zoning | CLI | [2] | Confirmed | 2026-10-12 | Shown |
| Land use | Data Center | [2] | Confirmed | 2026-10-12 | Shown |