Amazon IAD-128
Amazon IAD-128 is an under construction hyperscale in Sterling, Virginia. Operated or owned by Amazon Web Services. Current power: 55 MW (estimated). Verification: under construction. 9 cited sources.
Part of Amazon Web Services — Sterling, VA campus
Follow
Get changes to Amazon IAD-128
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Amazon IAD-128.” /facilities/amazon-iad-128-sterling-va. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_amazon_iad_128_sterling_va_2026,
title = {{Amazon IAD-128}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/amazon-iad-128-sterling-va}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
- ⚠ No public interconnection record for this load — PJM does not publish large-load requests.
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Permit / site plan, Community map.
Grid path
- →facilityAmazon IAD-128
- →substationBeco Substation (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.78 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.74 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits1
- Air permit VA0000005110774170[9]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Dec 10, 2024.Dec 10, 202480% Synthetic Minor Emissions · Operating · No Violation Identified · Programs: State Implementation Plan
ECHO lists “AMAZON DATA SERVICES, INC. IAD-116 IAD-117” at 45781 MARIES ROAD, STERLING, 72 m from this facility's mapped location (matched by location; the permit name matches this facility or its companies).
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates1
- GS-5 rate class for customers demanding 25 MW or more[10]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 25, 2025.Nov 25, 2025Dominion Energy · Virginia State Corporation Commission · Docket PUR-2025-00058 · Final order issued · effective Jan 1, 2027
“the new GS-5 rate class will comprise customers demanding 25 megawatts or more. The new rate class will be effective beginning January 1, 2027.”
Applies to Dominion Energy Virginia's service territory; the facility's utility is the most likely retail provider by location unless a source names it.
Location & imagery
Mapped outline- Coordinates
- 39.02304, -77.41698
- Address
- 45781 Maries Road, Sterling, VA 20166[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- County
- Loudoun County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Property owner of record
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- 55 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- Estimated annual consumption
- 337 GWh/yr[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated
55 MW × 8,760 h × 70% utilization.
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- PJM[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Beco Substation (230 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 1.8 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 10.07¢/kWh[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Virginia statewide average, July 2026.
- State avg. commercial price
- 11.68¢/kWh[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Virginia statewide average, July 2026.
- Generation within 50 km
- 1.67 GW[8]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
75 EIA-reported plants within 50 km.
- Generation queued in county
- 1.04 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
11 active generation interconnection requests in Loudoun County: Storage 940 MW, Solar 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line | Transmission line | 1.74 km | 230 kV | [1] |
| 2165 · Virginia Electric & Power Company | Transmission line | 1.79 km | 230 kV | [1] |
| 2143;2249 | Transmission line | 1.8 km | 230 kV | [1] |
| 2143;2207 | Transmission line | 1.85 km | 230 kV | [1] |
| 2081;2150 · Dominion Energy | Transmission line | 1.92 km | 230 kV | [1] |
| Potomac Energy Center, LLC · Potomac Energy Center LLC | Power plant (Natural Gas) | 11.7 km | 766 MW | [8] |
| Montgomery County Resource Recovery · Covanta Montgomery, Inc. | Power plant (Biomass) | 20 km | 54 MW | [8] |
| Dickerson Power · Dickerson Power, LLC | Power plant (Natural Gas) | 21.2 km | 299 MW | [8] |
| Nih Cogeneration Facility · National Institutes of Health | Power plant (Natural Gas) | 28 km | 28 MW | [8] |
| Covanta Alexandria/Arlington Energy · Covanta Alexandria/Arlington | Power plant (Biomass) | 35.1 km | 29 MW | [8] |
| Central Utility Plant At White Oak · GSA Metropolitan Service Center | Power plant (Natural Gas) | 37.6 km | 54 MW | [8] |
| Covanta Fairfax Energy · Covanta Fairfax Inc | Power plant (Biomass) | 39.5 km | 98 MW | [8] |
| Blake Solar Plant · Horus West Virginia 1, LLC | Power plant (Solar) | 44.8 km | 80 MW | [8] |
| Beco Substation · Dominion Energy | Substation | 1.78 km | 230 kV | [1] |
| DTC substation | Substation | 1.94 km | 230 kV | [1] |
| Paragon Park Substation | Substation | 2.17 km | 230 kV | [1] |
| Interconnection Substation · Dominion Energy | Substation | 2.78 km | 230 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Loudoun 230 kVPJM AG2-285 | Storage | In study · proposed 2023-12 | 150 MW | [6] |
| Beaumeade 230 kVPJM AG2-287 | Storage | In study · proposed 2023-12 | 150 MW | [6] |
| New Road StoragePJM AE2-019 | Storage | IA signed · proposed 2026-12 | 120 MW | [6] |
| Dulles SolarPJM AF1-147 | Solar | IA signed · proposed 2023-12 | 100 MW | [6] |
| Roundtable 230 kVPJM AG2-307 | Storage | In study · proposed 2023-12 | 100 MW | [6] |
| Shelhorn 230 kVPJM AG2-323 | Storage | In study · proposed 2023-12 | 100 MW | [6] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
- Permit / case numbers
- BLDC-2024-055076[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Real estate
None sourced yet
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 030286764000 Loudoun County, VA | MARIES TECH PARK II LLC Project: Tall Oaks | 9.6 | IP (ZRTD-2017-0007) · Data Center | 218,112 under construction | [2] |
- Site area
- 9.6 acres[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Legal acreage of the parcel(s).
- Zoning
- IP[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Land use
- Data Center[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Annual property tax
- Not yet sourced
Size
- Floor area
- 218,100 sq ft[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Building area on the county's data-center parcel inventory (from building permits).
- Building footprint
- 111,000 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Parcel / land records
- MCPI 030286764000 (Loudoun County)[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
What changed (last 3 years)
Follow this facility (RSS)- StatusOperatingSep 27, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→Under constructionSep 27, 2026[2]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Timeline
No dated events sourced yet.
Other buildings on this campus
13- Amazon IAD-10Operating · 112,900 sq ft footprint
- Amazon IAD-32Operating · 35,800 sq ft footprint
- Amazon IAD-98Operating · 151,000 sq ft footprint
- Amazon IAD-99Operating · 151,000 sq ft footprint
- Amazon IAD-118Operating · 105,800 sq ft footprint
- Amazon IAD-119Operating · 127,300 sq ft footprint
- Amazon IAD-129Operating · 105,900 sq ft footprint
- Amazon IAD-174Operating · 132,600 sq ft footprint
- Amazon IAD-601Operating · 14,400 sq ft footprint
- Amazon IAD-117Operating · 102,600 sq ft footprint
- Amazon IAD-116Operating · 102,800 sq ft footprint
- Amazon IAD-163Operating · 132,100 sq ft footprint
- Amazon IAD-164Operating · 132,600 sq ft footprint
All claims (provenance audit)
26| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Amazon IAD-128way/1555352691 name=Amazon IAD-128 | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Superseded / alternative |
| Status | Under construction | [2] derived | Confirmed | 2026-10-12 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-10-12 | Shown |
| Address | 45781 Maries Road, Sterling, VA 20166 | [1] | Likely | 2026-10-12 | Shown |
| Property owner of record | Maries Tech Park II LLCMCPI 030286764000: MARIES TECH PARK II LLC | [2] | Confirmed | 2026-10-12 | Shown |
| Operator | Amazon Web Servicesoperator=Amazon Web Services | [1] | Likely | 2026-10-12 | Shown |
| Utility | Dominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE | [3] derived | Likely | 2022 | Shown |
| Current facility power | 55 MWinput:electricity=55 MW | [1] | Likely | 2026-10-12 | Shown |
| Estimated annual consumption | 337 GWh/yr | [4] estimated | Speculative | 2026-10-12 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [5] derived | Likely | — | Shown |
| Balancing authority | PJM | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Beco Substation (230 kV)way/61699342 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.8 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.04 GW | [6] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 10.07¢/kWh | [7] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [7] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.67 GW | [8] derived | Confirmed | 202502 | Shown |
| Permit / case numbers | BLDC-2024-055076 | [2] | Confirmed | 2026-10-12 | Shown |
| Floor area | 218,100 sq ft | [2] | Confirmed | 2026-10-12 | Shown |
| Building footprint | 111,000 sq ft | [1] derived | Likely | 2026-10-12 | Shown |
| Site area | 9.6 acres | [2] | Confirmed | 2026-10-12 | Shown |
| Parcel / land records | MCPI 030286764000 (Loudoun County) | [2] | Confirmed | 2026-10-12 | Shown |
| Zoning | IP | [2] | Confirmed | 2026-10-12 | Shown |
| Land use | Data Center | [2] | Confirmed | 2026-10-12 | Shown |