Data centers in Bell County, Texas
Datacenter Source tracks 3 data centers in Bell County, Texas. Facilities that disclose power add up to 231 MW online and 0 MW in the pipeline — floors, since 67% report a figure.
Follow
Get changes to Bell County, Texas
Or subscribe in a feed reader: RSS / Atom
Facilities
- Meta Temple AI campus · TempleOperating231 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Rowan Temple Unclassified · TempleUnknown
- Unnamed data center UnclassifiedOperating
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
No dated queue filings for this county in the files we ingest (some ISOs don't publish a county or filing date).
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
Not yet collected
Not yet collected
Not yet collected for this state's utilities.
Not yet collected
Recent changes
- Sep 30, 2026 · Meta Temple EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current IT capacity: 152 MW → 178 MW
- Sep 30, 2026 · Meta Temple EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current facility power: 198 MW → 231 MW
- Sep 30, 2026 · Meta Temple EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Compute (H100-equivalents): 173,200 → 202,500
- Sep 30, 2026 · Meta Temple EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Capital cost / investment: $5.8B → $6.7B
- Sep 30, 2026 · Meta Temple EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 2 → 3
- Sep 30, 2026 · Meta Temple EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Operating + expanding → Operating
- Sep 30, 2026 · Meta Temple EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Building 3 is operational. Based on the stated completion date in this regulatory filing
- Dec 9, 2025 · Meta Temple EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 0 → 2
- Dec 9, 2025 · Meta Temple EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Under construction → Operating + expanding
- Dec 9, 2025 · Meta Temple EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Building 1 and 2 are operational. Activity related to the air quality permit (namely, emergency diesel generators) was reported to have started as of 2025-12-09. This is our best estimate, but note that the planned co…